Nemuro Main Line Explained

Nemuro Line
Native Name:根室本線
Color:8cc63e
Color2:f6989d
Status:In operation
Stations:59
Open:1901
Close:1 April 2024 (Furano–Shintoku) (planned)[1] [2]
Operator:JR Hokkaido
Character:Rural
Depot:Kushiro
Stock:KiHa 261 series DMU, KiHa 40 series DMU, KiHa 54 series DMU, H100 series DEMU
Linelength:443.8km (275.8miles)
Tracks:Entire line single tracked
Electrification:None
Speed:120 km/h (75 mph) (max)
Map State:collapsed

is a railway line in Hokkaido operated by Hokkaido Railway Company (JR Hokkaido), connecting Takikawa Station in Takikawa and Nemuro Station in Nemuro, including Obihiro and Kushiro. Higashi-Nemuro is the most easterly situated station on the Japanese rail system.

Services

Local trains operate between Takikawa and Furano 9 times per day, and between Furano and Higashi-Shikagoe 4 times per day. Due to typhoon damage sustained in August 2016, the line is closed between Higashi-Shikagoe and Shintoku, and passengers must transfer to a bus.[3]

The segment east of Shintoku forms part of the trunk route between Sapporo (via the Sekisho Line) and eastern Hokkaido, and has more frequent service, although with decreasing frequencies as the line goes east. The limited express train Ōzora runs between Sapporo and Kushiro six times a day, while the Tokachi runs five times a day between Sapporo and Obihiro.[4] There are 11 daily local services between Shintoku and Ikeda, 8 daily local services between Ikeda and Urahoro, and 6 daily local services between Urahoro and Kushiro.[5]

The segment between Kushiro and Nemuro has the official nickname . There are two rapid trains and which run once a day each. Six daily local services operate between Kushiro and Attoko, and four or five operate to the eastern terminus at Nemuro. As of late 2022, this segment of the line saw frequent delays and cancellations due to deer incursions causing trains to make emergency stops.[6]

Nemuro can be reached in a continuous 1,559.2 km train journey from Tokyo Station, which takes a total of just over 15 hours on four trains, departing Tokyo at 6:32 am and arriving in Nemuro at 9:39 pm.[7]

Stations

LE: Limited express

R: Rapid

All non-local trains stop at stations signed "+", some stop at "*", no such trains stop at "-". Local trains stop at all stations, except Ikutora and Ochiai (no services since 2016 due to line closure), and stations marked "◌" where some local trains skip.

No. Station name Japanese Distance (km) LE R Transfers Location (all in Hokkaido)
滝川 align=right 0.0 align=center + Takikawa
東滝川 align=right 7.2 align=center -
赤平 align=right 13.7 align=center + Akabira
茂尻 align=right 17.2 align=center +
平岸 align=right 20.7 align=center -
芦別 align=right 26.6 align=center + Ashibetsu
上芦別 align=right 30.5 align=center +
野花南 align=right 35.2 align=center
富良野 align=right 54.6 align=center + Furano
布部 align=right 60.9 align=center
山部 align=right 66.7 align=center +
下金山 align=right 74.7 align=center Minamifurano, Sorachi
金山 align=right 81.6 align=center +
東鹿越 align=right 94.8 align=center +
幾寅 align=right 98.8 align=center
落合 align=right 108.2 align=center
Kami-Ochiai Junction 上落合(信) align=right 112.2 align=center
新得 align=right 136.3 align=center + align=center + Shintoku, Kamikawa
十勝清水 align=right 145.4 align=center align=center + Shimizu, Kamikawa
御影 align=right 155.9 align=center - align=center -
芽室 align=right 166.5 align=center align=center + Memuro, Kasai
大成 align=right 168.6 align=center - align=center -
西帯広 align=right 173.4 align=center - align=center - Obihiro
柏林台 align=right 176.6 align=center - align=center -
帯広 align=right 180.1 align=center + align=center +
札内 align=right 184.9 align=center - Makubetsu, Nakagawa
幕別 align=right 194.3 align=center -
利別 align=right 200.8 align=center - Ikeda, Nakagawa
池田 align=right 204.3 align=center +
十弗 align=right 212.8 align=center - Toyokoro, Nakagawa
豊頃 align=right 218.2 align=center -
新吉野 align=right 225.3 align=center - Urahoro, Tokachi
浦幌 align=right 231.7 align=center
厚内 align=right 250.1 align=center -
音別 align=right 265.1 align=center - Kushiro
白糠 align=right 281.1 align=center Shiranuka, Shiranuka
西庶路 align=right 286.5 align=center -
庶路 align=right 288.6 align=center -
大楽毛 align=right 299.0 align=center - Kushiro
Shin-Otanoshike新大楽毛 align=right 300.8 align=center -
新富士 align=right 305.7 align=center -
釧路 align=right 308.4 align=center + align=center +
東釧路 align=right 311.3 align=center Senmō Main Line
武佐 align=right 312.5 align=center
別保 align=right 317.0 align=center Kushiro Town, Kushiro
上尾幌 align=right 331.7 align=center Akkeshi, Akkeshi
尾幌 align=right 340.9 align=center -
門静 align=right 350.1 align=center -
厚岸 align=right 355.0 align=center +
茶内 align=right 375.2 align=center + Hamanaka, Akkeshi
浜中 align=right 382.2 align=center +
姉別 align=right 392.3 align=center -
厚床 align=right 398.9 align=center + Nemuro
Bettoga別当賀 align=right 414.5 align=center
落石 align=right 424.8 align=center +
Konbumori昆布盛 align=right 428.8 align=center
Nishi-Wada西和田 align=right 433.6 align=center
東根室 align=right 442.3 align=center
根室 align=right 443.8 align=center +

