Nagarjuna Sagar Dam Explained

Nagarjuna Sagar Dam
Coordinates:16.5756°N 79.3117°W
Location Map:India Andhra Pradesh
Location Map Size:200px
Cost:132.32 crore rupees
Dam Crosses:Krishna River
Dam Height:124m (407feet) from the deepest river bed level
Dam Length:1550m (5,090feet)
Purpose:Hydroelectric & Irrigation
Res Name:Nagarjuna Sagar Reservoir
Res Capacity Total:11.560NaN0
(405 Tmcft)
Res Capacity Active: (244.41 Tmcft)[1]
Res Surface:285km2
Plant Operator:Andhra Pradesh Power Generation CorporationTelangana State Power Generation Corporation Limited
Plant Commission:1978–1985
Plant Turbines:1 x 110 MW Francis turbine, 7 x 100.8 MW reversible Francis turbines
Plant Capacity:816MW

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana.[2] The dam provides irrigation water to the districts of Krishna, Guntur, Palnadu, Prakasam and parts of West Godavari districts of Andhra Pradesh and also Nalgonda, Suryapet, Khammam, Bhadradri Kothagudem districts of Telangana. It is also a source of electricity generation for the national grid.[3] [4] [5]

Constructed between 1955 and 1967, the dam created a water reservoir with gross storage capacity of, its effective capacity is 6.92 cubic km or 244.41 Tmcft. The dam is tall from its deepest foundation and 1.6km (01miles) long with 26 flood gates which are 42feet wide and 45feet tall.[6] It is jointly operated by Andhra Pradesh and Telangana.[2] [7]

Nagarjuna Sagar Dam was the earliest in a series of large infrastructure projects termed as "modern temples" initiated for achieving the Green Revolution in India. It is also one of the earliest multi-purpose irrigation and hydroelectric projects in India.

History

The Nizam made the British engineers begin the survey work for this dam across the Krishna River in the year 1903.[8]

The project's construction was officially inaugurated by Prime Minister Jawaharlal Nehru on 10 December 1955 and proceeded for the next twelve years. Raja Vasireddy Ramagopala Krishna Maheswara Prasad, popularly known as the late Muktyala Raja, was instrumental in the construction of the Nagarjuna Sagar Dam through active political lobbying and the donation of one hundred and ten million GBP in 1952 and of land.[9] It was the tallest masonry dam in the world at that time, built entirely with local know-how under the engineering leadership of Kanuri Lakshmana Rao.

The reservoir water was released into the left and right bank canals by Prime Minister Indira Gandhi on 4 August 1967.[10] Construction of the hydroelectric power plant followed, with power generation increasing between 1978 and 1985 as additional units came into service. In 2015, the diamond jubilee celebrations of the project's inauguration were held, alluding to the prosperity the dam has ushered into the region.[11]

The construction of the dam submerged an ancient Buddhist settlement, Nagarjunakonda, which was the capital of the Ikshvaku dynasty in the 1st and 2nd centuries and the successors of the Satavahanas in the Eastern Deccan. Excavations yielded 30 Buddhist monasteries as well as artwork and inscriptions of historical importance. Prior to the reservoir's flooding, monuments were dug up and relocated. Some were moved to Nagarjunakonda, now an island in the middle of the reservoir. Others were moved to the nearby mainland village of Anupu.[12]

The site of the dam was selected in 2022 to be developed as part of the UDAN scheme. The selection calls for the development of a water aerodrome at the site.[13] [14]

Data

Utilisation

Irrigation

The right canal (Jawahar canal) is 203km (126miles) long with a maximum 311.5 cumecs capacity and irrigates 1.117e6acre of land in Guntur and Prakasam districts. The left canal (Lalbahadur Shastri canal) is 179km (111miles) long with maximum 311.5 cumecs capacity and irrigates 1.008e6acre of land in Nalgonda, Suryapet, Krishna, West Godavari and Khammam districts.[16] The project transformed the economy of above districts. 54 villages (48 in Nalgonda and 6 in Guntur) were submersed in water and 24,000 people were affected. The relocation of the people was completed by 2007.

