Chhatrapati Shivaji Maharaj International Airport Explained

Chhatrapati Shivaji Maharaj International Airport
Image2-Width:300px
Iata:BOM
Icao:VABB
Type:Public
Owner:Airports Authority of India[1]
Operator:Mumbai International Airport Limited (MIAL)
City-Served:Mumbai Metropolitan Region
Location:Mumbai, Maharashtra, India
Elevation-F:37
Elevation-M:11
Metric-Elev:yes
Coordinates:19.0886°N 72.8681°W
Pushpin Map:India Mumbai#Maharashtra#India
Pushpin Map Caption:Location in India
Pushpin Label:BOM
R1-Number:14/32
R1-Length-F:9,596
R1-Length-M:2,925
R1-Surface:Asphalt
Metric-Rwy:y
Stat1-Header:Passengers
Stat1-Data:52,820,754 (20.2%)
Stat-Year:April 2023 – March 2024
R2-Number:09/27
R2-Length-F:11,302
R2-Length-M:3,445
R2-Surface:Asphalt
Stat2-Header:Aircraft movements
Stat2-Data:324,986 (11.9%)
Stat3-Header:Cargo tonnage
Stat3-Data:822,963 (5.9%)
Footnotes:Source: AAI[2] [3] [4]

Chhatrapati Shivaji Maharaj International Airport is an international airport serving Mumbai and the Mumbai Metropolitan Region (MMR). It is the second busiest airport in India in terms of total and international passenger traffic after Delhi, and was the ninth busiest airport in Asia and 25th busiest airport in the world by passenger traffic in fiscal year 2023–24.[5]

The airport is operated by Mumbai International Airport Limited (MIAL), a Joint Venture between Adani Enterprises, a subsidiary of the Adani Group and Airports Authority of India.[6]

A dedicated six lane, elevated road connecting the new terminal with the main arterial Western Express Highway[7] was also opened to the public the same day.[8] The airport offers nonstop or connecting flights to all six inhabited continents.

The airport is named after Shivaji (1630–1680), 17th-century Chhatrapati of the Maratha Empire. It was renamed in 1999 from the previous "Sahar Airport" to "Chhatrapati Shivaji International Airport" (the title "Maharaj" was inserted on 30 August 2018[9]). It is situated across the suburbs of Santacruz and Sahar Village in Vile Parle East.

History

RAF Santacruz was constructed in the 1930s.[10] It was a bigger airfield than nearby Juhu Aerodrome and was home to several RAF squadrons during World War II from 1942 to 1947.[11] The Airport covered an area of about and initially had three runways.[12] The apron existed on the south side of runway 09/27, and the area, referred to today as the "Old Airport", houses, among others, maintenance hangars of Air India, Air Works India, Indamer Aviation Pvt Ltd, and MIAL's General Aviation Terminal.

By 1946, when the RAF began the process of handing over the airfield to the Director General of Civil Aviation for Civil operations,[13] two old abandoned hangars of the Royal Air Force had been converted into a terminal for passenger traffic. One hangar was used as a domestic terminal and the other for international traffic. It had counters for customs and immigration checks on either side and a lounge in the center. Air India handled its passengers in its own terminal adjoining the two hangars.[12] In its first year, it handled six civilian services a day.

Traffic at the airport increased after Karachi was partitioned to Pakistan and as many as 40 daily domestic and foreign services operated by 1949, prompting the Indian Government to develop the airport, equipping the airport with a night landing system comprising a Radio range and a modernised flare path lighting system.[14] Construction of a new passenger terminal and apron began in 1950 and was commissioned in 1958.[12] Named after the neighbourhood in which it stood and initially under the aegis of the Public Works Department, the new airport was subsequently run by the Ministry of Civil Aviation.

