Nadym River Bridge Explained

Nadym River Bridge
Native Name:Мост через Надым
Native Name Lang:RU
Carries:combined (Trains, Motor vehicles)
Crosses:Nadym
Location:Nadym, Yamalo-Nenets Autonomous Okrug, Tyumen Oblast
Length:1334 m
Mainspan:110 m
Open:2015

The Nadym River Bridge is a combined single-level bridge that was opened on September 11, 2015. It is located simultaneously on the SurgutSalekhard highway and on the SalekhardNadym – Korotchaevo railway line. It is an element of the Northern Latitudinal Railway project, designed to link the Arctic region with the central areas of Russia and the Urals.

The total length of the passage is 3.1 km, including the bridge (1334 m) and access areas (1770 m). The length of the superstructure is 110 m. The construction started in 2011, and the road crossing was opened in 2015. The construction of the railway part of the bridge was postponed.[1]

The construction companies that participated in the erection of the bridge are OJSC Mostostroy-11, CJSC Kurganstalmost, and Llc Urengoydorstroy.[2]

Notes and References

  1. Web site: Строительство железнодорожной части моста через Надым «отложено в пользу шведов».
  2. Web site: Кобылкин в компании трех губернаторов и полпреда открыл мост через Надым. Не обошлось без новых российских трендов..