Hartford Line Explained

Hartford Line
Type:Commuter rail
Status:Operating
Locale:Connecticut and Massachusetts
First:June 16, 2018
Operator:CTrail (TransitAmerica Services/ Alternate Concepts Inc.)
Ridership:2,000 (weekday average)[1]
Start:New Haven Union Station
Stops:9 (initial service)
13 (future)
End:Springfield Union Station
Journeytime:81 minutes
Frequency:17 weekday round trips
12–13 weekend round trips
Line Used:New Haven–Springfield Line
Speed: (CTrail)
(Amtrak)[2]
Owners:Amtrak

The Hartford Line[3] is a commuter rail service between New Haven, Connecticut, and Springfield, Massachusetts, using the Amtrak-owned New Haven–Springfield Line. The project is a joint venture between the states of Connecticut and Massachusetts, with support from the federal government as well. CT Rail-branded trains provide service along the corridor, and riders can use Hartford Line tickets to travel on board most Amtrak trains along the corridor at the same prices. The service launched on June 16, 2018.[4] [5] [6]

Operation

Fares and service

The Connecticut Department of Transportation (ConnDOT) provides commuter train service on the line under its new CTrail branding; these trains are currently operated by TransitAmerica Services and Alternate Concepts Inc., operating as a joint venture, under a 5-year, $45 million contract. Amtrak also operates intercity rail trains on this corridor; Amtrak fares along the corridor are equal to their CTrail equivalents, and passengers can use CTrail tickets to ride Amtrak’s Hartford Line trains.[7] [8] (The only Amtrak train on the corridor that does not participate is the once-daily).[9]

Tickets from New Haven to Hartford are $8 and from New Haven to Springfield $12.75, both roughly half as much as what Amtrak's fares were before Hartford Line service began in June 2018. Discounts for bulk purchases of tickets and commuter passes are also offered.[10] CTrail tickets can be purchased at ticket vending machines (TVMs) at all stations. Alternatively for Amtrak operated trains, local tickets at the same price as CTrail can be purchased from Amtrak’s ticket windows at New Haven, Hartford, and Springfield or online. Passengers boarding an Amtrak Hartford Line train at Windsor must pre-purchase an Amtrak ticket before boarding over the phone or online on a smart phone or mobile device to avoid an onboard surcharge.[11] The ticket machine at Windsor Locks was installed by November 2018, with Windsor installed in 2019.[12]

Nine round-trips on weekdays are operated under the CTrail brand, with four New Haven–Hartford round-trips, and five New Haven–Springfield round-trips. Amtrak provides an additional eight New Haven-Springfield round-trips, two of which were added to the schedule upon launch of the Hartford Line in June 2018. Amtrak’s eight round-trips include all of their local 400 series Hartford Line trains and their Northeast Regional through trains that terminate in Springfield. This makes for a total of seventeen round-trips between New Haven and Hartford, thirteen of which operate the full line to Springfield. On weekends and holidays, CTrail operates two New Haven–Hartford round-trips and four New Haven–Springfield round-trips; along with Amtrak's pre-existing schedule, making for a total of twelve-thirteen round-trips offered on weekends and holidays.[13]

On September 14, 2020, Amtrak began requiring reserved tickets for Springfield-terminating Northeast Regional trains as part of a new policy requiring reservations for all Northeast Regional trips. Fares for these trips remained the same as other Hartford Line trains.[14]

Ridership

On June 18, 2018, Connecticut Governor Dannel Malloy announced that the line carried 21,850 riders over opening weekend, with 10,300 on Saturday, June 16, and 11,550 on Sunday.[15] On June 26, it was announced that 10,719 customers rode the line during the first full week of operation, June 18 to 24.[16] Average daily ridership has exceeded initial projections, with an estimated 2,400 daily passengers on weekdays and 1,200 on weekends. The line carried its millionth passenger during the Thanksgiving holiday in November 2019.

