NER Class Z explained

NER Class Z
LNER Class C7
Powertype:Steam
Designer:Vincent Raven
Builder:North British Locomotive Co.
Builddate:1911–1918
Totalproduction:50
Whytetype:4-4-2
Leadingdiameter:3feet
Driverdiameter:6feet
Trailingdiameter:43NaN3
Tenderdiameter:3feet
Wheelbase:53feet
Engine Total:29feet
Tender Total:12feet
Axleload:NaNt
Locoweight:NaNt
Tenderweight:NaNt
Locotenderweight:NaNt
Fueltype:Coal
Firearea:27square feet
Diameterinside:5feet
Tubearea:763.9 sq.ft.
Smalltubediameter:90 x 2 in
Fluearea:534.5 sq.ft.
Largetubediameter:24 x 5.25 in
Fireboxarea:185 sq.ft.
Superheaterarea:392 sq.ft. (24 x 1.1 in)
Cylindercount:3
Operatorclass:NER Z, LNER C7
Withdrawndate:1943–1948
Disposition:Two rebuilt into Class C9 (see below), remainder scrapped
LNER Class C9
Powertype:Steam
Designer:Nigel Gresley
Rebuilddate:1931
Numberrebuilt:2
Whytetype:4-4-2
Leadingdiameter:3feet
Coupleddiameter:6feet
Trailingdiameter:3feet
Tenderdiameter:3feet
Wheelbase:55feet
Axleload:NaNt
Locotenderweight:NaNt
Fueltype:Coal
Firearea:NaN3NaN3
Diameterinside:5feet
Tubearea:1,178.4 sq.ft.
Smalltubediameter:143 x 2 in
Fluearea:519.2 sq.ft.
Largetubediameter:24 x 5.25 in
Fireboxarea:203 sq.ft.
Superheaterarea:417 sq.ft. (24 x 1.2 in)
Cylindercount:3
Valvegear:Stephenson
Operator:London and North Eastern Railway
Operatorclass:C9
Numinclass:2
Fleetnumbers:727, 2171
Withdrawndate:1942–1943
Disposition:Both scrapped

The NER Class Z (LNER Class C7) was an Atlantic class of locomotives designed by Vincent Raven. It was introduced in 1911.

Construction and early life

Vincent Raven had been appointed Chief Mechanical Engineer of the North Eastern Railway (NER) in June 1910. His predecessor, Wilson Worsdell, had introduced three-cylinder simple-expansion locomotives to the NER with the Class X 4-8-0T, ten of which were built in 1909–10 for heavy shunting. One of Raven's first designs was another three-cylinder locomotive, the Class Y 4-6-2T, twenty of which were built in 1910–11 for hauling coal trains from collieries to ports. The success of these two designs convinced Raven to design a three-cylinder locomotive to haul express passenger trains. Worsdell's two-cylinder Class V 4-4-2 were handling the principal East Coast expresses, and Raven combined the 4-4-2 wheel arrangement with three cylinders to produce his new design. The coupled wheels were of 6foot diameter with a coupled wheelbase of 7foot within a total locomotive wheelbase of 29foot. The three cylinders measured NaNinches bore by 26inches stroke driving the leading coupled axle, fed by piston valves which were themselves operated by Stephenson's link motion. The cylinders and their valve chests were made as a single casting.

Originally classified NER Class V2, the first 20 were built in 1911 by the North British Locomotive Company. This was the first time since the 1880s that the NER had used a private contractor, and was necessary because Gateshead works had stopped building new locomotives in 1910 and Darlington Works was fully booked. Ten of these locomotives were saturated and the others were superheated. The classification V2 was soon amended, with the saturated locomotives becoming Class Z, and the superheated locomotives Z1. A further thirty of Class Z1 were built at Darlington Works in 1914–18, and in June 1914, Class Z1 was redesignated Class Z.

At the end of 1920, the fifty locomotives were based at principal main-line depots: there were 21 at Gateshead, fourteen at York, seven at Tweedmouth, five at Heaton, and three at Leeds (Neville Hill). By the 1923 Grouping, four were at Haymarket (Edinburgh). At these depots they shared duties with the other NER Atlantics, classes V and 4CC: these included the principal expresses on the East Coast Main Line: York–Newcastle and Newcastle–Edinburgh, together with the through services from Liverpool (Lime Street) to Newcastle, which were hauled by a locomotive of the London and North Western Railway between Leeds and Liverpool.

