Narkatiaganj–Bhikhna Thori branch line explained

Box Width:28em
Narkatiaganj–Bhikhna Thori line
Status:Operational
Linelength:36 km
Electrification:Yes
Map State:collapsed

The Narkatiaganj–Bhikhna Thori line is a rail line in eastern India that connects Narkatiaganj and Bhikhna Thori near the Indo-Nepal border.

History

Railway lines in the area were pioneered by Tirhut Railway and the Bengal and North Western Railway lines in the 19th century. In his book The Indian Empire, Its People, History and Products W.W.Hunter says, "The Tirhut State Railway with its various branches intersects Northern Behar and is intended to extend to the Nepal frontier on one side and to Assam on the other."[1]

The area was laid with metre-gauge tracks. The 2290NaN0 Samastipur–Narkatiaganj loop was developed in stages between 1875 and 1907. The Samastipur–Darbhanga line opened for famine relief in 1874 and opened to the public on 1 November 1875. The 720NaN0-long Nirmali branch (Darbhanga–Nirmali) opened between 1883 and 1886. The Sakri–Jainagar branch opened in 1905. The Jhanjharpur–Laukaha Bazar line opened in 1976.[2]

Gauge conversion

Presently services are suspended on this 36 km line since 2015, as it is undergoing gauge conversion, from metre gauge to broad gauge. It is expected that the first stretch between and (13 km) to be completed in March 2020 and by June 2020, up to (23 km). The final section between Gawnaha and Bhikhna Thori (13 km) passes through dense forest and needs a special permit from the Forest Department allowing construction works. As of August 2019, the permit has not been given.[3] According to the forest department, Gawnaha–Bhikhna Thori section should be closed and the railway land transferred to them.[4]

External links

|

Notes and References

  1. Book: The Indian Empire, Its People, History and Products . W. W. Hunter . p. 547. 2005 . Asian Educational Services . 9788120615816 . 2012-11-06 .
  2. Web site: Indian Railways line history 2. North Eastern Railway . 2012-11-06 .
  3. Web site: 2022 तक पूरा होगा रेललाइन दोहरीकरण का कार्य: सीएओ . Railway line doubling to be completed by 2022: CAO. hi. Jagran. Bettiah. 2019-08-03. 2020-01-14.
  4. Web site: बंद हो सकता है गौनाहा भिखनाठोरी रेलखंड . Gaunaha – Bhikhna Thori rail section may be closed. hi. Live Hindustan. Bagaha. 2019-04-10. 2020-01-14.