Alimineti Madhava Reddy lift irrigation canal draws water from the Nagarjuna Sagar reservoir to irrigate 0.37e6acre of land in Nalgonda district.[17] This lift scheme with pump house located near Puttamgandi village on the left bank of Krishna river also supplies nearly 20 TMC water for the drinking water needs of Hyderabad city.[18] [19] Nearly 80% of the Nagarjuna Sagar water used in Hyderabad city is available for irrigation use in Nalgonda district in the form of regenerated water/treated sewage water. In addition, the high level flood flow canal drawing water from the left side shore of the reservoir also supplies irrigation water in Nalgonda district.

Power generation

The hydroelectric plant has a power generation capacity of 815.6 MW with 8 units (1x110 MW+7x100.8 MW). The first unit was commissioned on 7 March 1978 and the 8th unit on 24 December 1985. The right canal plant has a power generation capacity of 90 MW with 3 units of 30 MW each. The left canal plant has a power generation capacity of 60 MW with 2 units of 30 MW each.[20] The tail pond is under advanced stage of construction to put to use the pumped storage features of 7 x 100.8 MW units. And it will be useed for irrigation.Many times, it happens that power generation from the 150 MW canal based units is not optimised when the Nagarjunasagar reservoir is overflowing on its spillway and less water is required for irrigation from the canals during the monsoon floods. Power generation from the canal based hydro units can be optimised by running these units during the flooding period by releasing the water fully into the canals. The unwanted canal water can be released into the natural stream when it is crossing the major stream. Thus run off power can be generated from the water going down unutilised into the river by the canal based power units also.

The water level in the Nagarjunasagar reservoir shall be maintained above the minimum level required for these units in most of the time by releasing water from the upstream Srisailam reservoir to optimise the power generation from the canal based units during dry season.

Tourism

Nagarjunasagar Dam is one of the popular weekend getaways. It is 146 km away from Guntur, 184 km away from Vijayawada and 152 km away from Hyderabad. Thousands of tourists visit the dam when gates are open in monsoon season (around September / October).

Some of the nearby tourist places of interest include:

Environmental aspects

The artificial lift irrigation based diversion of the river from its natural delta area into Nalgonda district caused erosion of the fluorine-rich volcanic rocks in Nalgonda and contaminated its groundwater supply. It also caused uncertain flows of water into the Krishna River delta area and a shrinkage of the natural wonder "The Kolleru Lake".[21] The use of erosion resistant canals interfered with the natural silting process of a river to the deltas and created long-term ecological issues to the health of the delta lands. Reduced flows into the sea resulted in land salination and sea encroachment of coastal lands in Diviseema. The diversion of Krishna water for 200 km to Hyderabad resulted in massive evaporation losses especially in summer and reduced the size of Krishna River. Many forest preserves along the natural Krishna flow are now categorized as "completely degraded" forest areas. The Krishna River was once home to an ecological wonderland of freshwater fish and aquatic population that is now completely depopulated. The river stopped being navigable since the year of Nagarjuna sagar construction.

Impact on Hyderabad water security

Water planning for Hyderabad city started in 1920 with the tapping of Musi River for 15 Mgd. It progressed to tapping Esi (Himayat Sagar 1927 – 11mgd) and Manjira (1965–1993 – Majira and Singur dams) for another additional 130 Mgd. It took a huge leap during 1995–2004 with the commissioning of Krishna river water project (Phases I – III) at a total cost of over ten thousand crores to supply an additional 190Mgd to Hyderabad from Nagarjuna sagar.[22] The project incurs an additional evaporation and leakage loss of 64 Mgd. About 30% of the water naturally flowing to Krishna Delta before 1995 is now diverted to Hyderabad.

Future potential

Methods to harness huge dead storage

The reservoir dead storage water below the 125 m MSL can be fully released into the downstream river/tail pond through the existing diversion tunnel which was in use to divert the river flow during the dam construction.

Pumped storage hydro power potential

Nagarjuna Sagar reservoir, serving as low level reservoir, has potential to install nearly 2,18,000 MW high head pumped storage hydroelectric plants on its right side.

