The New York and Putnam Railroad, nicknamed the Old Put, was a railroad line that operated between the Bronx and Brewster in New York State. It was in close proximity to the Hudson River Railroad and New York and Harlem Railroad. All three came under ownership of the New York Central system in 1894. The railroad was abandoned starting in 1958, and most of the former roadbed has been converted to rail trail use.

History

Early years, charter

The New York & Boston Railroad (NY&B) was chartered on May 21, 1869[1] to build a line from Highbridge on the Harlem River in New York northeast to Brewster. At Brewster connections were to be provided to the New York & Harlem Railroad for travel north to Albany, and to the Boston, Hartford & Erie Railroad to Boston. The railway would see several name changes and reorganizations before construction commenced. [2]

The New York, Boston & Northern Railway (NYB&N) was formed on November 18, 1872, as a consolidation of the NY&B with two companies to the north — the Putnam & Dutchess Railroad (P&D) and Dutchess & Columbia Railroad (D&C). The P&D was a plan for a line to split from the New York and Boston at Carmel to a point midway along the D&C. The D&C opened in 1871, running from the Hudson River to the Connecticut border. The Clove Branch Railroad was to serve as a short connection between the two parts of the planned line.

The New York, Boston & Montreal Railway was organized on January 21, 1873, as a renaming of the NYB&N. It continued north to Chatham on what is now the defunct section of the Harlem Line and then used the Harlem Extension Railroad into Vermont. The Panic of 1873 caused the cancellation of the leases and mergers on December 1 of that year. Construction on the P&D and D&C stopped; D&C later became part of the Central New England Railway, the Harlem Extension became a part of the Rutland Railroad, and the Clove Branch Railroad was abandoned in 1898.

The New York, Westchester & Putnam Railway was formed on July 3, 1877, as a reorganization, and was leased to the New York City & Northern Railroad (NYC&N), formed on March 1, 1878. Between East View and Pocantico Hills, the NYC&N built a segment leading to a perilous 80-foot-high trestle over a marsh-filled valley. Because of the dangers of crossing the bridge, which often required that trains slow down to a crawl, the line was rerouted west around that valley in 1881. The bridge was torn down in 1883, and the valley became the Tarrytown Reservoir.[3] The line finally opened under the original plan, ending at Brewster, in April 1881. That year, the New York & New England Railroad opened to the north, using some of the grade built for the P&D and D&C. The West Side & Yonkers Railway was leased to the NYC&N on May 1, 1880, extending the line south across the Harlem River to the northern terminal of the Ninth Avenue Elevated at 155th Street. It was merged into the NYC&N by 1887. In the 1910s, the Interborough Rapid Transit Company (IRT) of the New York City Subway purchased the bridge across the Harlem River to move its elevated lines north into the Bronx, cutting the NYP back to Sedgwick Avenue. The Yonkers Rapid Transit Railway was opened in 1888 as a branch from the NYP at Van Cortlandt northwest to Yonkers. It was merged into NYP by 1887.

Reorganization and decline

The company went into receivership by 1887 and was reorganized as the New York & Northern Railway. By 1894 it was reorganized as the New York & Putnam Rail Road Company (NY&P) by J. P. Morgan, who in turn leased the railroad to the New York Central & Hudson River Railroad (NYC&HR). The line eventually became the Putnam Division of the New York Central Railroad (NYC) by 1913. The line lacked a direct connection to NYC's flagship station, Grand Central Terminal (GCT), which hurt ridership throughout its existence. Workweek commuters and weekend tourists were forced to transfer at Highbridge to reach GCT.[4] The Sedgwick Avenue-Van Cortlandt section and the Yonkers Branch were electrified in 1926.

Several short branches were eliminated after the 1920s. The Mohansic Branch near Yorktown Heights, originally built to serve a mental institution that was canceled by Albany, went first. In 1929, John D. Rockefeller Jr. had the tracks removed from his Pocantico Hills property, eliminating four stations while creating one. The nearby village of East View was obliterated to build the new line. The Getty Square Branch was abandoned on June 30, 1943.[5] Despite a legal battle by Yonkers residents which reached the United States Supreme Court to save it, the line was scrapped in December 1944.[6] [7]

Besides the regular Sedgwick Avenue–Brewster service, service also operated from Golden's Bridge on the Harlem Division via a connecting branch to Lake Mahopac, and then over the Putnam Division to Brewster, where it returned to the Harlem Division. Trains taking this route were said to go "around the horn".

