New Zealand Cycle Trail Explained

The New Zealand Cycle Trail project (Māori: Nga Haerenga, "The Journeys") is a New Zealand government initiative, co-funded together with local councils and charitable trusts, which is to build and operate a network of cycle routes through the country.

As of mid-2011, the first of 18 proposed 'Great Rides' (dedicated cycleways, mostly off-road and in particularly scenic locations) were being finished, while construction was ongoing on most of the others. The first set of 'Touring Routes' (mostly on-road, to connect Great Rides), had also been announced. At the end of 2013, with the initial $50 million (plus local co-funding) essentially all spent or allocated, about 19 routes were expected to be in operation.[1] By 2016, when added funding was announced, the total route length was about 2500km (1,600miles). The addition of Whakarewarewa Forest Loop in 2022[2] brought the total number of 'Great Rides' to 23, covering 2755km (1,712miles), ranging from the 21km (13miles) Roxburgh Gorge Trail to the 315km (196miles) Alps 2 Ocean Cycle Trail.[3]

History

Originally called the New Zealand Cycleway, and later the National Cycleway Project, it was initially conceived as a cycling route to run through the length of New Zealand, "from Kaitaia to Bluff". It was proposed by then Prime Minister John Key as the 21st "surprise" item of the national job summit held by the New Zealand Government in early 2009.[4]

John Key, who was also Minister of Tourism, noted that as of the middle of March 2009, officials were working "actively and aggressively" on a plan to implement the cycleway,[4] though the original idea of a direct route was abandoned in favour of linking a network of existing paths and new sections, which Key termed 'Great Rides' in allusion to the New Zealand Great Walks system of famous tramping or hiking tracks. The individual routes are to be connected into a New Zealand-wide network in the long term.

John Key noted that to retain momentum on the process, the first sections to be funded would be publicised by June 2009. This was slightly pushed out until July 2009, when the first seven projects were announced, to receive $9 million in funding.[5] [6] In November 2009, construction started on the Waikato River Trails, the first of the quick-start projects, which received $3 million in funding to construct 41 km of track and thereby finish a 100 km long cycle trail along the Waikato River.[7]

In the second stage of the project, it was announced in February 2010 that out of 54 applications (beyond the quick-start trails), 13 had been selected to receive funding (pending further feasibility studies). If all these trails and the quick-start trails were realised, they would provide over 2,000 km of trail.[8] In September 2010, funding for another five tracks was confirmed, bringing the total up to 18.[9]

On 2 July 2010, Prime Minister John Key opened the first segment completed with cycle trail funding, being the 'Old Coach Road' segment of the Ruapehu to Whanganui Nga Ara Tuhono trail.[10] By November 2010, eight trails were under construction, and the first full "Great Ride", the St James Trail located near Hanmer Springs, opened in November 2010.[11] [12]

In mid-2011, it was announced that Sarah Ulmer would be the official 'ambassador' for the New Zealand Cycle Trail.[13] In May 2011, a customer-focused website was launched for the trails.

In January 2012, the most famous existing cycle route of the country, the Otago Central Rail Trail, became a part of the Cycle Trail umbrella organisation.[14]

In February 2013, it was announced that with most project and funding-allocation work completed after 4 years, the number of permanent NZCT staff would be reduced from 7 to 3.[1]

In mid 2016, another $25 million of funding (plus associated local Council co-funding) was announced by government, with approximately $13m of the funding planned to pay for connecting four Great Rides cycle trails in Central Otago into a connected 536 km track network. The remainder of the funds would be open for local applications.[15]

Characteristics

Project scope

The cycleway was originally proposed to be a continuous route with a concrete surface,[4] and it was proposed that the Department of Conservation was to supervise the construction process.[16] Cycling advocates noted that having the feasibility study undertaken by the Ministry of Tourism, rather than the Ministry of Transport, boded well for the future of the project.[17]

In the middle of March 2009, comments started to emerge from government indicating that the initial vision of a single track throughout the country would probably not be realised, at least not in the same form. Rather, it was now envisaged that a whole network of tracks would be created, combined from existing part sections, or upgraded from other forms of tracks and roads. The tracks would likely be to different standards in different areas, as some estimates have set the cost for the original proposal of a full track formed in concrete at least $300m rather than the $50m initially suggested.[18]

Setting out further specifics, in May 2009 it was confirmed that instead of a single route throughout New Zealand, the project would, at least initially, concentrate on a number of promising individual links. Substantial parts of these routes could use existing railway corridor reserves or possibly paper roads, or existing cycle infrastructure, where present. They would also have the ability to run through conservation land where appropriate, and take into account existing tourist destinations, thus providing particularly interesting routes.