With the dawning of the jumbo jet era in the 1970s, Santacruz, despite several extensions, began suffering from insufficient operational capacity.The Santacruz terminal was designed to accommodate 600 passengers at any given time, but by the late 1970s, it was handling 1,200. In 1979–80, 5 million domestic and international passengers flew into and out of Santa Cruz compared with 3 million at Delhi's Palam Airport. The airlines were constantly expanding their services but there was no corresponding increase in space at the terminal, making it the most congested airport in the country. In one of its issues, Time magazine, referring to the chaos, called the terminal building a "black hole".[15] A major fire gutted the International section of the terminal building on 21 September 1979, killing three passengers and shutting down the airport. A temporary departure extension or "Gulf Terminal" was made functional in October that year until the terminal was repaired.[16]

The Tata committee, set up in 1967 to examine the issues concerning the airport, had recommended the construction of a new international terminal to meet the requirements of traffic in the seventies. The Santa Cruz terminal was to be used for domestic traffic alone. The International Airport Authority of India (IAAI), which was set up in 1972, started planning the construction of a new terminal building for handling international passenger traffic, to be completed by 1981. Accordingly, construction of the new international terminal at Sahar to the northeast of Santacruz in Vile Parle was taken up at an estimated cost of 110 million.Construction of the new international terminal at Sahar began in November 1977, and the first phase took three years to build. Sahar Terminal 2A, the first phase of the two-part terminal, was opened on 5 December 1980.[15]

AAI had been considering the modernisation of Bombay Airport in 1996 although the AAI board approved a modernisation proposal only in 2003. By then, Bombay and Delhi Airports were handling 38% of the country's aircraft movement and generating one-third of all revenues earned by AAI. At that time, the Bombay airport handled 13.3 million passengers, 60% of which were domestic travellers. The airport faced severe congestion for both aircraft and passengers as it was handling twice as many aircraft movements per day than it was originally designed for. The bidding process for its modernisation eventually began in May 2004 with the decision by the Empowered Group of Ministers (EGoM) was announced in January 2006.[17] In November 2006, Delta Air Lines inaugurated a direct flight from Mumbai to New York.[18] [19]

Passenger and Air traffic

Its passenger traffic was about 49.8 million in year 2018. It is also the second busiest airport in terms of cargo traffic. In March 2017, the airport surpassed London's Gatwick Airport as the world's busiest to operate a single runway at a time. This was later surpassed again by Gatwick Airport at the end of 2019 due to passenger numbers falling at Mumbai.[20]

It handled a record of 1,007 aircraft movements on 9 December 2018, higher than its earlier record of 1,003 flight movements in a day in June 2018. It handled a record of 51 movements in one hour on 16 September 2014.[21] In financial year 2020, the Mumbai Airport handled 45.87 million passengers, only second to IGI's 67.3 million in India.[22] In financial year 2023–24, the airport handled the highest ever passengers in its history of 52.8 million passengers, surpassing its maximum capacity of 50 million passengers per year, and second only to IGI's 73.6 million in India.[2]

Ownership

A consortium of GVK Industries, Airports Company South Africa, and Bidvest,[23] won the bid to run the Mumbai Airport. To accomplish this task, Mumbai International Airport Private Limited (MIAL), a joint venture between the consortium (74%) and the Airports Authority of India (26%) was formed.[24] Since then, MIAL has made several improvements in the aesthetics, design and passenger conveniences at CSMIA including the refurbishment of domestic terminals 1A & 1B, international terminals 2B & 2C, and the opening of a brand new domestic terminal 1C and new Terminal T2. MIAL also undertook airside improvement projects such as the commissioning of new taxiways, aprons and the reconstruction of the two runways.[25] In February 2008, MIAL entered into an agreement with Air Transport IT specialist SITA that led to CSIA becoming the first airport in India to Implement Common-use self-service Kiosks and CUTE (Common Use Terminal Equipment) check-in systems.[26]

In February 2021, the Adani Group, through its subsidiary, Adani Enterprises acquired both GVK and Bidvest's stakes in MIAL, giving it a controlling interest of 74% in the venture.[27] [28]

