New Sarawak State Legislative Assembly Building Explained

Mapframe-Zoom:16
New Sarawak State Legislative Assembly Building
Native Name:Bangunan Dewan Undangan Negeri Sarawak Baru
Location:Kuching, Sarawak, Malaysia
Coordinates:1.5617°N 110.3478°W
Start Date:September 2004[1]
Completion Date:31 May 2009
Opening:27 July 2009
Building Type:State Legislative Assembly
Elevator Count:Unknown
Architecture Firm:Hijjas Kasturi AssociatesAki Media
Roof:114m (374feet)
Tip:115m (377feet)
Floor Count:9
Cost:RM 296.5 million
Developer:Bina Puri Holdings Bhd
PPES Works (Sarawak) Sdn Bhd
Naim Cendera Sdn Bhd
Owner:Sarawak State Government

The New Sarawak State Legislative Assembly Building (Malay: '''Bangunan Dewan Undangan Negeri Sarawak Baru''') is the current state legislative complex of Sarawak, in Kuching, Malaysia. It houses the Sarawak State Legislative Assembly, where state assemblymen from all over Sarawak meet and preside over debates and passing of laws.

The complex is at the north bank of the Sarawak River in between The Astana, which is the official residence of the Yang di-Pertua Negeri (Governor) of Sarawak, and Fort Margherita.

The building was officially opened by the Yang di-Pertuan Agong (King) of Malaysia, Tuanku Mizan Zainal Abidin of Terengganu, on 27 July 2009, followed by the Rulers' Conference in the building complex.[2]

History

The groundbreaking ceremony of the building was held in September 2004. The main project developers were Naim Cendera and PPES Works. The building was handed over to the Sarawak government in May 2009.[3] The building cost RM 296.5 million to build.

The opening ceremony of the building was held in July 2009 with a river float parade, fireworks, and the purchase of luxury cars which will be used by respective state government departments.[4] The ceremony was attended by the King of Malaysia and broadcast live nationwide.[5]

The Sarawak government added the Darul Hana bridge across the Sarawak river near the building in 2017.[6] In 2018, the Darul Hana musical fountain was added in front of the state assembly building.[7] A 99-metre-tall flagpole was also added to the site in 2023 to commemorate the 60th year anniversary of Sarawak's position as a founding partner in the formation of Malaysia.[8]

Architecture

The building has nine floors with a height of 114 metres, diameter of 30.9 metres, and an area of 760 square metres. The speaker of the state assembly, Dato Sri Mohd Asfia Awang Nassar, said that the building would last for 100 years.[9] The cross-section of the building is designed like a nine-pointed star. The building is capped with a roof design similar to a Malaysian royal umbrella (payung negara in Malay).[3]

The public viewing gallery is located on the ninth floor.[3] The Sarawak state legislative assembly is located on the eighth floor.[9] The state assembly members lounge is located on the 7th floor.[3] Meanwhile, the lower floors house offices for the state assembly members, function halls, meeting rooms, an auditorium, and a surau.[3] The state legislative assembly chamber can hold up to 108 members, each with their own office. It also has 142 seats for civil servants, a ceremonial hall accommodating 300 people, banquet hall with a capacity of 1,000 people, a car park for 315 vehicles, and a parade ground.[10]

See also

Notes and References

  1. http://www.cmsb.com.my/index.php?option=com_content&view=article&id=110:new-sarawak-state-legistative-assemblydun-building-officially-opened&catid=65:2009&Itemid=114 New Sarawak State Legistative Assembly(DUN) Building Officially Opened
  2. http://www.bernama.com/bernama/v5/newsgeneral.php?id=428223 King Opens New Sarawak Legislative Assembly Building
  3. Web site: New Sarawak State Legistative Assembly (DUN) Building Officially Opened . Cahaya Mata Sarawak Berhad . 11 October 2019 . https://web.archive.org/web/20190227120831/http://www.cmsb.com.my/new-sarawak-state-legistative-assembly-dun-building-officially-opened/ . 27 February 2019.
  4. Web site: CMSadmin. Cahya Mata Sarawak New Sarawak State Legistative Assembly (DUN) Building Officially Opened. 2020-08-20. en-US.
  5. News: Sharon . Ling . Opening 'do' cost RM1mil . 12 October 2019 . The Star. Malaysia . https://web.archive.org/web/20110608165119/http://www.thestar.com.my/news/story.asp?file=/2009/11/14/nation/5108404&sec=nation . 8 June 2011.
  6. News: Mohd . Roji Kawi . Opening of RM35m Darul Hana Bridge over Sungai Sarawak . 12 October 2019 . New Straits Times. 14 November 2017 . https://web.archive.org/web/20171114050306/https://www.nst.com.my/news/nation/2017/11/302942/opening-rm35m-darul-hana-bridge-over-sungai-sarawak . 14 November 2017.
  7. News: Jacqueline . David . Darul Hana Musical Fountain city's latest tourist draw . 12 October 2019 . The Borneo Post. 15 October 2018 . https://web.archive.org/web/20190509053831/https://www.theborneopost.com/2018/10/15/darul-hana-musical-fountain-citys-latest-tourist-draw/ . 9 May 2019.
  8. News: Massive Sarawak flag flutters from much-talked about flagpole, signals likely completion . 2 August 2023 . Malay Mail. 17 June 2023 . https://web.archive.org/web/20230622033801/https://www.malaymail.com/amp/news/malaysia/2023/06/17/massive-sarawak-flag-flutters-from-much-talked-about-flagpole-signals-likely-completion/74928 . 22 June 2023.
  9. News: A building to serve 100 years, says Asfia . 11 October 2019 . The Borneo Post. 23 June 2009 . https://web.archive.org/web/20180124131555/http://www.naim.com.my/press-releases/a-building-to-serve-100-years-says-asfia/ . 24 January 2018.
  10. News: Puvaneswary . Devindran . New DUN complex built for the future . 13 October 2019 . The Borneo Post. 6 November 2009 . Alt URL