End of service

NYC saw the Putnam Division as a dispensable stepchild. The line lacked a second track, electrification, commuter parking and direct service to GCT, all of which the parallel Harlem and Hudson Divisions had, resulting in declining patronage. In 1956, the New York Central asked for permission to discontinue service on the line. On May 14, 1957, the Public Service Commission allowed a 15 percent increase in fares, but required that service be run on the Putnam Division on a limited basis. On March 12, 1958, the Public Service Commission authorized the NYC to end passenger service on the Putnam on June 1, 1958. At the time, the line had less than 500 daily riders, and discontinuing the line was expected to save $400,000 annually. The last trains ran on May 29, 1958, as there was no weekend service on the line.[8] Service "around the horn" via the Harlem Division's Lake Mahopac Branch continued until April 2, 1959. Until 1962, when NYC's West Shore Railroad was upgraded, the Putnam served oversize freight trains, due to the lack of tunnels on the line. Tracks between East View and Lake Mahopac were removed in 1962.

NYC merged with long-time rival Pennsylvania Railroad to form Penn Central (PC) in 1968. Freight service on the northern part of the Putnam ended in March 1970. The southern end of the line remained in service until the closing of the A&P warehouse in Elmsford, in 1975. The decrease in traffic from Stauffer Chemical cut back the line to Chauncey by 1977. Conrail took over the bankrupt PC in April 1976, but had no plans for increasing business. The last customer was the Stella D'Oro bakery in the Bronx, which stopped using the railroad in 1989, after which Conrail wanted to sell the right-of-way to the city and Westchester to reduce its tax bill.

In 1991, the Regional Plan Association proposed extending the line and connecting it with the IRT Broadway–Seventh Avenue Line of the New York City Subway.

Legacy

The Metro-North Railroad uses the remaining stub near Marble Hill station to store maintenance-of-way and contractors' trains, and for material delivery in the vicinity of West 225th Street. The roadbed north of the former Van Cortlandt station has been converted into the Putnam Greenway, South County Trailway, North County Trailway, and Putnam County Trailway rail trails.

Remaining stations

A replica of the former Bryn Mawr Park station at the former Palmer Road grade crossing is in use as a grocery. The station in Briarcliff Manor was purchased by the village in 1959 and converted into the Briarcliff Manor Public Library.[9] The station in Millwood remained until 2012, but it was torn down in May 2012 due to structural instability. The station in Elmsford serves as a restaurant. The Yorktown Heights station had its exterior restored and is the centerpiece of the town park. The station in Lake Mahopac has been an American Legion Hall since 1965.[10] The freight house in Baldwin Place and the station in Tilly Foster remain but are on private property. Skeletal remnants of the Van Cortlandt station remain in Van Cortlandt Park.

Getty Square Branch

The Getty Square Branch still shows evidence of its existence, with vestiges of the railroad and stations, and neighborhoods exhibiting characteristics of transit-oriented development.[11] Getty Square station, originally a head house and train shed, was replaced by an office building, which still stands and is ornamented on its exterior and in its lobby with images of locomotives. The 3.4mile-long right-of-way is part of the trail system in Van Cortlandt Park, including the bridge that carried the branch over the Henry Hudson Parkway. Old railroad ties can be found along the right-of-way. The right-of-way within New York City ends at a parking garage for an apartment building in Yonkers. To the north of the apartment building, another parking lot was built. The bridge over the adjacent street was walled-in where the ROW used to pass underneath.[12]

Abutments of the former branch can be found at School Street across from Herriott Street, McLean Avenue near South Broadway, and the former Lowerre Station on Lawrence Street at Western Avenue. The former Caryl Station on Caryl Avenue between Saratoga and Van Cortlandt Park Avenues, with the tunnel into Van Cortlandt Park walled-off by cinder blocks, is now the Caryl parking lot and playground.[13] A lot of the intrusions on the branch were from the expansion of outside storage from adjacent industries, which broke up the right-of-way in many places, especially in Yonkers.

Private homes that once served the branch include the termini houses of the Park Hill station's adjacent funicular, on Undercliff at Park Hill Terrace,[14] and on Alta Avenue[15] north of Overcliff, and the home of the railroad's president, also on Alta Avenue. North from the Yonkers-New York City boundary, the path of the route generally follows the path of the Saw Mill River Parkway until it reaches East Irvington.