Structure

Runways

The airport has two intersecting runways and handles an average of 980 flights per day.[29] The runways were upgraded to Code F, which means they can accommodate larger aircraft like the Airbus A380.[29] [30] Following a presentation in March 2011 by UK's air traffic service provider NATS[31] on how the capacity of the airport can be increased, MIAL set a target of 48 aircraft movements an hour in an effort to reduce congestion at the airport. Both runways were operated simultaneously especially during peak hours to try and attain this target.[32] MIAL scrapped simultaneous Cross-runway flight operations in mid-2013 after it found that single runway operations were more effective for increasing aircraft movements per hour. Runway 14/32 was henceforth to be used only when the main runway was unavailable due to maintenance or other reasons.[33] The construction of new rapid exit taxiways helped in increasing flight handling capacity from 32 movements per hour to 44 in 2012.[34] NATS delivered and helped MIAL implement a 'change roadmap' to help CSMIA achieve more than 50 movements per hour in 2015.[31] The increased air-side efficiencies resulted in CSMIA overtaking Gatwick Airport in March 2017 to become the world's busiest airport with only one operational runway at a time.[20]

NumberLengthWidthILSNotes
09–273445abbr=onNaNabbr=on60m (200feet)Cat. II (27); Cat. I (09)[35]
14–322925m (9,596feet)45m (148feet)Cat. I (both directions)

Runway notes

Once the longest commercial runway in India, Runway 09/27 is the airport's main runway. 13 taxiways, including four rapid exit taxiways, connect it to a full-length parallel taxiway to its north. It intersects the secondary runway south of the terminal buildings. The reconstruction of the runway started in September 2010[35] and was completed in May 2011. The runway width was increased from 45m (148feet) to 60m (200feet) with a runway shoulder width of 7.5 m added on each side.[35] The ILS on 27 starts at 2900feet and is 9.1nmi long with a glide slope path of 3°.[36]

Runway 14/32 has ten taxiways including three rapid exit taxiways that connect to a parallel taxiway running along its eastern flank. It runs between Terminals 1 and 2 and was reconstructed in 2010. The runway shoulders were widened from 7.5mto15mm (24.6feetto49feetm).[35] The associated taxiways of secondary runway were upgraded in 2019. A new rapid exit taxiway and the conversion of taxiways to Code-F effectively increased the capacity of the runway. In 2020, the secondary runway set a record of 47 movements per hour during peak hour traffic as compared to 36 movements per hour.[29]

Issues with utilising 14/32 are:

MIAL was considering constructing a second parallel runway as part of its master plan. However, the construction of this runway would necessitate a large-scale relocation of either Air India's hangars and maintenance facilities or the airport's flight kitchens and the Sahar police station, among others, depending on its alignment. The parallel runway remains an active part of the expansion plan but in the meantime the cross runway is being upgraded as much as possible.[39]

Air traffic control tower

India's second tallest air traffic control tower with a height of 87.5m (287.1feet) after Delhi Airport (101.9 m) stands in a section of the parking area opposite terminal 1B. The triangular three-dimensional structure with soft vertices that won the Hong Kong Building Information Modelling (BIM) Award for the year 2009, has six storeys commencing from 62.1m (203.7feet).[40] The tower was inaugurated on 18 October 2013[41] and took over operations on 1 January 2014.[42]

From the new tower, air traffic controllers are able to see 5mile beyond the thresholds of both runways. The tower and its associated technical block and mechanical plant building cover a total of 2884sqm.[43] The cost of the fully equipped tower is estimated at 4 billion.[44] [45]

The previous ATC tower, built by the Airports Authority of India (AAI) at an overall project cost of about ₹2.80 billion, was functional from 1999 to 2013.[46] During that period, many airlines such as Singapore Airlines, Saudia, Qantas and United avoided landing at Mumbai airport when the secondary runway was in use as the ATC tower was too close to the runway and not in compliance with ICAO standards. The tower penetrated runway 14/32's transitional obstacle limitation surfaces by over 50 metres (for ILS approaches).[47] [48] The tower also obstructed the path of a parallel taxiway under construction for the secondary runway.[42] MIAL demolished the tower in 2014.[49]

Terminals

The airport has two terminals for scheduled commercial passenger services: Terminal 1 at Santacruz for domestic flights and Terminal 2 at Sahar for both international and domestic flights. While both terminals use the same airside facilities, they are physically separated on the cityside, requiring a 15–20-minute (landside) drive between them. A dedicated General Aviation Terminal caters to passengers using private and non-scheduled flight operations.

