Nansha Port railway | |
Native Name: | 南沙港铁路 |
Status: | In operation |
Linelength: | 880NaN0 |
Electrification: | 50 Hz 25,000 V |
Speed: | 1200NaN0 |
The Nansha Port railway is a railway line in Guangdong Province, China.[1]
Construction began in 2016. During construction, this line was changed from a freight-only railway to a combined passenger and freight line.[2] It opened on 31 December 2021 for freight. railway station opened on 8 February 2022.[3] Passenger services and the passenger-only railway stations are still under construction.
The line is electrified and double-tracked, 88km (55miles) long, and will have a maximum speed of 120km/h. It leaves the existing Guangzhou–Zhuhai railway at [4] and heads east.