National Waterway 1 Explained

National Waterways (NW-1)
Location:India
Length:1620km (1,010miles)
East End:Haldia, West Bengal
West End:Prayagraj, Uttar Pradesh
Terminals:18 Floating Terminal
2 Fixed RCC Jetty
Owner:Inland Waterways Authority of India (IWAI)
Operator:Central Inland Water Transport Corporation (CIWTC)

The National Waterway 1 (NW-1) or Ganga-Bhagirathi-Hooghly river system is located in India and runs from Prayagraj in Uttar Pradesh to Haldia in West Bengal via Patna and Bhagalpur in Bihar across the Ganges river.[1] It is 1620km (1,010miles) long,[2] making it the longest waterway in India. It is of prime importance amongst all the national waterways considering its locational advantages. The NW-1 passes through West Bengal, Jharkhand, Bihar and Uttar Pradesh and serves major cities and their industrial hinterlands like;

It was declared as a waterway in October 1986. It is navigable by mechanical boat up to Patna.

Development

The topography of NW-1 falls within the flat terrain of the Indo-Gangetic plain. The elevation ranges from 1to above mean sea level. The land is predominantly agricultural with some of the major cities of India lying in this region. For thousands of years, river Ganga and its tributaries and distributaries have been used for navigation and to transport people and local produce from these agricultural lands.

On 12 August 2016 Nitin Gadkari, the Union Minister for Shipping, Road Transport and Highways laid the foundation stone of the waterway terminal at Varanasi, Uttar Pradesh.[3] He flagged off the trial run of two vessels which carried newly manufactured cars of Maruti Suzuki from Varanasi to Haldia, West Bengal.[4]

On 12 November 2018 Prime Minister Narendra Modi inaugurated multi-modal terminal at Varanasi.

The NW-1 is being developed at an estimated cost of, with financial assistance of 375 million from the World Bank. The 1620abbr=onNaNabbr=on route of NW-1 will be upgraded to maintain the following least available depth to allow for higher tonnage vessels of 1,500-2,000 tonnage to ply on the route.

Distance !! data-sort-type="number"
Least Available Depth
Allahabad to Ghazipur 370km (230miles) 1.2to
Ghazipur to Barh 290km (180miles) 21NaN1
Barh to Farakka 400km (200miles) 2.51NaN1
Farakka to Haldia 560km (350miles) 31NaN1

Major challenges

One of the major changes to the development of NW-1 is braiding and meandering characteristics of river Ganga and the large fluctuation of the water volume during the summer and monsoon months. The major challenges are:

Route

Sl No Name of Terminal Land area Size of berth Type of terminal
1 10319m2 200m (700feet) Floating Terminal
2 Botanical Garden Jetty 996m2 50m (160feet) Floating Terminal
3 BISN Jetty 11606.64m2 100m (300feet) Floating Terminal
4 8000m2 100m (300feet) Floating Terminal
5 Pontoon placed on water front 30m (100feet) Floating Terminal
6 Hazardwari Pontoon placed on water front 30m (100feet) Floating Terminal
7 4800m2 80m (260feet) Floating Terminal
8 G.R.Jetty - 2 14606m2 216m (709feet) Fixed RCC Jetty
9 Pontoon placed on water front 35m (115feet) Floating Terminal
10 Pontoon placed on water front 35m (115feet) Floating Terminal
11 Bateshwarsthan,KahalgaonPontoon placed on water front 35m (115feet) Floating Terminal
12 1000m2 35m (115feet) Floating Terminal
13 13759m2 35m (115feet) Floating Terminal
14 13112m2 46.6m (152.9feet) Fixed RCC Jetty
15 align="center"- 27m (89feet) Floating Terminal
16 Pontoon placed on water front align="center"- Floating Terminal
17 Pontoon placed on water front align="center"- Floating Terminal
18 Pontoon placed on water front 35m (115feet) Floating Terminal
19 Varanasi Multi-Modal TerminalPontoon placed on water front 35m (115feet) Floating Terminal
20 Pontoon placed on water front 35m (115feet) Floating Terminal
21 87590m2 35m (115feet) Floating Terminal

Traffic

Even today the stretch of the river assigned as NW-1 is being used to transport cargo - mostly local produce and tourists. The Ministry of Shipping projects that the NW-1 will carry mostly bulk goods. Cargo like cement, iron ore, coal and coal combustion products, crude oil and petroleum products, rock phosphate, timber, stone chips, manganese ore and agricultural produce Finished iron products from the number of steel plants present in this region will also be a major cargo in this route.