Currently operational terminals

Terminal 1

Terminal 1, locally known as Santacruz Airport, is used for domestic flights primarily operated by low-cost carriers. This was the original Santacruz building that was Mumbai's first passenger terminal which was once integrated, however was renamed Terminal 1 after the opening of the Sahar building for international operations and became a domestic operations terminal. It was refurbished several times over the decades, the most recent being during the 2000s. It was further divided into Terminal 1A, Terminal 1B, and Terminal 1C after their permanent closure during the course of late 1990s and early 2000s. It was used by SpiceJet, Go First, and IndiGo, but after Jet Airways dissolved on 17 April 2019, select flights from all the Terminal 1 airlines moved into the newer Terminal 2 building.[50] The terminal has 11 passenger boarding bridges. MIAL renamed Terminal 1B to Terminal 1 in January 2017 to help fliers identify it easily.[51] Citing safety and structural challenges, in March 2024, the Adani Group announced plans to demolish and re-build Terminal 1, a few months after Dinkar Balu Patil International Airport Navi Mumbai began operations. The rebuilding project will begin in 2025 and take three years to complete.[52] The New Terminal 1 will be connected to Terminal 2 through a three-lane underground tunnel to facilitate airside passenger movement between terminals. The tunnel will cost 500 - 600 Crores and will be completed in two phases.[53]

Terminal 2

Larsen & Toubro (L&T) was awarded the contract to construct the new Terminal 2, in order to differentiate it from the Old Terminal 2 Building. Skidmore, Owings & Merrill (SOM) was the architectural designer of the project. SOM also provided the schematic design of structure and MEP and the detailed structural design of the roof. Detailed design of the foundations and the rest of the structure and civil works, the MEP, IT, and airport systems, including the full construction documentation of the project was carried out by L&T's in-house design team, EDRC (Engineering Design and Research Center). The terminal covers a land area of 210,000 square metres and has replaced the Previous International Terminal (which has already been demolished). The entire project was estimated to cost and employ over 12,000 workers.[54] The X-shaped terminal has a total floor area of 450,000 square metres across four floors and handles both domestic and international passengers. It includes new taxiways and apron areas for aircraft parking designed to cater to 40 million passengers annually.[55] The structure has boarding gates on two piers extending southwards from a central processing building featuring a 42-metre high roof employing over 20,000 metric tonnes of fabricated steel covering 30 acres.[56] However, the eastern pier of Terminal 2 remains truncated due to non-clearance of slums in the adjoining plot, giving an asymmetrical look when seen from above. The new Terminal 2 building operates Multiple Aircraft Ramp System (MARS) stands and swing gates, so that a single stand can accommodate either one wide body aircraft or two narrow body aircraft, in either domestic or international configuration.[57] The new terminal is connected by the six-lane Sahar Elevated Access Road to the Western Express Highway. A metro rail link to the terminal is under construction.[58]

The New Terminal has around 21,000 square metres of retail space, lounges and travel services, over 5,000 square metres of landscaping and a multi level car park for 5,000 cars.[59] The parking Management System and Revenue control system for the entire MLCP has been designed and supplied by SKIDATA.[60] It has 192 check-in counters and 60 immigration counters for departing passengers, and 14 baggage carousels and 76 immigration counters for arriving passengers. To transfer passengers across its four levels, the building has 48 escalators and 75 elevators. The terminal also features 42 travelators.[55] In the initial phase of development, the apron adjoining Terminal 2 provides a total of 48 stands including 3 Code F stands (for the A380). In the final phase of development a total of 38 Code E/F contact stands, 14 Code E/F remote stands and 20 Code C remote stands are provided (total 72 stands).[57]

The GVK Lounge, the first common luxury lounge at an airport in India, opened in November 2014.[61] The lounge is open to First class and Business class travellers and can accommodate 440 guests at a time. It is spread over 30,000 square feet across two levels of the terminal and has a library, a business centre and fine-dining options, apart from the usual facilities like concierge services, smoking zone, food and beverage, bar, luxury spa, shower area and a relaxation area. The luxury lounge has won the 'World's Leading Airport Lounge – First Class 2015' award at the World Travel Awards 2015 held in Morocco.[62]