Prime Minister John Key, in mid-2010, noted that he expected 2,000 km of cycleway to be completed by the end of 2011.[19]

Intended benefits

The intention of the trail, apart from creating jobs in an economic downturn (both in construction and later in the tourism industry associated with it), is to provide local and international cycle tourists with a route to travel on.[20] Cycle Action Auckland noted in an editorial that the Otago Central Rail Trail had brought substantial benefits to an otherwise struggling rural region, and had been assessed as supporting up to 1,000 full and part-time jobs in the region, and that the tourism benefits of a national cycleway would likely be similar.[21] Cycling Advocates' Network supports the proposal as encouraging cycling in New Zealand, while walking advocates also see benefits to be gained from such a route.[22] Tourism New Zealand noted that the project could also provide a much-needed boost to the viability and funding of many cities' languishing cycling strategies and plans.[23]

Ministry of Tourism figures show that so far (as of 2009), only about 2% of all tourists to New Zealand undertake cycling as part of their activities. The data did however also indicate that cycling tourists stay more than twice as long as the average tourists, and during their time in the country spend about 1.6 times as much as the average tourist.[24] Tourism New Zealand also noted that so far, there was effectively no promotion of New Zealand cycling to overseas tourists, even though it was a significant tourism industry in places like Europe.[23]

Estimates for the quick-start projects estimate that each might occupy approximately 40 people in the initial construction period.[25] Prime Minister John Key noted that he expected about 500 jobs to be provided in construction of the cycleways in total, with up to 4,000 eventually created through tourism benefits the trails would bring.[19] In mid-2011, the newsletter of the New Zealand Cycle Trail reported 511 people employed on trail construction.[26] Job experiences from the Far North District were also positive – among other effects, it was reported that of 110 formerly unemployed young people who worked on the project for half a year as part of a government subsidy scheme, 80 had gone on to other work, rather than returning to the dole.[27]

Funding

In May 2009, the government announced that $50 million had been allocated for the cycleway in the budget for the coming three years, provided by the Ministry of Tourism. It was hoped that local authorities and other entities would also provide further sums,[28] with co-funded projects receiving priority for money from the budget.[29]

Of the total sum, $2.5m have been set aside for management and advisory functions in the Ministry of Tourism, while $47.5m will be used to create the National Cycleway Project Fund, from which successful applicants will draw money for construction of routes.[29] By September 2010, $45.6m had been allocated to track construction, and had attracted a further $30m in co-funding from local Councils and other organisations.[9]

In July 2010, it was announced that 8 of the 13 cycle trails had received the go-ahead, four needed further study, and one (Tauranga Moana) had been rejected, due to land-use/access issues making the proposal unfeasible in the short term. $18.8 million have been set aside for the approved tracks, with the local authorities adding another $16 million to the project costs.[30] [31] Five more tracks from the list were approved in September 2010.[9]

Among the projects that had applied for funding from the new fund after the scope was changed are routes in urban Auckland, as well as on Waiheke Island and Great Barrier Island.[32] However, none of these were successful, though Nikki Kaye, National MP for Auckland, and other sponsors of the proposals, such as Cycle Action Auckland were optimistic that deserving projects like the Waiheke Cycle Trail would still be realised by other means.[33]

In February 2014, Prime Minister John Key announced $8 million worth of maintenance funding over four years for the New Zealand Cycle Trail Great Rides[34]

In May 2016, another $25m of new-route funding was announced.[15]

In December 2023, the New Zealand Cycle Trail network expanded with the commencement of construction on a new section linking Queenstown to Cromwell, funded through a collaboration among the New Zealand Government, Central Lakes Trust, and Otago Community Trust, reflecting the ongoing investment in the trail system.[35]

Routes

Great Rides

North Island
South Island

Touring Routes

In mid-2011, the New Zealand Cycle Trail announced a second type of route, the "touring route". Composed mainly of existing on-road routes (rather than new dedicated cycleways), these routes are to start linking the various Great Rides and New Zealand in general with officially designated cycling routes, chosen for scenic appeal and suitability for cycling (low motor vehicle traffic volumes etc...). The first three such routes announced, all centred on Taumarunui in the central north island, were:[64]

Public reactions

Pre-openingWhile many cycling groups and tourism interests such as Tourism New Zealand greeted the project with enthusiasm,[23] there has also been scepticism, mainly related to the potential costs of the project, and the scope for economical benefits. Editorialist Brian Rudman has also claimed that the cycleway idea smacked of Depression Era make-work schemes for the working classes.[65] Others have countered the criticism noting that the money spent on the cycleway would go back into the New Zealand economy in any case, and leave the country with a lasting infrastructural benefit.[66]

