N713 (Bangladesh) Explained

Country:BGD
Type:N
Bangladesh National Highway 713
Kushtia City Bypass Road
Kushtia Bypass Road
Length Km:6.6
Length Ref:[1]
Direction A:North
Terminus A: (Bypass head turn)
Direction B:South
Terminus B: (Bottoil Turn)
Next Type:N
Previous Type:N
Previous Route:712
Next Route:714
Route:713
Map Custom:yes
Photo Notes:The name of the place is Bypass Gol Chatwar, the left-right side road is R745 (Bangladesh)
Translation:জাতীয় মহাসড়ক মহাসড়ক ৭১৩
কুষ্টিয়া শহর বাইপাস সড়ক
কুষ্টিয়া বাইপাস সড়ক

Kushtia City Bypass Road or N713 (Bangladesh) is a national highway and bypass road located next to Kushtia city.[2] Construction of the road began in 2016 and was inaugurated in 2018.[3]

Background

The process of construction of this bypass road started in 2005 but got stopped due to bureaucratic and land acquisition complications. In the 2007-2008 fiscal year, work resumed and stopped again. Later in 2016, the construction of the road started from January 28. 6.6 km long, 7.3 meter wide two-lane road has been constructed at a total cost of Tk 120 crore. A PC girder bridge, an underpass and 21 culverts have been constructed on this road.[4] The then Prime Minister of Bangladesh Sheikh Hasina inaugurated this road on November 31, 2018.

Notes and References

  1. Web site: RHD Total Road List_22-07-2020.pdf. 2024-07-11.
  2. Web site: RHD, Kushtia at a glance. 2024-07-29. Bangladesh National Portal - RHD, Kushtia.
  3. News: District representative . 2018-11-01 . Inauguration of Kushtia Bypass Road . 2024-07-29 . Barta 24.
  4. News: Kushtia bypass road is opening, the situation will change. Kushtia representative. 2018-09-15. Jago News 24.com. 2024-07-29.