The terminal also houses the Niranta Airport Transit Hotel and the 32-room hotel is the first of its kind in the country.[63] It is located on Level 1 of the terminal and rooms may be booked by passengers who have checked into the airport.[64] IWG plc, operating under the brand Regus operates a shared workspace out of the terminal.[65]

The Old International Terminal was closed permanently at 13:00 on 12 February 2014, and international operations from the New Terminal 2 commenced from the same day.[66] The first arrival was Air India flight 343 (an Airbus A330-200) from Singapore via Chennai, and the first departure was Jet Airways flight 118 (a Boeing 777-300ER) to London. It was inaugurated by the then Prime Minister of India Manmohan Singh.[67] The domestic operations at Terminal 2 were launched on 9 January 2015, with the inaugural flight of Vistara arriving from New Delhi.[68] Vistara initially operated from Level 4 of the Terminal, which is being used only by international passengers, but in July 2015, they shifted to Level 3, which will be used only for domestic operations.[68] [69] Air India shifted all of its domestic operations from Terminal 1A to Terminal 2 on 1 October 2015 making it the second airline to operate domestic flights from the Terminal 2, to ease their International and Domestic passenger transfers,[70] [71] [72] [73] and Jet Airways shifted all of its domestic operations from Terminal 1 to Terminal 2 on 15 March 2016, facilitating a seamless transfer experience for its passengers,[74] whereas all other domestic airlines, namely Indigo, Go First, and SpiceJet, took place, both Departure and Arrival, at Terminal 1.[73]

After the demise of Jet Airways on 17 April 2019, other carriers launched additional domestic flights using slots vacated by Jet Airways. These flights were operated from Terminal 2.[75] This arrangement resulted in some of the larger carriers having to operate domestic flights from both terminals. Hence, MIAL moved to streamline operations at both terminals in September 2019, shifting all of its domestic operations of Indigo, AirAsia India and Go First back to Terminal 1, while SpiceJet shifted all of its domestic operations from Terminal 1 to Terminal 2.[76]

The airport has free Wifi connectivity provided by Tata Docomo across both Terminal 1 and 2. However, the service has been criticised for being ineffective and complicated access for international passengers, as the passengers need to get an OTP through an Indian phone number only, while the free service lasts for just 45 minutes, following which passengers have to buy data packs.[77] Despite the criticism, there has been no change in the wifi policy from the airport operators.[78]

Key facilities at the New Terminal 2[79]
FacilitiesCurrentEarlier
Parking stands for aircraft10884
Boarding bridges6025
Check-in counters192135
Car parking5,0003,600
Car Parking and Passenger ArrivalsAll vehicles arriving at Terminal 2 to pick up arriving passengers are routed via the Multi-Level Car Park and are charged a fee to counter traffic congestion at the airport. Four wheelers are charged a minimum fee of for 30 minutes in general parking and two-wheelers for 240 minutes.[80]

General Aviation Terminal

The airport's General Aviation Terminal for private and non-scheduled flight operators (NSOPs) is located at Kalina on the south-west side of the airfield.[81] The terminal was approved for international operations in April 2011,[82] making CSMIA the first airport in India[83] to have a self-contained terminal for handling round the clock domestic and international flight operations for private and NSOPs. The terminal offers facilities for passengers departing and arriving on private aircraft and business jets. The terminal has two exclusive lounges, two conference halls, two crew restrooms and a café bar.[84]

Previous terminals

Terminal 1 (Divided into 1A, 1B, and 1C)

When the Sahar terminal was opened in the 1980s, the terminal at Santacruz reverted to being a domestic terminal. The terminal consisted of three structures, Terminals 1A, 1B, and 1C.

