Southern Xinjiang railway explained

Southern Xinjiang railway
Type:Heavy rail
System: China Railway
Status:Operational
Locale:
Start:Turpan railway station
End:Kashgar railway station
Open:1984 (TurpanKorla)
1999 (KorlaKashgar)
Operator:China Railway Ürümqi Group
Linelength:1930km (1,200miles)
Tracks:2 (TurpanAksu; Double-track railway)
1 (AksuKashgar; Single-track railway)
Electrification:25 kV AC, 50 Hz (TurpanKorla)
Speed:160km/h
Minradius:8000NaN0
Elevation:2.2%

The Southern Xinjiang railway or Nanjiang railway, is a railway between Turpan and Kashgar in Xinjiang, China. The railway is 14460NaN0 in length and runs along the southern slope of the Tian Shan mountain range, connecting all major cities and towns of the Northern Tarim Basin, including Turpan, Hejing, Yanqi, Korla, Luntai (Bügür), Kuqa, Toksu (Xinhe), Aksu, Maralbexi (Bachu), Artux, and Kashgar.[1] [2]

The line joins the Lanzhou–Xinjiang railway at Turpan (connecting to Ürümqi) and the Kashgar–Hotan railway in Kashgar. It also forms the Taklimakan Desert railway loop, together with sections of the Hotan–Ruoqiang railway, Kashgar–Hotan railway, and Golmud–Korla railway.[3]

History

The Southern Xinjiang railway was built from east to west. The Turpan-Korla section in the east (457 km) was built from 1974 to 1984.[2] The western section from Korla to Kashgar (9880NaN0) was built from 1996 to 1999.[2] From Yanqi to Kashgar, the line follows National Highway 314. The Kashgar–Hotan railway, originally referred to as Phase III of the Southern Xinjiang railway, opened in 2010. From 2008 to 2013, the Korla to Aksu section, 526.90NaN0 in length, was double-tracked.[4]

In December 2014, a second double-track electrified line between Turpan and Korla opened to commercial operation.[5] This new line, called the second Turpan–Korla railway, is 3340NaN0 in length.[5] The line makes use of extensive tunneling to shorten the distance between the two cities by 1230NaN0.[5] The maximum elevation along route is lowered from 29800NaN0 to 14900NaN0, and the steepest incline is reduced from 22.7‰ to 13‰.[5] The longest tunnel along route, the Middle Tianshan Tunnel, is 22.4671NaN1 in length and one of the longest railway tunnels in China.[5]

On 1 January 2021, a branch from south of Kalpin to Tumxuk was opened to passenger service. It is 31km (19miles) long and has a design speed of 100km/h.[6]

Station list

StationChineseDistance (km)Location
Turpan
Lanzhou–Xinjiang railway
Chinese: [[:zh:吐鲁番站|吐鲁番]] 0 GaochangTurpan
Chinese: 龙盘
Chinese: 铁泉
Chinese: 珍珠泉
Chinese: 红山渠
Chinese: 托克逊 Toksun County
Chinese: 望布
Chinese: 布尔加依
Yurgou Chinese: 鱼儿沟 DabanchengÜrümqi
Chinese: 祖鲁木台 Toksun CountyTurpan
Chinese: 喀尔干特
Chinese: 夏格泽
Chinese: 星源
Chinese: 国光 Hejing CountyBayingolin Prefecture
Chinese: 阿拉沟
Chinese: 库林阿曼
Chinese: 德代沟
Chinese: 德文托盖
Chinese: 扎和萨拉
Chinese: 乌斯特
Chinese: 哈尔格
Chinese: 胜利桥
Chinese: 上新光
Chinese: 下新光
Chinese: 哈让古
Chinese: 巴伦台
Chinese: 胡斯台
Chinese: 大西沟
Chinese: 天桥南
Chinese: 莫嘎图
Hejing Chinese: 和静 369
Chinese: 八棵树
Chinese: 幸福滩
Yanqi Chinese: 焉耆 400 Yanqi County
Chinese: 包尔海
Chinese: 紫泥泉
Chinese: 塔什店 Korla
Chinese: 云崖
Chinese: [[:zh:库尔勒站|库尔勒]] 457
Chinese: 库北
Chinese: 库西
Chinese: 肖塔
Chinese: 库鲁克 Luntai County
Chinese: 野云沟
Chinese: 策达雅
Chinese: 阳霞
Chinese: 塔拉克
Luntai Chinese: 轮台
Chinese: 二八台 Kuqa CountyAksu Prefecture
Chinese: 雅克拉
Chinese: 牙哈
Kuqa Chinese: [[:zh:库车站|库车]] 740
Kuqa West
Kuqa–Ehuobulake Railway
Chinese: 库车西
Xinhe Chinese: 新和 779 Xinhe County
Chinese: 伊斯克苏
Chinese: 特尔希克
Chinese: 羊塔克库都克
Chinese: 咸水沟 Wensu County
Chinese: 喀拉玉尔滚
Chinese: 帕满
Aksu Chinese: [[:zh:阿克苏站|阿克苏]] 983 Aksu
Chinese: 三角地
Chinese: 金银川
Chinese: 柯坪 Kalpin County
Chinese: 一间房 Bachu CountyKashi Prefecture
Bachu Chinese: 巴楚 1,200
Chinese: 五道班
Chinese: 西格尔 ArtuxKizilsu Prefecture
Chinese: 八盘磨
Artux Chinese: 阿图什 1,410
Kashi
Kashgar–Hotan railway
Chinese: [[:zh:喀什站|喀什]] 1,445 KashiKashi Prefecture

Rail connections

See also

Notes and References

  1. (Chinese) "12月6日:南疆铁路全线开通运营" Accessed 2011-01-21
  2. (Chinese) "南疆铁路" Accessed 2011-01-21
  3. Web site: New railway completes 2,700km loop of Taklamakan Desert in move to integrate Xinjiang with rest of China . South China Morning Post . 17 June 2022 . Kate . Zhang .
  4. (Chinese) 南疆铁路库阿二线开通运营 全长526.9公里 2013-12-05
  5. (Chinese) 袁蕾, 吐库二线正式开通运营 南疆铁路进入电气化时代 新疆日报 2014-12-29
  6. Web site: 图木舒克铁路开通运营. 2021-01-04. new.chinaxinjiang.cn.