Connecting services

Connecting bus service is available to CT Transit regional buses at New Haven and Hartford stations and to Pioneer Valley Transit Authority buses at Springfield. Shuttle bus service is also available between Hartford station and Bradley International Airport. Although Windsor Locks station is geographically the closest Hartford Line station to the airport, Hartford station is the official connection point for rail-bus-airport transfers due to the limited facilities and low level platform at Windsor Locks.[17]

Rolling stock

In December 2017, Connecticut signed an agreement to lease 16 MBB coaches from the Massachusetts Bay Transportation Authority for three years, at a cost of $4.54 million, with options to extend the lease for up to three more years. The 16 cars were operated in four-car consists in a push-pull configuration with GP40-3H locomotives transferred over from Shore Line East. The railcars required significant repair and repainting before entering service, leading the Connecticut DOT to request $2.3 million from the state legislature in April 2018.

Mafersa coaches largely replaced the MBB coaches on the line in 2022, after M8 cars replaced the Mafersa coaches on Shore Line East.[18] The MBB coaches were completely withdrawn from service in early 2023. In August 2023, CTDOT approved a contract with Alstom for 60 single-level passenger cars, which will replace the Mafersa coaches in Hartford Line service (as well as Shoreliner cars on other lines) beginning in 2026.[19] [20]

Roster

BuilderModelPhotoActiveRoad numbersYear builtYear acquiredYear rebuiltNotes
Locomotives
GEP40DC126700-671119932005, 20152018-2024Ex-Amtrak.
EMDGP40-3H6[21] 6694-66991967, 197119962017-2019Two units are currently on lease to Metro-North Railroad.
Coaches
MafersaCoaches331701–1719 1730–1774 1991–19922004Ex-Virginia Railway Express.

Stations

All stations are ADA-compliant.

StateStationMilepost (km)Service beganConnections / notes
MASpringfield Union Station62milesJune 16, 2018[22] Amtrak: Hartford Line, Lake Shore Limited, Northeast Regional, Valley Flyer, Vermonter
Pioneer Valley Transit Authority, Greyhound Lines, Peter Pan Bus Lines
CT54.1miles2027 (planned)[23]
47.4milesJune 16, 2018Amtrak: Hartford Line, Northeast Regional, Valley Flyer, Vermonter
42.9milesJune 16, 2018Amtrak: Hartford Line, Northeast Regional, Valley Flyer
36.7milesJune 16, 2018Amtrak: Hartford Line, Northeast Regional, Valley Flyer, Vermonter
CTfastrak, CTtransit, Greyhound Lines, Peter Pan Bus Lines, FlixBus
33.4milesFuture station[24]
31.8milesFuture station
26.1milesJune 16, 2018Amtrak: Hartford Line, Northeast Regional, Valley Flyer
CTtransit
18.7milesJune 16, 2018Amtrak: Hartford Line, Northeast Regional, Valley Flyer, Vermonter
CTtransit, Middletown Area Transit
13milesJune 16, 2018Amtrak: Hartford Line, Northeast Regional, Valley Flyer
CTtransit
6.4miles2025 (planned)[25]
0.6milesJune 16, 2018Amtrak: Hartford Line, Northeast Regional, Valley Flyer
Metro-North Railroad: New Haven Line
CTrail: Shore Line East
CTtransit
New Haven Union Station0milesJune 16, 2018Amtrak

Acela, Hartford Line, Northeast Regional, Valley Flyer, Vermonter
Metro-North Railroad: New Haven Line
CTrail: Shore Line East
CTtransit, Greyhound Lines, Peter Pan Bus Lines, FlixBus

History

Background

During the mid-1980s, due to the high cost of operating the New Haven–Springfield Line and the competing newly-constructed expressways, Amtrak removed of track, turning the line from a double-track line to a line with a single track with passing sidings.[26] [27] Of the between New Haven and Springfield, of double track and of single track were left.[28]

In 1994, the Connecticut Department of Transportation (ConnDOT) conducted a feasibility study for a New Haven–Hartford service which envisaged three trips in the morning and three in the afternoon. It estimated that capital costs would be $4.4 million and that it would require an annual subsidy of $2.5 million. Ridership was projected at 1,000 per day. A revised and expanded proposal in 2001 contemplated service to Springfield and hourly service, with half-hourly service during peak periods. This would require $249 million in capital costs, both for rolling stock and to restore double tracking to the line. The service would require a yearly subsidy of $13 million but would carry 1,800–2,000 passengers daily.[29]

Various delays initially prevented the service. One source was a lack of widespread support in the New Haven region. Although reestablishing service was briefly mentioned in the South Central Regional Council of Government's January 2001 Long Range Mobility Plan,[30] it was not until 2003 that the commuter service provision began to be consistently listed among key transportation priorities in the annual Greater New Haven Chamber of Commerce Legislative Agenda.[31]

