Murcia tram explained

Murcia tram
Imagesize2:300px
Native Name:Tranvía de Murcia
Owner:Tranvimur
Locale:Murcia, Spain
Transit Type:Light rail
Lines:2
Stations:28
Annual Ridership:5 million[1]
Began Operation:28 May 2011[2]
Vehicles:11
System Length:17.51NaN1

The Murcia tram is a tram/light rail system operational in the Spanish city of Murcia. The 17.51NaN1 system opened in 2011 and links the city centre with the northern suburbs.

Background

In April 2007 a 2.21NaN1 demonstration line was opened, built by the Tranvimur joint venture of Acciona and Grupo Cívica, along Avenida Juan Carlos I. The trail was deemed successful in August 2008 and the rest of the system was built after a tendering process, which awarded a contract to Sociedad Concesionaria Tranvía de Murcia, a consortium of the companies COMSA EMTE Concesiones and FCC.[3] The contract provided for the construction of the current system and operation of the system for a duration of 40 years at a price of 264 million Euros. The current system opened in 2011.[4]

Line 1

Line 1 is the principle line of the system and includes 24 of the system's 28 stations. The line starts in the north-west of the city with a three kilometer single direction loop around the campus of the University of Murcia and goes down Avenida Jan Carlos I towards the city centre where it goes through the Plaza Circular. The tram then travels northward along Avenida Don Juan de Borbón, before branching off toward the Estadio Nueva Condomina, where it terminates. The line totals 14.5 kilometers.

Line 1B

Line 1B is a three kilometer branch line which connects with line 1 at the Los Rectores-Tierra Natura station. The line travels has five stops and terminates at UCAM-Los Jerónimos station adjacent to the Universidad Católica San Antonio de Murcia.[5]

Rolling Stock

The system uses a total of 11 Alstom Citadis 302 units. The units were originally purchased by Madrid for use in the Metro Ligero system. Two of the units were used during the pilot line, and the remaining nine were acquired by the construction consortium. The maintenance yard and depot is located directly adjacent to the La Ladera station.

Notes and References

  1. http://www.tranviademurcia.es/historia Historia. tranviademurcia.es
  2. News: . 21 June 2011 . New Murcia Tramway opened . Vía Libre - Spanish Railway News . Fundación de los Ferrocarriles Españoles (FFE) . 2018-03-18.
  3. Web site: New Murcia Tramway opened. www.spanishrailwaysnews.com. 2019-06-25.
  4. Web site: Murcia tram line 1 inaugurated. Railway Gazette International. 7 June 2011.
  5. Web site: Murcia Tram Line 1. Railway Technology. en-GB. 2019-06-25.