Editorialists have remarked that the Prime Minister remained clearly behind the project he helped launch, despite criticism about changes in the estimated costs, and the shift from the initial concept of a single track towards a network.[67]

The project has also created enthusiasm among some business groups, with, for example, a meeting of 130 Waikato business and government representatives endorsing it for the tourism, health and economic benefits it could bring to Hamilton and the Waikato.[68] Also supportive was the New Zealand Contractors' Federation, which considered that it would be very beneficial for many small and medium enterprises during hard economic times.[69]

The cycleway project is also seen as a potential lifeline for small town such as Kumara on the West Coast. The small town, a former gold mining centre, now has only a few hundred inhabitants left, and is facing the closure of its only remaining store. Westland's Mayor Maureen Pugh noted that the Westland Wilderness Trail, which was selected as one of the 13 Phase II trails, could be a "saving grace" by bringing tourism into the area.[70] Similar hopes have been expressed by locals in towns like Kaikohe in Northland.[27] Occasionally, locals, especially farmers, have however expressed concerns that vandalism would occur when tourists on bikes travelled through previously inaccessible areas, though experiences from the Otago Rail Trail indicates that such fears are overstated.[14]

See also

Further reading

External links

Notes and References

  1. News: PM's cycleway gets in gear. 25 August 2013. The New Zealand Herald. 16 February 2013.
  2. Web site: Sabin . Brook . 2022-05-22 . Whakarewarewa Forest Loop: We test the new Great Ride with mud pools and an emerald lake . 2024-01-03 . Stuff . en.
  3. Web site: Find Your Ride . 2024-01-03 . Ngā Haerenga New Zealand Cycle Trails . en.
  4. News: Concrete plan for Key's bike route . Gower, Patrick . 11 March 2009 . . 30 October 2011.
  5. http://www.tourism.govt.nz/Our-Work/New-Zealand-Cycle-Trail-Project/New-Zealand-Cycle-Trail-Quick-Start-Tracks/ New Zealand Cycleway Quick Start Tracks
  6. News: Struggling regions welcome trail news . Booker, Jarrod . 28 July 2009 . . 30 October 2011.
  7. News: PM turns first sod on cycleway project . 10 November 2009 . . . 30 October 2011.
  8. News: Thirteen new cycle trails considered. 11 February 2010. The New Zealand Herald. 28 February 2010.
  9. News: Five new cycle trails get the green light . 29 September 2010. Media statement – Rt Hon John Key Prime Minister Minister of Tourism. 23 September 2010.
  10. News: Key opens first cycleway segment. The New Zealand Herald. 6 July 2010. 2 July 2010.
  11. News: Trail Talk . 1 . 1 . NZCT newsletter . November 2010.
  12. News: Government News – St James Cycle Trail ready to ride . Chainlinks . 4 . December 2010 . Cycling Advocates Network . 4.
  13. News: PM Announces Sarah Ulmer As Cycle Trail Ambassador. 30 July 2011. Voxy. 25 May 2011.
  14. News: Pioneering Otago rail trail joins national cycleway. 17 January 2012. 2 January 2012.
  15. News: John Key announces boost to regional tourism with $25m cycle trail funding. 15 May 2016. TVNZ.
  16. News: Best job ideas in Budget round – English . Field, Michael . 2 March 2009 . . 30 October 2011.
  17. http://www.ridestrong.org.nz/RS/blogs/national_cycleway/archive/2009/03/13/from-the-desk-of-the-national-cycleway.aspx From the Desk of the National Cycleway
  18. News: Second thoughts turn Key's track into a network . Mathew Dearnaley and Patrick Gower . 24 March 2009 . . 30 October 2011.
  19. News: Key confident cycleway will add more jobs. The New Zealand Herald. 6 July 2010. 1 June 2010. Derek. Cheng. Mathew. Dearnaley.
  20. News: Cycleway 'being taken seriously', Key says . 10 March 2009 . . . 30 October 2011.
  21. News: Barbara Cuthbert: Key could be on the right track with cycleway . 10 March 2009 . . 30 October 2011.
  22. Cycleway Would Benefit Walkers TooLiving Streets Aotearoa press release via scoop.co.nz, Saturday, 28 February 2009
  23. News: Is the cycleway a winner? . Churchouse, Nick . 21 March 2009 . . 30 October 2011.
  24. News: Why Key's national bike track could be paved with gold . Parker, Tamsyn . 23 March 2009 . . 30 October 2011.
  25. News: Cycle track plan moves at snail's pace. 27 February 2010. The New Zealand Herald. 20 March 2010. Eloise. Gibson.
  26. News: Trail Talk . 7 . 7 . NZCT newsletter . August 2011.
