Murcia–Almería high-speed rail line explained

Box Width:250px
Murcia–Almería high-speed rail line
Type:High-speed rail
Status:Under construction
Locale:Spain (Region of Murcia, Andalucia)
Start:Murcia del Carmen
End:Almería
Open:2026[1]
Owner:Adif
Operator:Renfe Operadora
Linelength:184km (114miles)
Tracks:Triple track
Gauge:2 tracks, 1 track
Electrification:[2]
Speed:max 300km/h

The Murcia–Almería high-speed rail line is an under-construction railway in the Region of Murcia and Andalusia in Spain.

History

Murcia and Almería were once linked by rail from Lorca to Guadix via Baza, however this line closed in 1985. When the AVE high speed rail network opened in 1992, it continued to expand, with the Madrid–Levante high-speed rail network reaching Alicante railway station in 2013, and Murcia del Carmen railway station in 2022.[3] A continuation from Murcia to Almería railway station was proposed, and construction of the new high-speed line began in 2010,[4] but was suspended due to political disagreements. In 2017 the Spanish government announced that work would restart in 2019, to be completed by 2023. The railway's estimated completion date has since been pushed to 2026.[5]

Route

The line will serve as a continuation of the Madrid–Levante high-speed rail network at Murcia, serving stations at Lorca and Vera before terminating in Almería. It will include two standard-gauge high-speed tracks for passenger trains with a maximum speed of 300km/h and a parallel 1668 mm Iberian gauge track for freight. The trip from Murcia to Almería is expected to take 1 hour 5 minutes,[6] and 3.5 hours to Madrid, compared to the current six hours taken using the existing Linares Baeza–Almería railway.

Notes and References

  1. Web site: El Gobierno anuncia que reanudará las obras del AVE Almería-Murcia en 2019 y las acabará en 2023. El Mundo. 3 April 2017. 5 April 2020. Spanish.
  2. Web site: Adif - Almería - Murcia line. www.adifaltavelocidad.es. 4 April 2020.
  3. Web site: El AVE Madrid-Murcia comenzará el servicio comercial el próximo 20 de diciembre . 12 December 2022. 24 October 2023 . Renfe.
  4. Web site: 20 rail projects to watch in 2020. International Railway Journal. 8 January 2020. 4 April 2020.
  5. News: Excavation of Murcia-Almeria high-speed AVE train tunnel gets underway . 30 December 2022 . Murcia Today . 24 August 2022.
  6. Web site: ¿Cuándo llegará el AVE a Almería?. Diario de Almería. 16 November 2018. 5 April 2020.