Hartford Line (Amtrak) Explained

Amtrak Hartford Line[1]
Type:Inter-city rail
Status:Operating
Locale:Connecticut and Massachusetts
Operator:Amtrak in partnership with CTDOT and MassDOT
Start:, Massachusetts
Stops:9
End:, Connecticut
Distance:62miles
Journeytime:1 hour, 20-25 minutes[2]
Frequency:14 weekday trips
8 Saturday trips
11 Sunday trips
Trainnumber:405, 409, 416, 417, 450, 460, 463-465, 467, 470, 471, 473-475, 478, 490, 495, 497
Stock:GE Genesis locomotives, Amfleet coach cars, and Ex-Metroliner cab cars
Speed:[3]
Owners:Amtrak

The Hartford Line is a train service run by Amtrak primarily between Springfield, Massachusetts, and New Haven, Connecticut, along Amtrak's New Haven–Springfield Line.

Service on the line takes the form of shuttle trains, Valley Flyer trains, or Northeast Regional through trains. The shuttle trains meet Acela and Northeast Regional services at New Haven Union Station where passengers can typically make a cross-platform transfer between trains. Valley Flyer trains also offer the same connecting service at New Haven, but continue past Springfield north to Greenfield, Massachusetts. Two Northeast Regional round trips operate daily between Washington, D.C. and Springfield, with at least one southbound trip continuing into Virginia.

Prior to the addition of the Valley Flyer and the Northeast Regional thru trains, the service was known as the New Haven–Springfield Shuttle, or simply, the Shuttle. The line was renamed in September 2019. Today the service is a component of and shares its name with the Hartford Line commuter rail service operated by the Connecticut Department of Transportation.

During fiscal year (FY) 2023, the service carried 442,028 riders, an increase of 36.3% from FY 2022.[4] The increase in ridership was primarily due to recovery from the impact of the COVID-19 pandemic on tourism.

The service is financially supported by the Connecticut Department of Transportation and Massachusetts Department of Transportation.

History

As inherited from Penn Central in 1971, most service on the Springfield Line consisted of unnamed Budd Rail Diesel Car shuttles that connected with Northeast Corridor trains at New Haven, with limited through service to New York City.[5] In 1980, Connecticut invested $12 million to improve service on the line.[6] North Haven station was opened on October 25, 1980, and other stations were renovated.[7] A new fleet of 12 Budd SPV-2000 diesel railcars allowed an increase to 12 daily round trips under the Connecticut Valley Service name (plus two through trips) at that time.[8] However, service was cut in half in 1981 after ridership failed to increase.

On January 12, 1986, Amtrak pulled the unreliable SPVs from the line and replaced them with Amfleet coaches pulled by diesel locomotives. North Haven and Enfield stations were closed on October 25, 1986 due to low ridership.[7] As New Haven was the northern limit of electrification on the Northeast Corridor, New York–Boston trains changed between electric and diesel locomotives at the station. The passenger coaches of Springfield shuttle trains were attached to southbound trains during the engine change, and detached from northbound trains; this eliminated the need for passengers to change trains. The Connecticut Valley Service name was soon dropped, and shuttle trains were named in timetables as sections of their connecting trains.[9] The elimination of the second track on the line beginning in 1990 sharply reduced capacity, limiting frequencies to four daily shuttle round trips plus several through trips.[10] [11]

On October 28, 1995, most Northeast Corridor service including the shuttle trains were consolidated under the NortheastDirect brand. Electrification was extended to Boston in 2000, and engine changes were eliminated over the next two years. The cumbersome split/merge procedure was abandoned in favor of dedicated shuttle trains with cross-platform connections to through trains. The shuttle trains began to use Former Metroliner cab cars, which had become available when replaced by new equipment on West Coast routes. This allowed them to operate in push–pull format, eliminating the need to wye or loop the trainsets at New Haven and Springfield. The NortheastDirect name was dropped in September 2001; Northeast Corridor trains became the Acela Regional (later Regional then Northeast Regional), while the shuttle trains became unnamed. They remained unnamed until 2019 when they received the Hartford Line and Valley Flyer names.