Station listing

Main Line

NOTE: Stations along pre-1918 Manhattan terminus and pre-1931 Tarrytown Heights alignment are shaded in darker gray.

LocalityMilepostStationLat/longNotes/Connections
Manhattan155th Street TerminalOriginal terminal from 1881 to 1918.
Putnam Bridge across the Harlem River; taken over by IRT Ninth Avenue Line in 1918
The Bronx0.0Sedgwick Avenue40.8314°N -73.9323°WNYC Transit

Connected to former IRT Ninth Avenue Line station and West Side/High Line

Highbridge40.8382°N -73.9314°WNow the Highbridge Maintenance Facility.
Morris Heights40.854°N -73.9199°W
University Heights40.8614°N -73.9147°W
Fordham HeightsMerged with University Heights Station in early 20th Century
Hudson & Putnam Lines split
Kings BridgeSomewhere between 225th Street and 231st Street; Not to be confused with
the Spuyten Duyvil and Port Morris Railroad station of the same name.
4.82Van Cortlandt40.8891°N -73.8936°WInside Van Cortlandt Park
Junction with electrified Getty Square Branch
Westchester6.52Lincolnat McLean Avenue
8.09DunwoodieAt Yonkers Avenue east of Dunwoodie Golf Course
9.44Bryn Mawr Park40.9448°N -73.858°WReplaced in 1995 by Palmer/Bryn Mawr Market
10.50Nepperham
11.92Gray Oaks
12.01Nepera Park
13.02Mount Hope
13.86Chauncey
14.72ArdsleyOff NY 9A between Saw Mill River Parkway and New York State Thruway.
WoodlandsSmall wooden platform and opened shelter with canopy along Woodlands Lake.[16]
16.60WorthingtonCurrent day bike path does not pass the station location. Station looked similar to Crafts station.
18.14ElmsfordCurrently a restaurant
Beaver HillWooden shelter designed as a flag stop for former Fairview Golf Club
Original alignment from short-lived 80-foot high Eastview Trestle segment began here (1880-1881).
20.41EastviewOriginal pre-1929 relocation line began here.
Tarrytown HeightsBuilt March 1882; First station along Tarrytown Heights alignment
west of East View station and original NY&P alignment
Tower HillBuilt November 26, 1881; Second station on former alignment west
of Tarrytown Reservoir existed here until 1931
Pocantico HillsBuilt November 26, 1881; Third station along former alignment near
Rockefeller Estate and Tarrytown Reservoir existed here until 1931
Original alignment from short-lived 80-foot high Eastview Trestle segment ended here (1880-1881).
WhitsonsFourth station along previous alignment. Replaced in 1931 by Graham station on new alignment
23.92GrahamCreated by 1931 relocation, Original pre-1929 alignment ended just north of here.
Open shelter that was proposed for major expansion which never occurred.
27.04Briarcliff ManorCurrently the Briarcliff Manor Public Library.
30.44Millwood41.1901°N -73.7969°W
32.52Kitchawan
33.57Croton Lake
35.04Croton Heights
36.76Yorktown HeightsAt Railroad Park on the National Register of Historic Places. Originally contained
a coach yard and an engine service facility.
Connection to Mohansic Branch
37.94Amawalk41.2864°N -73.7703°WAmawalk's station agent was eliminated on February 8, 1935.[17]
39.96Granite Springs
Putnam42.25Baldwin Place41.3454°N -73.7545°W
Connection to Mahopac Mines Branch
44.38Lake Mahopac41.3714°N -73.7346°WCurrently an American Legion Hall
Connection to Lake Mahopac Branch and NYC's Harlem Division
45.13Mahopac41.3787°N -73.7241°W
47.20Crafts
49.58CarmelSouthern terminus of unbuilt Putnam & Dutchess Railroad.
51.84Tilly FosterOriginally built for the Tilly Foster Mine, which closed in 1897. Station continued to operate.
53.82Putnam JunctionNot a station, connection with Harlem Division and Brewster Yard; included bridge to
Beacon Line (a.k.a. CNE Highland Division) until 1907.[18]
Brewster
Line continues along NYC's Harlem Division

