New Exchequer Dam Explained

New Exchequer Dam
Coordinates:37.5861°N -120.2694°W
Country:United States
Location:Mariposa County, California
Owner:Merced Irrigation District
Dam Type:Concrete–faced rockfill[1]
Dam Height:490feet[2]
Dam Length:1220feet
Dam Elevation Crest:879feet
Dam Crosses:Merced River
Spillway Count:Gated ogee crest
Res Name:Lake McClure
Res Capacity Total:1024600acre.ft
Res Catchment:1040.1mi2
Res Surface:7147acres
Res Elevation:867feet
Res Max Length:29miles
Plant Hydraulic Head:437feet
Plant Capacity:94.5 MW[3]
Plant Annual Gen:279,065,000 KWh (2001–2012)[4]

New Exchequer Dam is a concrete–faced, rock-fill dam on the Merced River in central California in the United States. It forms Lake McClure, which impounds the river for irrigation and hydroelectric power production and has a capacity of more than 1000000acre feet. The Merced Irrigation District (MID) operates the dam and was also responsible for its construction.

Built between 1964 and 1967, the dam replaced the old arch type Exchequer Dam and stands 490feet high. At the time of completion, it was the largest dam of its kind in the world. The dam is named for the town of Exchequer which now lies under the reservoir, while the reservoir is named for Wilbur F. McClure, the State Engineer of California during construction.

History

In 1926, after five years of planning and construction, MID completed the Exchequer or "Great Exchequer" Dam[5] across the Merced River six miles (9.7 km) above the town of Merced Falls. The dam was a concrete gravity–arch structure 326feet high, holding a 14miles lake with a capacity of 281000acre feet of water. Although the dam was to serve primarily for irrigation, power production began ceremoniously on June 23, 1926 with a press of a telegraph key by President Calvin Coolidge, starting the turbines at a 31 megawatt hydroelectric plant.[6] By the 1950s, it became apparent that the limited storage capacity at Exchequer was no longer enough to serve the needs of farmers in the Merced River valley. A high dam was proposed to be built just downstream, creating a reservoir nearly four times the size of Exchequer.[6]

Construction of New Exchequer Dam began on July 8, 1964, directly downstream from the old concrete arch dam.[6] Tudor Engineering Company of San Francisco was responsible for the design of the new dam.[7] The dam wall was constructed in vertical zones, which consisted of compacted, alternating layers of coarse and fine material ranging in thickness from 1.6feetto66feetft (toft).[8] The old Exchequer Dam was incorporated as an upstream toe to help support the rock-fill embankment, which was then armored with a layer of reinforced concrete.[9] The dam was topped out in early 1967[6] and the power plant went into commercial operation by July.[9]

As the new reservoir filled, it inundated an additional 15miles of the Merced River canyon and buried sections of the historic Yosemite Valley Railroad and the mining town of Bagby under 50feet of water.[10] New Exchequer was among the first high concrete–faced rock-fill dams in the world, and its untested design resulted in significant leakage, sometimes up to 100cuft/s. MID began to repair the leaks in the fall of 1985 under orders from the California Division of Safety of Dams.[11]

The dam has been able to halt major floods in many instances, such as the New Year's Day Flood of 1997.[6] However, it has not always been able to weather the worst droughts – such as in 1977, when the reservoir fell to just 75000acre feet, a fourteenth of capacity,[11] and in 1991, which saw historic low water levels of 66100acre feet.[12] In February 2015, the reservoir reached its lowest level on record, at 63489acre feet or less than 7 percent of total capacity, due to three years of persistent drought.[13] [14]

Dimensions and usage

New Exchequer Dam stands 490feet high from the foundations and 479feet above the Merced River. The dam is 1220feet long, 18feet wide at the crest, 1000feet wide at the base and is composed of 5169000yd3 of fill. High water releases are controlled by an ogee-type, gated overflow spillway located about 2miles north of the dam.[1] [2] The dam's power station has a capacity of 94.5 megawatts and generates about 316 million kilowatt hours annually.[3]

The reservoir has a storage capacity of 1024600acre feet, of which 350000acre feet is reserved for flood control. At full pool, the reservoir has an elevation of 867feet, with 7147acres of water and 82miles of shoreline.[2] [15] To fulfill downstream flood control requirements, the reservoir will only be allowed to rise into the flood-control pool if the flow downstream at Stevinson is forecast to exceed 6000cuft/s.[16]