Terminal Node !! colspan="3"
Projected Cargo
(million tons per annum)
data-sort-type="number"2015 !data-sort-type="number"2030 !data-sort-type="number"2045
Sahibganj Terminal 2.24 4.39 9.00
Varanasi Terminal 0.54 1.22 1.22
Haldia Terminal 4.07 4.07 4.07

Controversy

The National Waterway 1 was landed in a controversy and protests after Nitin Gadkari, the Union Minister of Shipping in July, 2014 announced that the government will construct barrages every 100km (100miles) on river Ganga and will undertake dredging activities in identified stretch to provide a width of 45m (148feet) and a depth of 3m (10feet) to enable transport of passengers and goods between Varanasi and Hooghly on river Ganga in the first stage of its development.[5] [6] The initial proposal is based on a study by Danish Hydrological Institute, which prepared reports on two stretches between Prayagraj and Varanasi and between Varanasi and Buxar.[7] The announcement was made after World Bank agreed to fund the initial 50 million including technical support without any public consultation.[8] The move was criticized by river activists and professors of Banaras Hindu University.[9]

Involvement of World Bank

A representation was sent by several experts on the environmental and social impact of reviving the NW-1 to Government of India and World Bank in August, 2014. The representation was led by economist Dr. Bharat Jhunjhunwala along with a group of environmentalists and former bureaucrats. The representation was followed by meetings with World Bank. The World Bank representatives were briefed about the ecological and social implications of the proposal. The adverse impact on river bank communities, the unmitigated displacement of people due to erosion at Farakka, a cost-benefit analysis for all stakeholders involved and whether taxation of the waterway will render it unviable. The World Bank clarified that they were unaware of the plan to construct 16 barrages and no funds had been disbursed till then. However, as per a letter dated 18 June 2014 forwarded by Shipping Minister Mr. Nitin Gadkari to the Finance Minister, Mr. Arun Jaitley, a proposal for financial assistance to four navigational barrages was made.

Opposition from Chief Minister of Bihar

The Government of Bihar led by Chief Minister Nitish Kumar opposed the initiative to construct barrage on Ganga stating that construction of barrages will convert Ganga into big ponds. He stated that not a single drop of pure water from Ganga reaches Bihar due to similar barrages in upstream of the river. Later, the Inland Waterways Authority of India (IWAI) has clarified that there are at present no plans to construct any new barrage on the 1620km (1,010miles) stretch of the NW-1 on the Ganga.

Dredging of Ganga

Environmentalist Debadityo Sinha claimed that World Bank has possibly scrapped the plan for construction of barrages for the National Waterway-1 after public opposition from Uttar Pradesh and Bihar. However, significant maintenance dredging of the river Ganga will be undertaken by the government of India to make it navigable. The author also alleged that the Ministry of Environment, Government of India has made an amendment in law in January, 2016 in which dredging activities for maintenance is exempted from the requirement of Environmental Clearance.[10]

Threat to Gangetic Dolphin and aquatic fauna

Wildlife Biologist Nachicket Kelkar claimed that the noise and disturbance caused by intensive dredging activities is known to have deleterious impacts on aquatic biodiversity, especially the National Aquatic Animal of India, the Ganges River Dolphin which is basically founded in Bhagalpur region of Bihar. In particular, substrate-breeding fish species are negatively affected by dredging and might even become locally extinct following failed breeding. As a bulk of fisheries depends on benthic (bottom-dwelling) fishes in most of India’s larger rivers, this will mean important threat to the sustainable production of fish in these systems as well.[11]

Destruction of Self-Purification of Ganga

A study done by NEERI, a government of India funded research institution shows that the river Ganga is unique in its sediment content that is more radioactive compared to any other river and lake water sediments. These sediments release Copper and Chromium and have bactericidal properties that multiply coliphages reducing and ultimately eliminating coliforms from water.[12] River activist and economist Dr. Bharat Jhunjhunwala has claimed that the dredging activities undertaken will destroy the self-purification capacity unique to the Ganga.

See also

Further reading

External links

Notes and References

  1. Web site: Cabinet approves Jal Marg Vikas Project for enhanced navigation on the Haldia-Varanasi stretch of National Waterway-1. 4 January 2018 .
  2. News: IWAI: National Waterways project to generate employment in state. The Times of India . 10 November 2016 .
  3. Web site: Nitin Gadkari inaugurates National Waterway-1, flags off trial run of two vessels . 12 August 2016 . 12 August 2016 . news . Pradesh 18 .
  4. Web site: Government to spend Rs 50,000 crore on river front development: Nitin Gadkari . 12 August 2016 . 12 August 2016 . news . The Economic Times . PTI .
  5. Web site: A Waterway from Varanasi to Kolkata? . The Times of India . 2014-06-07.
  6. Web site: Centre Plans to Develop Ganga as a Major Water Corridor, Tourism Destination . International Business Times . 2014-07-09.
  7. News: World Bank yet to decide on funding Clean Ganga . Deccan Herald . 2014-11-04 .
  8. Web site: Lessons from Farakka as we plan more barrages on Ganga . South Asia Network on Dams, Rivers and People . 2014-11-25.
  9. Web site: Inland waterways project will 'kill' the Ganga, warn activists . The Hindu . 7 August 2014.
  10. Web site: Impacts of Ganga Waterways Plan on its ecology and the people . South Asia Network on Dams, Rivers and People . 11 August 2016.
  11. Web site: Digging Our Rivers' Graves? . South Asia Network on Dams, Rivers and People . 19 February 2016.
  12. Web site: Self-preservation and self-purification differentiate Ganga from all other rivers on the planet . Arise India Forum . 2 June 2012.