The New Haven–Hartford–Springfield Commuter Rail Implementation Study, released in 2005 by ConnDOT, recommended half-hour peak service, with new stations at North Haven/Hamden, Newington, and Enfield. No action was taken following the study, as proposed schedules did not link well with those of the New Haven Line and ridership projections were low (particularly for northbound morning and southbound evening trips).[32]

Plan

The plan called for the improvement of existing stations and the construction of new stations along the line. To facilitate frequent and bi-directional service, the line incorporates newly installed double track totaling [33] as well as of new passing sidings. Five new interlockings were built and new signal systems were installed, including the installation of Positive Train Control. Bridges and culverts on the line have been repaired, rehabilitated or replaced.

Funding

In January 2010, $40 million of stimulus funds were approved to double-track of the corridor under the American Recovery & Reinvestment Act.[34] [35] In July 2010, Governor Jodi Rell asked the Connecticut State Bond Commission to authorize borrowing $260 million in an effort to attract additional federal matching funds, to double-track the remainder of the corridor, construct freight sidings, and improve signaling. These upgrades, together with new rolling stock, should allow for two-way service during peak hours at speeds of up to .[36] On August 17, 2010, Connecticut lawmakers authorized borrowing the $260 million.[37]

On October 25, 2010, Governor Rell announced that Connecticut received an additional $120.9 million in funds from the federal government to fund the double tracking of the remainder of the line south of Hartford as well as station improvements in Wallingford, Meriden, Berlin and Hartford.[38]

As of April 2011, Connecticut State officials had applied for $227 million from the federal government that would complete track improvements between Hartford and Springfield, Massachusetts. ConnDOT applied for the money to the Federal Railroad Administration, part of $2.4 billion that Florida governor Rick Scott rejected because of the spending it would require from his budget.[39] In May 2011, Connecticut was awarded $30 million for track improvements in Hartford.

On August 15, 2012, the Federal Railroad Administration (FRA) granted a Finding of No Significant Impact (FONSI) on the line's environmental assessment, a major step towards the obligation of $121 million in federal funding for the line.[40]

In February 2017, the state approved an additional $50 million in bonded funds for the project. The money will support design of the rebuilt Windsor and Windsor Locks stations and of the new stations at, Newington, West Hartford, and . It will also complete funding for 4miles of double track being added north of Hartford, and pay for design and environmental permitting for an additional of double track between Hartford and Enfield.[41] [42] If further funding is found to build these additional miles, it would complete the double-tracking of the line except for downtown Hartford and the aging Warehouse Point railroad bridge.[43] The station in Newington was originally going to be located at Newington Junction, but due to local opposition, it will be located at Cedar St in Newington instead, within walking distance to the Cedar St CTfastrak stop.[44]

The state intends to seek FRA funds to pay for construction of the new and rebuilt stations, the replacement of the Warehouse Point bridge, and a layover yard near Springfield.[45]

The budgeted funds for the Connecticut portion to date total $769.1 million, of which $204 million has come from the Federal sources ($190.9 million from the FRA, $13.9 million from the Federal Transit Administration) and the balance from the state of Connecticut.[46]

Construction

In 2015, major construction commenced at the four stations in,,, and .[47] On August 3, 2015, Amtrak began busing its weekday morning and evening New Haven–Springfield Shuttle trains to allow double tracking work to begin.[48]

In December 2015, the state announced that the cost of construction had increased by $135 million for a total of $570 million, and that service would not begin until January 2018.[49]

In July 2016, work began at the New Haven State Street station on a new high-level platform.[50] In August 2016, a new 260feet high-level platform was put into service at Hartford. The platform was constructed on the existing low-level platform.

On October 11, 2016, a 17-car track-laying train began work to build the second track on the southern half of the line. The train laid track from North Haven to Meriden in October 2016, and returned for Meriden to Newington in 2017.[51] In 2017, the start date was pushed to May 2018 to accommodate construction of the new double track north of Hartford.[52] [53]

The new Wallingford station replaced the old station on November 6, 2017.[54] The rebuilt Meriden station opened on November 19, 2017,[55] though final construction continued through December 18, 2017.