All fifty passed to the London and North Eastern Railway (LNER) at the 1923 Grouping, they retained their NER numbers but were now known as LNER Class C7. To begin with, they continued on the same duties, but in 1924–25, the LNER took delivery of forty Class A1 4-6-2, of which ten were allocated to Gateshead and five each to Haymarket and Heaton. At these depots they took over some of the duties previously handled by the ex-NER Atlantics, for which other duties were found, resulting in a certain amount of reallocation: in December 1929, there were nineteen C7s at York, sixteen at Gateshead, seven at Heaton, five at Tweedmouth and three at Haymarket. More 4-6-2s (of classes A3 and A4) were built between 1930 and 1938 bringing about further changes in allocation – the September 1939 allocation of Class C7 was 26 at York, ten at Gateshead, four at Heaton, three each at Neville Hill and Tweedmouth, and one each at Haymarket and St Margaret's (Edinburgh); the two C9s were at Tweedmouth.

Variations

From the very start the class was used for comparative trials and experiments.

Superheaters

When the first twenty locomotives were ordered, the benefits of superheated steam were still being evaluated. Accordingly, the new class was used for a direct comparison – ten worked with saturated steam, whilst the boilers of the remaining ten were equipped with Schmidt superheaters. Other differences between the two groups included the cylinder bore and boiler pressure – these were NaNinches and 175lbf/in2 respectively for the saturated locomotives, NaNinches and 160lbf/in2 for the superheated. It did not take long for the advantages of superheating to become apparent, including a saving in fuel. Therefore, when further locomotives were ordered, they also had Schmidt superheaters; duting 1914–15, the first ten were converted similarly. However, the cylinder bore and boiler pressure of the superheated locomotives were altered to match those of the first ten. As the original boilers wore out, replacements were constructed; those made from 1931 used Robinson superheaters instead of Schmidt ones.

Uniflow cylinders

Feedwater heaters

Normally, a locomotive boiler is fed with cold water from the tender or tank and must be heated from ambient temperature to its boiling point in order to make steam. When the steam has been used in the cylinders, it is exhausted through the chimney, and the heat that it contains is lost. Some engineers had tried different systems for extracting heat from the exhaust steam in order to pre-heat the boiler feedwater, and so use less fuel in the firebox.

The Dabeg feedwater heater was tried out by the LNER on two locomotives in the 1920s, and C7 no. 2163 was one of those selected for fitment (the other being Class O2 no. 3500). A heat exchanger was mounted on the left-hand side of the locomotive above the footplate, through which exhaust steam was passed. A pump driven from the rear coupled wheel pumped cold water from the tender through the heat exchanger and a grease separator before being forced into the boiler. The equipment was fitted to no. 2163 in 1928 and removed in 1937.

The A.C.F.I. system was French, and the LNER made more extensive use of it – several Class B12 locomotives were given this equipment, as were two Class C7, nos. 728 and 2206. The equipment was fitted to these in 1928, and although the trial officially ended in 1937, the equipment was not removed from the two Class C7 until 1941–42.

Boosters

In early 1931, Gresley rebuilt Nos. 727 and 2171 (which were entering Darlington for repairs) with an articulated booster bogie, thus making them technically 4-4-4-4s. However the articulated bogie was considered split between the loco and tender to simplify classification. Originally the booster gearing was 1.5:1, but the trials on C1 No. 4419 (also having boosters) showed that the booster's help was practically nonexistent above, meaning that they were useless for expresses, which needed a speed of at least .

After this, Darlington recommended that the booster gearing be changed to 1:1. This required larger cylinders to supply the same tractive effort, which required the boiler to operate at (higher than the C7s, which were). There were some concerns about engaging the booster at higher speeds, however the unitary 1:1 gearing was considered to make this easier. The boilers were "Diagram 100" boilers (the ones used on the B17s), and followed Doncaster practices, rather than Darlington practices (which was used on the standard C7s). They also had Robinson superheaters, rather than Schmidt ones.

The growing amount of Gresley A1s, A3s and A4s made the experiment redundant (seeing the A4s were scheduled to climb Cockburnspath hauling a 312 tons load at an average speed of).

Lentz valves

In 1933, Gresley rebuilt no. 732 with new cylinders of the same type as used on Class D49/2. These measured 17inch26inch and had poppet valves actuated by Lentz rotary cam valve gear, which provided five different cut-off settings for forward running, and two for reverse. The modifications required a new crank axle and new bogie having smaller wheels, which was mounted further forwards. This locomotive also had other modifications, and was designated Class C7/2, the unmodified locomotives being reclassified C7/1. In 1934, no. 2212 (the former Uniflow locomotive) was similarly modified, except that the valve gear allowed seven different settings for forward running, and two for reverse. However, rebuilding took some time, and No. 2212 did not return to service until January 1936.[1]

Withdrawal

Withdrawal of the C7

By the late 1930s, the new V2s were taking away the duties of the C7s. Had World War 2 not intervened, withdrawal would have started before 1940. However withdrawal was pushed back, only starting in August 1943. Withdrawal was quick, however, with only 14 surviving to nationalization. Within a year, British Railways withdrew the remaining C7s, with none surviving into preservation.