Branches

Getty Square Branch

LocalityMilepostStationLat/longNotes/Connections
The Bronx0.0Van Cortlandt40.8912°N -73.8921°WBeginning of Getty Square Branch
Putnam & Getty Square Branches split
MosholuAbandoned 1926
YonkersCarylNorth of Caryl Avenue Bridge, which still exists today.
LowerreSouth of Lawrence Street between Western and Van Cortlandt Park Avenues.
3.0Park HillConnected to former Park Hill Incline funicular railroad
3.2Getty Square
Line abandoned in 1943

Mohansic Branch

LocalityMilepostStationLat/longNotes/Connections
Westchester0.0Yorktown Heights
Putnam Line & Mohansic Branch split
Mohansic State HospitalN.A.Never built. Branch was abandoned when the hospital project was cancelled before station was constructed.
Line abandoned in 1917

Mahopac Mines Branch

LocalityMilepostStationLat/longNotes/Connections
Putnam0.0Baldwin Place41.3454°N -73.7545°W
Putnam & Mahopac Mines Lines split
Mahopac Falls41.3708°N -73.7621°W
4.0Mahopac Mines41.3974°N -73.7584°WSeldom used by customers. Also had a turn table and water tower.
Line abandoned in 1931

Lake Mahopac Branch

LocalityMilepostStationLat/longNotes/Connections
Putnam0.0Lake Mahopac41.3714°N -73.7346°WPutnam Division connection
0.40XCUnmanned junction where the Lake Mahopac Branch crossed the Putnam Division.
Westchester3.00Shenorock41.3361°N -73.7367°WFlag stop, 9/10 mile west of Lincolndale.
3.91Lincolndale41.3237°N -73.719°WStone station building.
7.22Golden's Bridge41.2945°N -73.6776°WHarlem Division connection
Line abandoned in 1959

See also

Further reading

External links

Notes and References

  1. News: P.S.C. Lets Central Close Putnam Line And Increase Fares; CENTRAL TO DROP ITS PUTNAM LINE. Knowles. Clayton. March 13, 1958. The New York Times. June 22, 2017. en-US. 0362-4331.
  2. Web site: nycshsblogger . 2008-10-15 . The Putnam Division . 2024-02-19 . NYCSHS . en.
  3. http://archivesleuth.wordpress.com/2011/09/21/the-eastview-trestle/ The Eastview Trestle (Archive Sleuth)
  4. Web site: Putnam County Trailway . 2024-02-19 . Putnam County, New York . en-gb.
  5. News: Getty Square Line Ends; 12 Riders on Last Trip . The New York Times . July 1, 1943 . 21 . July 4, 2011.
  6. News: High Court Lets Road Drop Getty Sq. Line . The New York Times . November 14, 1944 . July 4, 2011.
  7. News: Putnam Line Being Razed . The New York Times . December 9, 1944 . 30 . July 4, 2011.
  8. News: The Wheels of 'Old Put' Click Out a Sad Accompaniment to Riders' 'Auld Lang Syne' . Merrill . Folsom . . May 30, 1958 . 23 . July 4, 2011.
  9. http://www.briarcliffmanorlibrary.org/history.html Library History (Briarcliff Manor Public Library)
  10. http://putnamcountynylegion.tripod.com/id8.html The American Legion Mahopac Post 1080
  11. Klein, Daniel A. . 2004 . The Phantom Spur Retracing the Vanished Getty Square Branch of the Putnam Railroad . National Railway Bulletin . 69 . 2 . 28–37 .
  12. Book: An Assessment of the Transit Service Potential of Inactive Railroad Rights-of-way and Yards Final Report. October 1991. New York City Department of City Planning. 12–16.
  13. http://www.yonkersparkingauthority.com/fac_caryl.asp Caryl Lot (Yonkers Parking Authority)
  14. http://ny.existingstations.com/archive/905.jpg Park Hill Lower Station; 1999 Bill Kessler Photograph (Existing stations in Westchester County, New York)
  15. http://ny.existingstations.com/archive/842.jpg Park Hill Upper Station; 2000 Walter Hahn Photograph (Existing stations in Westchester County, New York)
  16. https://scenesfromthetrail.com/2020/04/29/great-hunger-memorial-park-at-v-e-macy/ Great Hunger Memorial Park at V.E. Macy (Scenes From the Trail; Includes the history of Woodlands NY&P station)
  17. News: Amawalk Railroad Station Closed . October 16, 2018 . The Putnam County Courier . February 8, 1935 . . 1.
  18. Book: The Coming of the New York and Harlem Railroad . Self-Published . Grogan, Louis V. . 1989 . 154 . 0-962120-65-0.