The Amtrak portion of the program, including three new weekday New Haven–Springfield round trips and general alterations to the Amtrak schedule on the line took effect on June 9, 2018, with the new lower fares taking effect on the CTrail launch date on June 16.[9] Hartford Line service commenced on June 16, 2018, with free weekend service being offered on June 16 and 17. Full service commenced on June 18.[56]

The connection between a new double track section from Hartford to Windsor and an existing section from north of Windsor to south of Windsor Locks was completed on September 25, 2018, leaving less than 12miles of single track on the line.[57] The new section was not expected to allow additional service, but to increase reliability.[58] The state was awarded up to $105 million in Infrastructure Investment and Jobs Act funds in November 2023 for further work including additional double tracking along 6.2miles of the line in Enfield, between Windsor Locks and Windsor, and between Hartford and West Hartford.[59] The state will contribute $42 million in matching funds.[60] [61] The project is expected to allow for an increase in service from 35 to 44 trains each day. Work on the project is expected to take place between August 2024 and November 2027.[62]

Most service was replaced by buses from July 18 to September 9, 2022, during canopy roof replacement at Hartford Union Station and slope stabilization work in Windsor.[63]

See also

Further reading

External links

Notes and References

  1. Web site: Hartford Line: Year One Report . June 17, 2019 . Connecticut Department of Transportation . 4.
  2. News: ConnDOT finishes Hartford Line track project . September 26, 2018 . December 17, 2023 . . Jim . Kinney.
  3. Gov. Malloy Announced Three New Train Stations as Part of NHHS Rail Program . October 24, 2014 . State of Connecticut, Office of Governor Dannel P. Malloy . Hartford, Connecticut . October 25, 2014.
  4. News: Hundreds head to Hartford to celebrate new Springfield-to-New Haven CTrail line: 9 takeaways from the launch . MassLive . Kinney . Jim . June 17, 2018 . June 15, 2018.
  5. Web site: Thousands Take A Free Ride On Hartford Line's Inaugural Run . Porter . Mikaela . Owens . David . June 17, 2018 . June 17, 2018.
  6. Web site: Connecticut, Massachusetts Officials Cut Ribbon On Hartford Line . Rondinone . Nicholas . June 15, 2018 . Hartford Courant . June 17, 2018.
  7. 981246795723476992 . NHHSRail . 1 of 2: CTDOT has received confirmation that Amtrak will accept Hartford Line tickets onboard all Amtrak trains between New Haven and Springfield upon service launch, with the exception of the Vermonter. Tickets sold by Amtrak will be at Amtrak fare rates. . New Haven – Hartford – Springfield Rail Program . April 3, 2018 . April 11, 2018.
  8. Web site: CTrail Hartford Line Rail Service Scheduled to Launch June 16th! . Facebook . At the Meriden Ribbon Cutting Event, it was announced that Amtrak would be lowering one-way fares to match Hartford Line fares. . April 24, 2018.
  9. News: Connecticut DOT gears up for Hartford Line testing . Progressive Railroading . June 6, 2018 . June 6, 2018.
  10. Web site: $8 To New Haven: DOT Announces Proposed Fares For Hartford Line . October 23, 2017 . Hartford Courant . April 6, 2018.
  11. 981247531383435264 . NHHSRail . 2 of 2: Tickets at Hartford Line fare rates will only be sold at TVMs at Hartford Line stations, except for Windsor and Windsor Locks, and on board CTrail Hartford Line trains. Passengers boarding at Windsor/Windsor Locks do not pay the on board surcharge. . New Haven – Hartford – Springfield Rail Program . April 3, 2018 . April 11, 2018.
  12. CTDOT Announces Installation of Ticket Vending Machine at the Windsor Locks Hartford Line Station . November 16, 2018 . February 19, 2019 . Connecticut Department of Transportation.
  13. Web site: November 27, 2023 . CTrail Hartford Line Schedule: Effective November 27, 2023 . December 7, 2023 . Hartford Line.
  14. Web site: Hartford Line News and Notices . Hartford Line.