Withdrawal of the C9

Their boilers were considered non-standard (compared to the C7s), thus they were withdrawn and scrapped in April 1942 (2171) and January 1943 (727), before the first standard C7 was withdrawn.

Loco details

List of NER Class Z locomotives [2]
NER/LNER 1924 number LNER 1946 number BR number Built date Withdrawal date Notes
706 (2950) 07/1911 12/1946
709 (2951) 07/1911 03/1946
710 (2952) 07/1911 02/1944
714 (2953) 07/1911 01/1944
716 2954 (62954) 07/1911 26/06/1948
717 (2955) 08/1911 04/1944
718 2956 08/1911 06/1946
719 (2957) 08/1911 04/1944
720 2958 08/1911 08/11/1947
721 (2959) 09/1911 02/1944
722 2960 08/1911 03/1947
727 09/1911 01/1943 Rebuilt as C9 in 11/1931
728 (2961) 09/1911 11/1945
729 (2962) 09/1911 11/1945
732 2963 10/1911 12/1946 Rebuilt with Lentz rotary cams-operated valve gear in December 1933
733 (2964) 10/1911 08/1945
734 (2965) 10/1911 09/1944
735 (2966) 10/1911 06/1945
736 (2967) 11/1911 04/1946
737 (2968) 12/191112/1945
2163 (2969) 05/1914 01/1946
2164 2970 (62970) 05/1914 27/12/1948 Last withdrawn C7
2165 2971 06/1914 02/1947
2166 2972 (62972) 06/1914 30/08/1948
2167 2973 (62973) 06/1914 26/06/1948
2168 2974 06/1914 05/1947
2169 2975 (62975) 06/1914 10/07/1948
2170 (2976) 06/1914 08/1943 First C7 withdrawn
2171 07/1914 04/1942 Rebuilt as C9 in 12/1931
2172 (2977) 08/1914 12/1944
2193 2978 (62978) 12/1914 30/08/1948
2194 (2979) 12/1914 09/1944
2195 2980 12/1914 06/1947
2196 2981 (62981) 02/1915 10/07/1948
2197 2982 (62982) 02/1915 24/07/1948
2198 2983 (62983) 03/1915 24/07/1948
2199 (2984) 03/1915 06/1944
2200 (2985) 03/1915 04/1946
2201 2986 04/1915 09/1947
2202 (2987) 05/1915 10/1943
2203 2988 (62988) 06/1915 24/07/1948
2204 2989 (62988) 06/1915 30/08/1948
2205 (2990) 11/1916 02/1945
2206 2991 11/1916 08/11/1947
2207 2992 (62992) 01/1917 01/11/1948
2208 2993 (62993) 02/1917 05/03/1948
2209 (2994) 04/1917 02/1944
2210 2995 (62995) 05/1917 10/07/1948
2211 2996 06/1917 08/11/1917
2212 (2997) 06/1918 10/1945 Fitted with Uniflow cylinders as built; rebuilt with standard cylinders and Lentz rotary cam-operated valve gear in 1934, returned to service in January 1936
Numbers in parentheses were allocated but not applied.

See also

References

. E.L. Ahrons . The British Steam Railway Locomotive 1825-1925 . 1987 . 1927 . Bracken Books . London . 1-85170-103-6 .

. Ken Hoole . Locomotive Stock of the North Eastern Railway as at 31st December 1920 . 1997 . 1961 . North Eastern Railway Association . Manchester . 1-873513-19-4 .

Further reading

. Cecil J. Allen . The North Eastern Railway . 1974 . 1964 . . Shepperton . 0-7110-0495-1 . 200–1 .

. O. S. Nock . Locomotives of the North Eastern Railway . 1974 . 1954 . . Shepperton . 0-7110-0493-5 . 136–9 .

. O. S. Nock . British Locomotives of the 20th Century: Volume 1 1900-1930 . 1983 . Book Club Associates . London . CN5096 . 91–93 .

External links

Notes and References

  1. Web site: The Raven C7 (NER Class Z) 4-4-2 Atlantics . LNER Encyclopedia .
  2. Web site: NER/LNER Raven "C7" Class 4-4-2 . BRDatabase .