Assured water supply to Hyderabad city

At present nearly one Tmcft per month or 250 million gallons per day or 350 cusecs is supplied to the Hyderabad city from Nagarjuna Sagar (NS) reservoir.[27] The water supply is nearly 50% of the total city water requirement. This water pumping scheme is part of Alimineti Madhava Reddy lift irrigation project with its foreshore pumping station at Puttamgandi which has nearly 2400 cusecs pumping capacity.[28] The water supply to the Hyderabad city is nearly 15% of its total capacity. The approach channel from the reservoir to the Puttamgandi pump house (PH) is located at where the Bhimanapalli Vagu tributary is joining the Krishna river.[29] The minimum draw down level (MDDL) of the PH is 502feet MSL below which water can not be pumped from NS reservoir.[30] The reliability / dependability of the PH for supplying assured water supply to Hyderabad city, is not adequate due to meagre inflows into the NS reservoir in some years and the need to deplete the NS reservoir water below 502 ft MSL for other purposes. In these circumstances, adequate water is to be stored above the 502 ft MSL to maintain 100% assured water source without depending totally on NS reservoir.[31]

This is possible by constructing a balancing reservoir by separating some area of the NS reservoir with a new dam across the Bhimanapalli Vagu tributary at just upstream of the Puttamgandi PH approach channel. This new dam with FRL 590feet MSL, would not submerge any additional area other than the area already submerged by the NS reservoir. The water inflows from the Bhimanapalli Vagu tributary joining the NS reservoir are first impounded by the new dam and if found excess over flows into the downstream NS reservoir. This new balancing reservoir's live capacity is nearly 6 Tmcft above the 502 ft MDDL which is equal to six months water supply to the Hyderabad city. This reservoir would have provision to receive water from the Puttamgandi PH when inflows from the Bhimanapalli Vagu tributary is not satisfactory and water is at adequate level in NS reservoir during monsoon months. When water level of NS reservoir goes below the 502 ft MSL, water is fed to the Puttamgandi PH approach channel from the new balancing reservoir for pumping water needs of Hyderabad city. The cost of this new dam project would be nearly 1.5 billion rupees only which will provide 100% assured water supply to the Hyderabad city without depending on the water availability from NS reservoir during the non monsoon months and drought years.

Sunkishala underground pump house is under construction at an estimated cost of Rs 1450 crores for drawing water up to 462feet MSL from the dead storage.[32]

Godavari water transfer via Nagarjuna Sagar left canal to Krishna River

The Nagarjuna Sagar left canal supplies nearly 130 TMC of water for irrigation needs in Telangana and Andhra Pradesh states. This is a contour gravity canal with gradual downward gradient (≃ 1:10,000) along the water flow direction. This canal can be used for transferring nearly 80 TMC Godavari River water into the Nagarjuna Sagar reservoir in addition to supplying the Godavari water under its entire command area. Thus a total of 210 TMC of Godavari water can be used in the Krishna basin of Telangana state from Srisailam and Jurala reservoirs for the new projects with 100% water dependability. Godavari water transferred into the Nagarjuna Sagar reservoir and Krishna main river can also be used for the proposed Palamuru lift irrigation and Nakkalagandi lift irrigation schemes in Telangana.

This is possible by re-engineering of the left canal to reverse its water flow direction from the location (near) where Godavari water would be pumped into this canal. The canal embankments would be raised to facilitate flow reversing towards Nagarjuna Sagar reservoir and intermediate pumping stations (with low head & high flow concrete volute pumps) would be installed near the Paleru balancing reservoir, Pedda Devulapalli balancing reservoir, left canal head regulator on the rim of Nagarjuna Sagar reservoir and the existing major aqueducts across Halia, Musi and Munneru tributaries. The cost of this canal redesigning and the associated pump houses would be one third of a new scheme to transfer Godavari River water into Nagarjuna Sagar reservoir at its FRL 590feet MSL with least possible total pumping head.[33] The above re-engineering of the canal is similar to modifications carried out to reverse the water flow of ancient Grand Canal under Eastern Route project of South to North Water Transfer in China.[34]