  15. Gov. Malloy: Newly Launched Hartford Line Attracted 21,850 Riders on its Opening, Free Travel Weekend . The Office of Governor Dannel P. Malloy . June 18, 2018 . June 27, 2018.
  16. Gov. Malloy: Hartford Line Ridership Tops 10,000 in First Full Week of Regular Operations . The Office of Governor Dannel P. Malloy . June 26, 2018 . June 27, 2018.
  17. Web site: 30-Kennedy Road (Bradley Flyer) | CTtransit - Connecticut DOT-owned bus service. www.cttransit.com.
  18. News: Connecticut replaces diesel Shore Line East trains with electric multiple-unit equipment . Trains magazine . May 24, 2022 . Scott A. . Hartley.
  19. Alstom to supply 60 single-level coach cars to the Connecticut Department of Transportation for its statewide rail system . August 9, 2023 . Alstom . en.
  20. Governor Lamont Announces Purchase of 60 New Rail Cars to Modernize Commuter Rail Lines . Connecticut Department of Transportation . August 9, 2023.
  21. Web site: NRE to overhaul Connecticut DOT commuter rail locomotives . March 20, 2017 . Trains Magazine . April 10, 2018 . April 10, 2018 . https://web.archive.org/web/20180410141400/http://trn.trains.com/news/news-wire/2017/03/20-nre-to-overhaul-connecticut-dot-commuter-rail-locomotives . dead .
  22. CTrail Hartford Line Rail Service Scheduled to Launch June 16; Commemorative Inaugural Event to be Held Friday, June 15 . April 17, 2018 . Connecticut Department of Transportation . April 17, 2018.
  23. State Project 320-0005 Proposed Railroad Station in Enfield . October 4, 2023 . en . Connecticut Department of Transportation . 30 . March 21, 2024.
  24. Web site: Transportation Infrastructure Capital Plan Spreadsheet (2021-2025) . February 4, 2021 . Connecticut Dept. of Transportation . 28.
  25. October 2021 . Northeast Corridor Capital Investment Plan Fiscal Years 2022-2026 . Project Information Appendix . https://nec-commission.com/app/uploads/2021/11/FY22-26-Capital-Investment-Plan-02-Appendix-Oct-21.pdf . . A3-78 .
  26. Web site: Objectives & Scope . New Haven–Hartford–Springfield Rail Program . Connecticut Department of Transportation . January 26, 2017.
  27. Book: Karr, Ronald Dale . The Rail Lines of Southern New England . Branch Line Press . 1995 . 0942147022 . 78.
  28. Connecticut: New Travel Options for the Northeast Region . June 2018 . SPEEDLINES . High-Speed Intercity Passenger Rail Committee . 23 . 20 . June 27, 2018.
  29. Web site: New Haven-Hartford and Waterbury-Hartford Rail Service Proposals . Fazzalaro, James J. . January 16, 2001 . Connecticut Department of Transportation . https://web.archive.org/web/20060927185221/http://www.cga.ct.gov/2001/rpt/olr/htm/2001-r-0021.htm . September 27, 2006 . October 25, 2014.
  30. South Central Regional Council of Governments Mobility, A Transportation Plan for the Year 2020 page 8
  31. Greater New Haven Chamber of Commerce Legislative Agenda booklets 1997 p. 7, 1999 p.7, 2000 pp. 9,10, 2002 p. 14, 2003 p.6, 2004 p. 6, 2006 p. 2
  32. Web site: Recommended Action . Wilbur Smith Associates . 2005 . New Haven Hartford Springfield Commuter Rail Implementation Study . Connecticut Department of Transportation . November 3, 2014.
  33. Web site: Winter 2018 Newsletter . January 17, 2018 . NHHS Rail Program . January 17, 2018.
  34. Web site: After Feds Put Connecticut Rail Plan On Slow Track, State Will Seek More Funds . Hartford Courant . January 31, 2010 . February 15, 2010 . February 3, 2010 . https://web.archive.org/web/20100203214510/http://www.courant.com/news/connecticut/hc-rail-money-puzzle-0131.artjan30,0,5617970.story . dead.
  35. Web site: HSIPR Funding by Region . Federal Railroad Administration . April 2, 2018.
  36. News: Gov. M. Jodi Rell seeks state OK to borrow $260 million to push high-speed rail . Stamford Advocate. July 27, 2010.
  37. News: State OKs $260 Million To Pay For Commuter Rail System . https://archive.today/20130120044833/http://www.courant.com/news/connecticut/hc-bond-commission-0818-20100817,0,1802785.story . dead . January 20, 2013 . The Hartford Courant.