Mail service

Until Amtrak discontinued all mail-hauling operations in 2005, the postal distribution center in Springfield, MA was a significant customer. Up until about the year 2000, Springfield was served by a dedicated mail train which would run overnight up the Inland Route to Springfield. After this train was canceled, mail cars were instead added to the early morning Train 190, to make pickups at large cities along the Northeast Corridor. At New Haven these mail cars would be removed from the rear of Train 190 and added to Shuttle Train 490, sometimes sandwiching the locomotive in the middle of the train.

Hartford Line expansion

Until August 2015, daily service in each direction on the Springfield Line consisted of four Shuttles, the Vermonter, and one or two Northeast Regional trains.[12] Between August 3, 2015 and December 31, 2017, several round trips on weekdays were replaced by buses to accommodate double track construction for the ConnDOT Hartford Line commuter rail service.[13] On June 9, 2018, three additional weekday Shuttle round trips were added as part of the startup of Hartford Line service. This change also added connections with some Amtrak Acela Express service in New Haven.[14]

Hartford Line began on June 16, 2018.[15] Initial Hartford Line service consisted of eight weekday round trips (four New Haven–Hartford and four New Haven–Springfield) and nine weekend round trips (six New Haven–Hartford and three New Haven–Springfield).[16] On September 10, 2018, as part of a schedule change made to Hartford Line trains, all Amtrak Shuttles and Northeast Regionals started stopping at New Haven's State Street station.[17] (The Vermonter makes only limited stops between New Haven and Springfield.)Amtrak adopted the Hartford Line name for use on the trains it operates on the corridor and retired the Shuttle designation in September 2019.[18] Service was reduced in 2020 during the COVID-19 pandemic; service levels were restored to pre-COVID frequency on April 25, 2022.[19] Most service will be replaced by buses from July 18 to September 9, 2022, during canopy roof replacement at Hartford Union Station and slope stabilization work in Windsor.[20]

Valley Flyer pilot program

On June 12, 2018, Massachusetts Governor Charlie Baker announced that two daily round trips would be extended to in 2019 as a pilot program.[21] By February 2019, the two-year pilot was expected to begin in June 2019; however, by that May it was delayed to later in the year.[22] [23] On August 30, 2019, the Valley Flyer program began. Two round trips are offered on weekdays and one on weekends with southbound trains in the morning and northbound in the evening which complement Amtrak's existing daily service on the Vermonter. Additionally a reverse round trip operates between Springfield and Greenfield on weekends only.[24]

Operation

The local Hartford Line trains are numbered in the 400 series, usually denoting by the last two digits which Northeast Regional train the Hartford Line train is connecting with. Trains terminating in Springfield carry the Hartford Line name, while trains terminating in Greenfield carry the Valley Flyer designation.[18] Typical consists run in push-pull configuration with a General Electric P42DC locomotive pulling an Amfleet coach and a 9600-series ex-Metroliner cab car. Normally the ex-Budd Metroliner leads northbound trains, while the GE Genesis usually leads most southbound trains. Crew bases are at Springfield and New Haven, with diesel locomotive servicing taking place at New Haven.

The Valley Flyer trains account for two weekday round trips and one weekend round trip. Southbound Valley Flyer trains require an equipment move from the crew base and equipment layover yard at Springfield Union Station to the Olver Transit Center in Greenfield prior to the Greenfield departure as Amtrak does not have any crew or turnaround facilities in the area. Likewise, equipment and crews on northbound trips must dead head back to Springfield after unloading all Greenfield passengers. For the weekend Valley Flyer, tickets are available for these moves (trains 400 and 499.) On weekdays, these trips are dead head moves and are not open to passengers. Another unique operational aspect of the Valley Flyer is the need for the push pull trains to reverse directions twice at Springfield during the trip due to the station’s location just to the east of the intersection between the Amtrak Springfield Line, MassDOT Connecticut River Line, and CSX Berkshire Subdivision.

The New Haven–Springfield corridor is served by all Northeast Regional trains in the 140 series (except trains 145 and 149), as well as trains 125, 136, and 157. These trains run from Springfield to or Virginia without the need to change trains. The corridor is also served by Amtrak's Vermonter.