History

The line was built as a link line between central and eastern Hokkaido, by . The first section of the current Nemuro Line was opened between Kushiro - Shiranuka in 1901. The line was extended westward, reaching Furano in 1907. In 1913 the Furano - Takikawa section opened, shortening the route by 53.5 km. The first section, originally included as part of the Nemuro Line, become classified as the Furano Line in 1913.

In 1911, 1st class sleeping accommodation was included on the Hakodate to Kushiro train, and a dining car was added from 1916.

The first section of the line east of Kushiro opened in 1917, reaching Nemuro in 1921.

In 1966, two major deviations opened, the first, east of Kanayama, associated with the construction of the Kanayama Dam, and the second between Ochiai and Shintoku, including the 5,790 m Shinkarikachi tunnel allowing the line to bypass the 1907 Karikachi tunnel and associated 1 in 40 (2.5%) grades.

In 1971, a refrigerated container train was introduced between Kushiro and Tokyo.

In 1990, a new tunnel and associated alignment opened near Atsunai, and a deviation near Shimanoshita associated with the construction of the Takisato Dam was opened in 1991.

Decline and closures

In 1981, the Sekishō Line opened between Shin-Yubari and Shintoku, becoming the main route between central and southeastern Hokkaido and shortening the distance for stations east of Shintoku to Sapporo. This led to a rapid decline in ridership on the Furano-Shintoku segment of the Nemuro Main Line, from 4,664 a day in 1980 to 654 a day in 1985. Population decline in the area also contributed to a decline in ridership. By 2015, only 152 people per day were using this segment of the line, most of whom were commuting senior high school students.[8]

On 31 August 2016, torrential rainfall damaged the 17.4 km section between Higashi-Shikagoe and Kami-Ochiai Junction resulting in the passenger service from Higashi-Shikagoe to Shintoku being replaced by a bus. Thereafter, on 19 November 2016, JR Hokkaido's president announced plans to rationalise the network by up to 1,237 km, or ~50% of the current network,[9] including closure of the Nemuro Line between Furano and Kami-Ochiai Junction. In January 2022, the four local governments between Furano and Shintoku gave up on maintaining this segment of the line, and in December the president of JR Hokkaido announced a goal to convert this portion to bus service in 2023 or thereafter.[10] A notice of abolition was submitted on March 31, 2023.[11] [12]

The section between Kushiro and Nemuro was also proposed for conversion to Third Sector operation, but if local governments were not agreeable, such sections would also face closure. In April 2021, Nemuro City raised over 50 million yen through crowdfunding to keep the eastern Hanasaki Line portion open, after JR Hokkaido stated that the line was difficult to maintain on its own.[13] As of mid-2021, this portion of the line saw only about 200 passengers per day.[14]

On 4 March 2017, 3 more stations were closed - Shimanoshita Station (T29), Kami-Atsunai Station (K41) and Inashibetsu Station (K33).[15] On 17 March the following year, Haobi Station (K25) was closed.[16]

On 16 March 2019, Chokubetsu Station (K43), Shakubetsu Station (K44) and Hattaushi Station were closed, two of these becoming signal points: Chokubetsu and Shakubetsu.[17]

On 14 March 2020, Furuse Station (K46) was closed, reducing the number of stations on the Nemuro Main Line to 60.In June 2023, it was revealed that effective 1 April 2024, the section of the line between Furano and Shintoku will be closed, splitting the line in two.[1] In addition, five stations (Higashi-Takikawa (T22), Atsunai (K42), Oboro, Bettoga, Kombumori) will be closed owing to low ridership.[18]

Former connecting lines

Ashibetsu area

The Mitsubishi Mining Co. opened an 8 km line to Penke Sanko in 1949, and a 1 km branch to the Yuya mine in 1954. Both closed with the mine in 1964.

A 762 mm (2'6") gauge logging tramway was operated from Kamiashibetsu commencing 1934. By 1954 it had a 31 km 'main line' and 5 branches totalling 44 km. The lines closed in 1961 when log trucks replaced the tramway.