  27. News: Track a boost for job hungry towns . 17 January 2012 . . 27 December 2011.
  28. News: Cycleway gets $50m – now a series of 'Great Rides' says Key . Daniels, Chris . 14 May 2009 . . 30 October 2011.
  29. Investment for the Development of the New Zealand Cycleway Project – Cabinet Paper, Ministry of Tourism, May 2009
  30. News: Eight new cycle trails ready to roll . 29 September 2010 . 6 July 2010.
  31. News: Work to start on eight new cycle trails. 10 July 2010. 6 July 2010. The New Zealand Herald.
  32. News: Great Barrier wants cycleway link . Dearnaley, Mathew . 11 January 2010 . . 30 October 2011.
  33. News: No place for Auckland on national cycle trail. 12 February 2010. The New Zealand Herald. 28 February 2010. Rachel. Tiffen.
  34. News: Cycling trails get a boost . 1 March 2014 . . 8 March 2014.
  35. Web site: Trail Linking Queenstown and Cromwell Begins Construction . January 2024 . NEWS WIRE .
  36. Web site: Great Lake Trails Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  37. Web site: The Hauraki Rail Trail Great Ride . 2024-01-03 . Ngā Haerenga New Zealand Cycle Trails . en.
  38. Web site: Hawke's Bay Trails Great Ride . 2024-01-03 . Ngā Haerenga New Zealand Cycle Trails . en.
  39. Web site: Motu Trails Great Ride . 2024-01-03 . Ngā Haerenga New Zealand Cycle Trails . en.
  40. Web site: Mountains to Sea Ngā Ara Tūhono Cycle Trail/Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  41. Web site: Pou Herenga Tai Twin Coast Cycle Trail – Northland's Great Ride . 2024-01-03 . Ngā Haerenga New Zealand Cycle Trails . en.
  42. Web site: Remutaka Cycle Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  43. Web site: Timber Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  44. Web site: 27 November 2012 . Timber Trail Cycle Trail section opening . 2024-01-04 . www.doc.govt.nz . en-nz.
  45. Web site: 3 May 2010 . Construction starts on Central North Island Rail Trail . 2024-01-04 . www.doc.govt.nz . en-nz.
  46. Web site: The Waikato River Trails Great Ride . 2024-01-03 . Ngā Haerenga New Zealand Cycle Trails . en.
  47. News: Time to pedal new Waikato tourist attraction. 5 November 2011. Waikato Times. 3 November 2011.
  48. Web site: Whakarewarewa Forest Loop Great Ride . 2024-01-03 . Ngā Haerenga New Zealand Cycle Trails . en.
  49. Web site: Alps 2 Ocean Cycle Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  50. Web site: Around the Mountains Cycle Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  51. Web site: Clutha Gold Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  52. Web site: The Coppermine Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  53. Web site: Lake Dunstan Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  54. Web site: The Old Ghost Road Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  55. Web site: The Otago Central Rail Trail – New Zealand's original Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  56. Web site: The Otago Central Rail Trail – our original Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  57. Web site: The Queen Charlotte Track Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  58. News: 1 Mar: Queen Charlotte Track opening. 13 May 2013. New Zealand Cycle Trail Website. https://web.archive.org/web/20130227074307/http://www.nzcycletrail.com/news-events/1-mar-queen-charlotte-track-opening. 27 February 2013. dead.
  59. Web site: Queenstown Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  60. Web site: Roxburgh Gorge Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  61. Web site: St James Cycle Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  62. Web site: Tasman's Great Taste Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  63. Web site: West Coast Wilderness Trail Great Ride . 2024-01-04 . Ngā Haerenga New Zealand Cycle Trails . en.
  64. News: First cycle touring routes opening. Media Release, New Zealand Cycle Trail. 29 July 2011.
  65. News: Brian Rudman: Don't recycle culture into construction . Rudman, Brian . Brian Rudman . 4 March 2009 . . 30 October 2011.
  66. News: Let's get this cycle way right . Sheppard, Bruce . 4 March 2009 . . 30 October 2011.
  67. News: John Armstrong: National cycleway no joking matter . Armstrong, John . 24 March 2009 . . 30 October 2011.
  68. News: Bike plan has Waikato in a spin . Ihaka, James . 24 March 2009 . . 30 October 2011.
  69. http://www.scoop.co.nz/stories/BU0903/S00215.htm Proposals for North to South Cycleway Welcome
  70. News: Hope rests on cycleway . 18 March 2010 . The Press. 31 March 2010.