Fares

The Hartford Line and Valley Flyer service operates as a component of CTDOT's Hartford Line commuter rail program along with CTDOT's own CTrail trains and reduced fixed commuter level fares are offered for local travel on the service between all stations inclusive of and between New Haven Union Station and Springfield Union Station on both the 400 series trains and the Northeast Regional through trains which travel beyond New Haven. CTDOT issued rail passes and CTrail tickets are also accepted on these trains. Intercity rail trips that include travel beyond New Haven are subject to normal Amtrak fares as well as travel along the Valley Flyer extension to Greenfield, MA. Amtrak's Vermonter trains which also travel along the corridor are excluded from the commuter level fares.[25]

Stations

StateMilepost (km)[26] LocationStation[27] Connections[28] [29]
MA0 mi (0 km)SpringfieldSpringfield Union Station Amtrak:,,,
CTrail: Hartford Line
PVTA Bus: B4, B6, B7, B12, B17, G1, G2, G3, G73E, P20, P21, P21E, R10, R14, X92
Intercity bus: Greyhound Lines, Peter Pan Bus Lines
CT14.6milesWindsor Locks Amtrak: Northeast Regional, Vermonter, Valley Flyer
CTrail: Hartford Line
CTtransit Bus: 24, 96, 905
19.1milesWindsor Amtrak: Northeast Regional, Valley Flyer
CTrail: Hartford Line
CTtransit Bus: 24, 32, 34, 36
25.3milesHartfordHartford Union Station Amtrak: Northeast Regional, Vermonter, Valley Flyer
CTrail: Hartford Line
CTfastrak: 101 Hartford/New Britain, 102 Hartford/New Britain/Bristol, 128 Hartford/Westfarms-New Britain
CTtransit Bus: 30, 45X, 62, 64, 66, 72, 74, 82, 83, 84, 901, 902, 903, 904, 905, SC, DASH, PPB
35.9milesBerlin Amtrak: Northeast Regional, Valley Flyer
CTrail: Hartford Line
CTtransit Bus: 512 Berlin Turnpike
43.3milesMeridenMeriden Transit Center Amtrak: Northeast Regional, Vermonter, Valley Flyer
CTrail: Hartford Line
CTtransit Bus: 215, 561, 563, 564, 565, 950
49milesWallingford Amtrak: Northeast Regional, Valley Flyer
CTrail: Hartford Line
CTtransit Bus: 215 New Haven/Wallingford/Meriden, 292 North Colony Road
61.4milesNew HavenNew Haven State Street Amtrak: Northeast Regional, Valley Flyer
CTrail: Hartford Line, Shore Line East
Metro-North Railroad: New Haven Line
CTtransit Bus: 204, 206, 212, 223, 274, 278, 950
62milesNew Haven Union Station Amtrak:, Northeast Regional, Vermonter, Valley Flyer
CTrail: Hartford Line, Shore Line East
Metro-North Railroad: New Haven Line
CTtransit Bus: 212, 265, 271, 272, 274, 278, 950, USS