Shintoku area

Obihiro area

The 78 km Shihoro Line to Tokachi Mitsuma opened in sections between 1925 and 1939. An 18 km deviation built in association with the Nukabira Dam opened in 1955. The line closed in 1987.

The 84 km Hiroo Line opened between 1929 & 1932 and was closed in 1987. A proposal to extend the line to Samani and connect to the Hidaka Main Line did not eventuate.

A 4 km private 1067mm (3'6") line connected a sugar beet factory to Obihiro. The sugar beets were transported to the factory by a 3 line 762mm gauge network totalling 59 km, which operated 1924–77.

Shakubetsu - Higashi-Kushiro section

Hamanaka - Nemuro section

See also

Notes and References

  1. 北海道旅客鉄道株式会社の鉄道事業の一部を廃止する届出及び本届出に係る公衆の利便の確保に関する意見の聴取について. PDF. 国土交通省北海道運輸局. 2023-03-31. 2023-03-31. https://web.archive.org/web/20230331082840/https://wwwtb.mlit.go.jp/hokkaido/content/000293006.pdf. 2023-03-31.
  2. 根室線(富良野・新得間)の鉄道事業廃止届の提出について. PDF. 北海道旅客鉄道. 2023-03-31. 2023-03-31. https://web.archive.org/web/20230331082833/https://www.jrhokkaido.co.jp/CM/Info/press/pdf/230331_KO_Nemuro_Line.pdf. 2023-03-31.
  3. Web site: March 12, 2022 . Notice of rail replacement bus service between Higashi-Shikagoe and Shintoku .
  4. Web site: The Limited Express Ozora for Kushiro, Obihiro, and Sapporo – Sapporo Station . 2023-01-06 . www.sapporostation.com.
  5. JR Hokkaido online timetable, January 2023
  6. Web site: Increase in JR train cancellations caused by deer, with 88 in 12 days - The Hokkaido Shimbun Press . 2023-01-06 . en.
  7. Web site: Cape Nosappu: The most eastern point in Japan . 2023-01-06 . JRPass.com . en.
  8. Web site: JR根室線 富良野〜新得廃止へ 地域の足はどうなる? . 2023-01-06 . NHK北海道 . ja.
  9. Web site: 19 November 2016 . JR Hokkaido says it can't maintain half of its railways . https://web.archive.org/web/20170202054934/http://www.japantimes.co.jp/news/2016/11/19/business/jr-hokkaido-says-cant-maintain-half-railways/ . 2 February 2017 . The Japan Times.
  10. Web site: 富良野―新得、早期バス転換目指す JR北海道社長 新幹線延伸「目標通りに」:北海道新聞 どうしん電子版 . 2023-01-06 . 北海道新聞 どうしん電子版 . ja.
  11. 北海道旅客鉄道株式会社の鉄道事業の一部を廃止する届出及び本届出に係る公衆の利便の確保に関する意見の聴取について. PDF. 国土交通省北海道運輸局. 2023-03-31. 2023-03-31. https://web.archive.org/web/20230331082840/https://wwwtb.mlit.go.jp/hokkaido/content/000293006.pdf. 2023-03-31.
  12. 根室線(富良野・新得間)の鉄道事業廃止届の提出について. PDF. 北海道旅客鉄道. 2023-03-31. 2023-03-31. https://web.archive.org/web/20230331082833/https://www.jrhokkaido.co.jp/CM/Info/press/pdf/230331_KO_Nemuro_Line.pdf. 2023-03-31.
  13. News: 2021-04-07 . Over $455,000 donated to save local line in Hokkaido for use as 'train trips' for children . en . Mainichi Daily News . 2023-01-06.
  14. Web site: Tandler . Agnes . 2021-06-02 . Loneliness at the End of the Line . 2023-01-06 . japan-forward.com . en-US.
  15. Web site: About JR Hokkaido March 2017 timetable revision . Hokkaido Railway Company . 27 March 2024 . Japan . Japanese . 16 January 2016.
  16. Web site: About JR Hokkaido March 2018 timetable revision . Hokkaido Railway Company . 27 March 2024 . Japan . Japanese . 15 December 2017.
  17. Web site: https://web.archive.org/web/20181214051017/https://www.jrhokkaido.co.jp/CM/Info/press/pdf/20181214_KO_H31Kaisei.pdf. 2019年3月ダイヤ改正について. 14 December 2018. About March 2019 schedule revision. ja. 14 December 2018. JR Hokkaido.
  18. Web site: Sugiyama . Junichi . 26 June 2023 . 「JR北海道が42駅廃止検討」報道、宗谷本線の駅がごっそり消える? . Report of JR Hokkaido regarding abolition of 42 Stations, majority of which are on the Soya Main Line . live . https://web.archive.org/web/20230627012656/https://news.mynavi.jp/article/20230626-jrhokkaido/ . 27 June 2023 . 4 July 2023 . MyNavi Corporation . ja.