MID has proposed raising the spillway gates of the dam, which would provide up to 70000acre.ft of additional storage. However, this has met with controversy because it would result in part-time flooding of a portion of the Merced River designated Wild and Scenic.[17] Opponents also point out that the raise is unnecessary, since the reservoir has never overflowed due to flooding since its completion in the mid-1960s.[18]

Lake McClure is also extensively developed for recreational activities, with 515 campsites, four boat ramps and two marinas.[2] In 1992, the lake received 606,000 visitor-days, mostly from May to September.[19]

See also

External links

Notes and References

  1. Web site: New Exchequer–Lake McClure (EXC). California Department of Water Resources. California Data Exchange Center. 2012-03-24.
  2. Web site: Merced River Hydroelectric Project Relicensing. Federal Register. Federal Energy Regulatory Commission. 2012-03-16. 2012-03-24.
  3. Web site: Appendix X: Hydropower and Electric Grid Analysis of Lower San Joaquin River Flow Alternatives. California State Water Resources Control Board. Evaluation of San Joaquin Flow and Southern Delta Water Quality Objectives and Implementation. February 2012. 2012-03-24.
  4. Web site: California Hydroelectric Statistics & Data. California Energy Commission. 2018-04-26. 2018-02-26. https://web.archive.org/web/20180226135225/http://www.energy.ca.gov/almanac/renewables_data/hydro/index.php. dead.
  5. Huge Dam to Form Mountain Lake for Water and Power. Popular Science. 180. 5. 1926. 43.
  6. Web site: History of the District . Merced Irrigation District . 2012-03-25 . dead . https://web.archive.org/web/20120323052041/http://www.mercedid.org/historyofthedistrict . 2012-03-23.
  7. Old dam topped by water flowing to successor. Popular Science. 1966. 119. 189. 3.
  8. Book: Tančev, Ljubomir. Dams and Appurtenant Hydraulic Structures. Taylor & Francis. 2005. 90-5809-586-X. 279.
  9. Merced River Development Project. Journal of the Surveying and Mapping Division. 94–95. 1968. 1. 203–205.
  10. Web site: The Disappearance of Bagby–As told through these newspaper accounts. Mariposa County Genealogy & Historical Research. 2012-03-25.
  11. News: Kane, William D.. Low water level exposing old Exchequer Dam. The Modesto Bee. 1985-09-04.
  12. Web site: USGS Gage #11269500 on Lake McClure at Exchequer, CA. U.S. Geological Survey. National Water Information System. 1926–1999. 2012-03-26. https://web.archive.org/web/20120717041422/http://ca.water.usgs.gov/data/waterdata/99/11269500.html. 2012-07-17.
  13. Web site: Drought Watch. Merced Irrigation District. 2014-12-31.
  14. Web site: New Exchequer-Lake McClure Reservoir Data for January–February 2014. California Department of Water Resources. California Data Exchange Center. 2015-02-10.
  15. Web site: Merced National Wild & Scenic River Status and the Merced Irrigation District New Exchequer Dam Project . Friends of the River . 2011-03-10 . 2012-03-25 . dead . https://web.archive.org/web/20150910121520/http://www.friendsoftheriver.org/site/DocServer/Merced_WSRA_designation_and_New_Exchequer_Dam.pdf?docID=5841 . 2015-09-10.
  16. Web site: Chapter 3: Central Valley Flood Management Systems . Auburn Dam Council . Post–Flood Assessment for 1983, 1986, 1995, and 1997 . 2012-03-25 . 37 . dead . https://web.archive.org/web/20160311201335/http://www.auburndamcouncil.org/pages/pdf-files/3-cv_floodmgmt_system.pdf . 2016-03-11.
  17. Web site: New Exchequer Dam Spillway Modification Project Fact Sheet. Merced Irrigation District. 2011-08-01.
  18. Web site: Bill To Roll Back Merced Wild And Scenic Boundary Reintroduced (CA). American Whitewater. Hooker, Megan. 2013-03-15. 2014-03-16.
  19. Web site: Affected Environment: Recreation. San Joaquin River Group Authority. Administrative Final EIS/EIR. 1999-01-28. 2012-08-26.