Dam Type:Curved gravity dam
Dam Length:518m (1,699feet)
Dam Height:80m (260feet)
Construction Began:2013
Opening:October 2019
Res Capacity Total:880e6m3
Res Catchment:45365km2
Res Surface:25km2
Plant Turbines:2 x Francis turbines, 1.5 MW each
Plant Capacity:3 MW

The Neckartal Dam, nicknamed the Desert Dragon, is a dam located in the ǁKaras Region of southern Namibia. It is a curved gravity dam on the Fish River near Berseba, northwest of the regional capital Keetmanshoop. Construction started in 2013 and was initially expected to finish in 2017. Since its completion in 2018, it is the largest dam in Namibia, more than three times the capacity of the Hardap Dam upstream. The dam's purpose is to support a irrigation scheme nearby.[1]

Construction

The idea to construct a dam near Keetmanshoop already came up during the era of German colonialisation. Upon Namibian independence in 1990, the planning slowly came into motion.[1] Although hailed as a promising job creation project, particularly after commission due to the purpose as an irrigation dam, there were doubts over the necessity to build it. Naute Dam in the same area, likewise an irrigation dam, is under-utilised. However, for an irrigation scheme of as envisaged for the Neckartal Dam, Naute Dam was deemed too small.[2]

Italian company Salini Impregilo was awarded the 2.8 billion Namibian dollar tender to build the dam in March 2012. After a legal challenge by one competitor, the tender was withdrawn but re-awarded to the same company in August 2013. Construction started within a month. Originally planned to take 3 years, the project has been delayed by a court case and labour unrest. Its completion occurred in October 2018, after which the filling-up phase was expected to last another two years. The dam overflowed for the first time on 19 January 2021 after an exceptionally good rainy season. [3] [1] [4]

Notes and References

  1. Web site: Neckartal Dam: Making a Desert Bloom . . 7 April 2016 .
  2. News: Neckartal Dam questioned . Cloete . Luqman . . 8 January 2010 . 1 .
  3. live. https://ghostarchive.org/varchive/youtube/20211208/GK31Fdhvi7Q. 2021-12-08. Neckartal Dam overflows for the first time in history . YouTube.
  4. Web site: Neckartal Dam completed ... work on Ohangwena aquifer begins. 23 October 2018. Namibian.