  38. Governor Rell: Connecticut Wins $120 Million for New Haven-Hartford-Springfield Rail Project . October 25, 2010 . Office of Governor Jodi Rell . March 23, 2018.
  39. News: Conn. seeks funds for rail work on Hartford-to-Springfield line (document) . Stannard . Ed . April 6, 2011 . New Haven Register.
  40. Web site: Environmental Assessment . NHHS Rail Program . August 21, 2012.
  41. CTDOT Announces $50 Million In Additional Funding For NHHS Rail Program . February 20, 2017 . Connecticut Department of Transportation .
  42. News: Hartford Line From Hartford To Springfield, Mass. Gets $50 Million In Bonding . Stacom . Don . February 21, 2017 . Hartford Courant . March 21, 2017.
  43. Web site: Appendix 6: New Haven-Hartford-Springfield Rail Program Track Chart . January 2012 . Connecticut Department of Transportation.
  44. News: Rail station, hotel, housing fill Newington's bucket list. Hartford Business Journal. October 28, 2018. en-US. October 27, 2018. https://web.archive.org/web/20181027094044/http://www.hartfordbusiness.com/article/20181022/PRINTEDITION/310189933. dead.
  45. News: Hartford Rail Line On Track Despite Connecticut Budget Crisis . Stacom . Don . February 18, 2017 . Hartford Courant . February 18, 2017.
  46. Web site: Objectives & Scope: Funding . NHHS Rail Program . Connecticut DOT . October 17, 2017.
  47. Web site: New Haven–Hartford–Springfield Rail Program Stations Factsheet . November 29, 2016 . NHHS Rail Program . January 26, 2017.
  48. Amtrak Begins Substitute Bus Operation to Facilitate Construction on Hartford Line . July 31, 2015 . Connecticut Department of Transportation . August 3, 2015.
  49. News: Springfield-To-New Haven Commuter Rail Cost Increases, Service Begins In 2018 . Stacom . Don . December 4, 2015 . Hartford Courant . December 4, 2015.
  50. Web site: Fall 2016 Newsletter . November 29, 2016 . NHHS Rail Program . January 26, 2017.
  51. News: 17-Car Construction Train Works Its Way North, Laying Track On Hartford Line . Stacom . Don . October 11, 2016 . Hartford Courant . October 12, 2016.
  52. Web site: Summer 2017 Newsletter . Summer 2017 . NHHS Rail Program . 2.
  53. Gov. Malloy Announces TransitAmerica Services and Alternate Concepts Selected as Service Provider for the Hartford Line . The Office of Governor Dannel P. Malloy . July 24, 2017.
  54. Gov. Malloy Announces Opening of New Train Station in Wallingford That Will Serve the Hartford Line . November 6, 2017 . Office of Governor Dannel P. Malloy .
  55. CTrail Hartford Line Meriden Station Opens Platforms and Pedestrian Bridge . November 19, 2017 . Connecticut Department of Transportation . November 26, 2017.
  56. Web site: Hartford Line commuter rail to launch in June . April 18, 2018 . Progressive Railroading . June 1, 2018.
  57. CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE CTrail HARTFORD LINE BETWEEN HARTFORD AND WINDSOR . Connecticut Department of Transportation . September 25, 2018.
  58. News: Despite New Commuter Line, Rail Upgrades Lag North Of Hartford . Rebecca . Lurye . . June 12, 2018 . June 13, 2018.
  59. Web site: November 7, 2023 . FY22-23 Federal-State Partnership (NEC) Grant Program Selections . November 9, 2023 . railroads.dot.gov . Federal Railroad Administration.
  60. Web site: FY 2022-2023 Federal-State Partnership for Intercity Passenger Rail Program for the Northeast Corridor (FSP-NEC) Selections: Project Summaries . November 6, 2023 . Federal Railroad Administration.
  61. November 6, 2023 . FACT SHEET: President Biden Advances Vision for World Class Passenger Rail by Delivering Billions in New Funding . The White House.
  62. News: DiSalvo . Emily . November 7, 2023 . Hartford Line gets $105M in federal funding to add tracks for more trains, improve signals . CT Insider . November 9, 2023.
  63. Safety and Track Improvement Projects on the Hartford Line Result in Two Month Service Changes . June 24, 2022 . Connecticut Department of Transportation.