Narayanganj Commuter Explained

Narayanganj Commuter
Type:Commuter
Status:Operational
Locale:Dhaka Division, Bangladesh
Predecessor:Narayanganj Local
Operator:East Zone
Stops:7 in both directions
Distance:20km (10miles)
Journeytime:45 mins
Frequency:Daily
Trainnumber:Narayanganj Commuter-1 to 16
Speed:40km/h
Owners:Ministry of Railways
System:Bangladesh Railway
Map State:collapsed

The Narayanganj Commuter (Bengali: নারায়ণগঞ্জ কমিউটার) is a commuter train service operated by Bangladesh Railway. The service operates trains every day between the cities of Dhaka and Narayanganj in Dhaka Division, Bangladesh.

History

Bangladesh Railway long aimed to introduce a commuter train service to facilitate quicker travel for the working population of Narayanganj to and from Dhaka. Shortly after the arrival of DEMU trains from China, Prime Minister Sheikh Hasina inaugurated the Narayanganj Commuter service at Kamalapur railway station on 24 April 2013.[1] [2]

The train service was suspended on 4 December 2022 for work on the Dhaka–Jessore line and resumed on 1 August 2023 after work on the Dhaka section.[3] [4]

Service

After inauguration, the route operated two newer CRRC Tangshan DEMU rakes, each comprising six coaches,[5] alongside eight pairs of older commuter trains. However, following the phasing out of the DEMU trains, only the older meter-gauge trains remain in service.[6] [7]

The service operates 16 departures daily, with the earliest departure from at and the last departure from at .

Route

  1. Kamalapur railway station
  2. Gandaria railway station
  3. Shyampur Baraitala railway station
  4. Pagla Halt railway station
  5. Fatulla railway station
  6. Chashara railway station
  7. Narayanganj railway station

Incidents

Shortly after the inauguration of the route in 2013, frustrated passengers vandalised the new DEMU coaches due to their shortcomings.

On 24 September 2020, while traveling from Kamalapur to Narayanganj, the train was halted due to derailment of four coaches. As a result, the schedule of Narayanganj Commuter had to be adjusted that day.[8]

Notes and References

  1. News: 22 April 2013 . Dhaka-N'ganj DEMU train starts April 24 . 17 March 2024 . Dhaka Tribune.
  2. Web site: Arafat . Aditya . 18 May 2013 . ডেমু ট্রেন নিয়ে বিপাকে রেলওয়ে! . Railways in trouble with DEMU trains! . 8 August 2023 . . bn.
  3. News: ভাড়া বাড়িয়ে ৮ মাস পর ঢাকা-নারায়ণগঞ্জ রেল চলাচল শুরু. bn. Sourav. Hossain Siyam. 1 August 2023. 8 August 2023. The Daily Star.
  4. Web site: 2 Aug 2023 . Dhaka-Narayanganj train service resumes after eight months . 2024-03-16 . The Financial Express . en.
  5. Web site: 2013-04-25 . PM inaugurates first commuter train . 2024-03-16 . The Daily Star . en.
  6. Web site: নাঈম . হাসনাত . 31 Jul 2023 . ২৩৯ দিন পর নারায়ণগঞ্জের পুরনো লাইনে ট্রেন, প্রকল্পে এখনও জটিলতা . Trains on Narayanganj's old track after 239 days, complications in the project . 2024-03-16 . dhakapost.com . bn.
  7. Web site: Hossain . Anowar . 2023-05-15 . No DEMU train operative, no one takes the blame . 2024-03-16 . Prothom Alo English . en.
  8. News: নারায়ণগঞ্জে কমিউটার ট্রেন লাইনচ্যুত. bn. 24 September 2020. 8 August 2023. The Daily Star.