External links

Notes and References

  1. Web site: Northeast Regional Train . Amtrak . Amtrak . September 26, 2019.
  2. Web site: Amtrak Timetable Results . www.amtrak.com . December 20, 2021.
  3. AMTRAK RUNS TEST TRAINS OF UP TO 110 MPH IN PREPARATION FOR THE LAUNCH OF THE HARTFORD LINE ON JUNE 16 . June 6, 2018 . June 9, 2018 . Connecticut Department of Transportation.
  4. Web site: 2023-11-30 . Amtrak FY23 Ridership . live . https://web.archive.org/web/20231201135517/https://media.amtrak.com/wp-content/uploads/2023/11/Copy-of-FY23-Year-End-Ridership.pdf . 2023-12-01 . 2023-12-04 . Amtrak.
  5. Web site: Nationwide Schedules of Intercity Passenger Service . May 1, 1971 . National Railroad Passenger Corporation . The Museum of Railway Timetables . 9.
  6. News: SENATOR BAKER APPEARS IN HARTFORD FOR WEICKER AND STATE REPUBLICANS . Richard L. . Madden . New York Times . October 20, 1982.
  7. Web site: Stations: NI-NO . Tyler City Station . Belletzkie . Bob.
  8. Web site: Connecticut Valley Schedule . Amtrak . October 28, 1980.
  9. Book: Amtrak National Train Timetables . 13 . April 27, 1986 . Amtrak . Museum of Railway Timetables.
  10. Book: NEW HAVEN-HARTFORD-SPRINGFIELD LINE HIGH SPEED INTERCITY PASSENGER RAIL PROJECT: ENVIRONMENTAL ASSESSMENT/ENVIRONMENTAL IMPACT EVALUATION . May 2012 . Federal Railroad Administration . Section 1: Introduction . 1.
  11. Book: Karr, Ronald Dale . The Rail Lines of Southern New England . 2 . Branch Line Press . 2017 . 9780942147124 . 86.
  12. Web site: NRPC Form W4–200M–1/12/15: Northeast Corridor Boston / Springfield and Washington, D.C. . National Railroad Passenger Corporation . https://web.archive.org/web/20150803145451/http://www.amtrak.com/ccurl/141/170/Northeast-Corridor-2-Schedule-011215,0.pdf . August 3, 2015.
  13. Amtrak Begins Substitute Bus Operation to Facilitate Construction on Hartford Line . July 31, 2015 . Connecticut Department of Transportation . August 3, 2015.
  14. News: Connecticut DOT gears up for Hartford Line testing. June 6, 2018 . June 6, 2018.
  15. Web site: Thousands Take A Free Ride On Hartford Line's Inaugural Run . Porter . Mikaela . Owens . David . Hartford Courant . June 17, 2018 . June 17, 2018.
  16. Web site: CTrail Hartford Line Schedules: Effective April 14, 2019 . April 14, 2019 . May 20, 2019 . Hartford Line.
  17. CTDOT Announces Hartford Line Service Changes for Weekend of September 7-10, 2018 and a New Schedule Effective September 10, to Accommodate Track Work . September 4, 2018 . Connecticut Department of Transportation . Effective September 10, 2018, a new Hartford Line train schedule will take effect through September 30th to accommodate continuing track work. Along with this new schedule, all Hartford Line trains will now stop at New Haven State Street Station. . September 10, 2018.
  18. Web site: Northeast Corridor Boston/Springfield-Washington Timetable . Amtrak . September 23, 2019.
  19. Amtrak, CTDOT and MassDOT to Restore Weekday Amtrak Hartford Line Service . April 25, 2022 . Massachusetts Department of Transportation . April 25, 2022 . April 26, 2022 . https://web.archive.org/web/20220426200358/https://blog.mass.gov/transportation/uncategorized/amtrak-ctdot-and-massdot-to-restore-weekday-amtrak-hartford-line-service/ . dead .
  20. Safety and Track Improvement Projects on the Hartford Line Result in Two Month Service Changes . June 24, 2022 . Connecticut Department of Transportation.
  21. News: Commuter Trains To Run North Of Springfield Starting In 2019 . WAMC . June 12, 2018 . Paul . Tuthill . June 12, 2018 . June 13, 2018 . https://web.archive.org/web/20180613015439/http://wamc.org/post/commuter-trains-run-north-springfield-starting-2019 . dead .
  22. News: Springfield-Holyoke-Northampton-Greenfield passenger trains a go for summer . Mass Live . February 1, 2019 . Jim . Kinney.
  23. News: Greenfield to see extended passenger rail service by end of summer . Greenfield Recorder . May 2, 2019 . Anita . Fritz.
  24. AMTRAK AND MASSDOT ANNOUNCE START OF NEW VALLEY FLYER TRAIN SERVICE IN WESTERN AND NORTHERN MASSACHUSETTS . Amtrak . August 27, 2019.
  25. Web site: Hartford Line Fare Schedule.
  26. Web site: Executive Summary . Connecticut Department of Transportation . June 4, 2018 . 4.
  27. Web site: Stations . Hartford Line . February 25, 2019.
  28. Web site: Metro-North New Haven Line Timetable . Metro-North Railroad . January 22, 2019 . February 25, 2019.
  29. Web site: Shore Line East Rail Service Information . Shore Line East . January 22, 2019 . February 25, 2019 . December 9, 2018 . https://web.archive.org/web/20181209123822/https://shorelineeast.com/images/docs/SLE-Timetable.pdf . dead .