See also

External links

Notes and References

  1. Web site: India: National Register of Large Dams 2009. Central Water Commission. 7 August 2011. https://web.archive.org/web/20110721165130/http://www.cwc.nic.in/main/downloads/National%20Register%20of%20Large%20Dams%202009.pdf. 21 July 2011. dead.
  2. News: AP, Telangana jointly release water from Nagarjuna Sagar dam . Lasania . Yunus Y. . 11 August 2019 . 16 September 2020.
  3. Book: Everard, Mark . 2013-08-08 . Bloomsbury Publishing . 978-1-78032-542-2 . 22 . en.
  4. Book: Sankararao, N. . Archers & Elevators Publishing House . 978-81-950384-6-6 . 33 . en.
  5. News: 2018-11-20 . Palnadu lift irrigation scheme back in spotlight . en-IN . The Hindu . 2023-05-29 . 0971-751X.
  6. Web site: Nagarjunasagar. 2007-01-25. https://web.archive.org/web/20070124174958/http://www.tourisminap.com/nagarjunasagar.htm . 2007-01-24.
  7. News: All gates of Nagarjunasagar lifted . B. . Pradeep . . 12 August 2019 . 16 September 2020.
  8. Web site: The Secret History of Hyderabad State of the Nizam (South India; 1724–1948). Hamad. Subani. 28 June 2016. Cabal Times.
  9. Web site: India. The Hans. 2018-03-10. Jaggaiahpet ex-MLA dies. 2021-07-19. www.thehansindia.com. en.
  10. News: Magazine / Focus : Taming the Krishna. The Hindu. 18 December 2005.
  11. Web site: Nagarjuna Sagar dam completed 60 years. 11 December 2015. 12 December 2015. https://web.archive.org/web/20151212203047/http://www.ap7am.com/lv-207199-special-focus-nagarjuna-sagar-dam-completes-60-years.html. dead.
  12. Web site: Nagarjunakonda. 2007-01-25.
  13. Web site: Telangana State, Andhra Pradesh to have water aerodromes soon . 16 June 2021 .
  14. News: Aerodrome at Sagar in UDAN plan: VK Singh . The Times of India . 4 April 2023 .
  15. Web site: Nagarjunasagar dam loses 25 per cent storage. 28 June 2018. 2018-06-18.
  16. Web site: Nagarjuna Sagar project. 22 September 2015.
  17. Web site: Aliminati Madhava Reddy Project (AMRP). 22 September 2015.
  18. News: Expert suggests for full use of Puttamgandi pump house for Dindi project. 22 April 2016. The Hindu. 2016-03-26. Reddy. T. Karnakar.
  19. News: Pumping station proposal in doldrums over funding delay. . 11 August 2013 . 22 September 2015.
  20. http://www.apgenco.com/inner.asp?frm=our_pow_plants_hydel1 Andhra Pradesh Hydel Power plants
  21. News: Worries grow as Kolleru shrinks . The Hindu. The Hindu. 13 February 2016 . Srinivas . Rajulapudi .
  22. Book: Provisioning of Drinking water to Hyderabad. JNU University Press. 155.
  23. Web site: Technical data of Nagarjunasagar dam. 22 September 2015.
  24. Web site: Nagarjuna Sagar WPP Units | Hydroelectricity (2.0K views). Scribd.
  25. Web site: Variable Speed Is Key To World's Biggest Pumped Hydro Energy Storage Project, China's Fengning Plant. 4 July 2018 . 28 August 2020.
  26. Web site: Converting to full – power. 22 December 2016. 25 December 2016. https://web.archive.org/web/20161225213957/http://www.powertoday.in//News/Converting-to-Full-Power/103795#sthash.5xGWgcUC.dpbs. dead.
  27. Web site: Water to be Pumped From Dead Storage Level. https://web.archive.org/web/20160428134456/http://www.newindianexpress.com/cities/hyderabad/Water-to-be-Pumped-From-Dead-Storage-Level/2016/04/27/article3402248.ece. dead. 28 April 2016. 22 April 2016.
  28. News: Alimineti Project Fourth Pump Commissioned. 22 September 2015. Business Standard India. 2003-03-16. Bureau. Our Regional.
  29. Web site: Krishna Middle Sub-Basin map. 22 April 2016. 8 August 2016. https://web.archive.org/web/20160808232905/http://www.india-wris.nrsc.gov.in/Publications/WatershedSubbasinAtlas/4.%20Krishna%20Middle.pdf. dead.
  30. News: AP, Telangana staring at severe water crisis. . 28 April 2016 . 29 April 2016.
  31. News: Water level in Prakasam Barrage head pond dips to half. 29 April 2016. The Hindu. 2016-04-25. Rao. G. Venkataramana.
  32. Web site: Rs 725 crore for Sunkishala project to end Hyderabad's water woes. 22 April 2022.
  33. Web site: Jyothi Rao Pule Dummugudem Nagarjunasagar Sujala Sravanthi Project. 19 July 2015.
  34. Web site: Eastern Route project of South to North Water Transfer in China . 19 July 2015 . 28 June 2015 . https://web.archive.org/web/20150628203217/http://www.nsbd.gov.cn/zx/english/erp.htm . dead .