In January 2017, MIAL renamed the Terminal 1B as T1.[51]

Terminal 2 (Divided into 2A, 2B, and 2C)

Terminal 2 of the airport is located at Sahar Village, in Vile Parle East. Designed by Aéroports de Paris and opened in January 1981, Terminal 2 was built in three modular phases as Terminals 2A, 2B, and 2C. Each module had a capacity of 2.5 million annual passengers. This terminal had an area of 120000m2.[12] The terminal structure was laid out in a space-saving vertical arrangement with separate levels for arrivals and departures. An overpass on the city-side took passengers to the upper level departure forecourt.[15]

The original terminal was a convex shaped single concourse building with 14 Code E contact stands. The greater T2 apron also provided a further 15 Code D/E and 6 Code C remote stands. This gave a total of 35 stands on the existing apron.[57] The departures section of 2A had 42 check-in counters, 18 more than in the international section at the Santacruz terminal. After completing customs and immigration formalities, the departing travellers were led down to a mezzanine floor where five elongated nodules connect the terminal with the aircraft via aerobridges.[15]

Terminals 2B and 2C were decommissioned in February 2014 when the new T2 took over operations. They were demolished later that year, so that the remainder of the new T2 could be completed.[91]

Cargo Complex

The Air Cargo Complex, located west of the international passenger Terminal 2, has been in operation since 1977.[92] The cargo apron is capable of handling five wide-bodied aircraft. In 2009–10, the airport handled 385,937 metric tonnes of International Cargo and 165,252 metric tonnes of Domestic Cargo.[93] Air India (AI) and Mumbai International Airport Pvt Ltd (MIAL) have been appointed as custodians of cargo by the Central Board of Excise and Customs at Mumbai. The Cargo Terminal has a Centre for Perishable Cargo (CPC) with an area of 1844 m2 for perishable and temperature sensitive international export shipments, strong rooms of 115 m2 for storage of valuable cargo and storage areas for dangerous goods in both import and export warehouses, dedicated Unaccompanied Baggage handling and clearance areas and 9 coloured X-ray cargo screening machines for export cargo.[94]

Apart from handling 65% of the international volumes at CSIA, MIAL also operates a Common User Domestic Cargo Facility. After taking over the redevelopment work of the airport in 2006, MIAL commissioned an offshore Common User Terminal (CUT) near the Marol pipeline as a temporary arrangement. In June 2016, MIAL opened a new domestic cargo CUT near the Western Express Highway in Vile Parle.

The CUT has been outsourced to Concor Air Ltd. on a Build-operate-transfer basis. The terminal has the capacity to handle 300,000 metric tonnes of cargo annually and is built on an area of 60,000 square feet. The Cargo Terminal is an "elevated terminal structure" where all arriving domestic cargo is managed from the basement level while departing cargo is handled at the upper level. Air India and Blue Dart handle their own domestic cargo operations at their own terminals.[95] Blue Dart opened its dedicated cargo facility at Mumbai Airport near Terminal 1 on 7 February 2019. The facility measures 4,300 square meters and has air-side and city-side access, allowing for faster transfer of shipments.[96]

Airlines and destinations

Cargo

Connectivity

Vile Parle is a railway station on the Western line and Harbour line of the Mumbai Suburban Railway network closest to both T1 and T2 of the airport.
Airport Road and Marol Naka are the stations on Line 1 of the Mumbai Metro system closest to Terminal T2.
Western Express Highway (WEH) is the station on Line 1 of the Mumbai Metro system closest to Terminal T1.

The Brihanmumbai Electricity Supply and Transport Undertaking (BEST) operates air-conditioned buses to the Airport from Thane, Navi Mumbai, Borivali, South Mumbai and Andheri railway station which can be booked on the Chalo App.[97] [98] [99] [100] The Navi Mumbai Municipal Transport (NMMT) runs bus services to the Airport from various nodes of Navi Mumbai.[101]

Upcoming airport metro stations

See main article: Line 3 (Mumbai Metro). Line 3 of the Mumbai Metro will run underground from Cuffe Parade to SEEPZ and serve CSMIA via three stations – one each at the Santacruz and Sahar terminals and one in the GVK SkyCity.[102] It will reduce the commute time between Colaba and the airport to 40 minutes.[103]

In early 2012, the MMRDA held talks with MIAL to either construct or finance the construction of three of the line's stations.[104] MIAL agreed to bear the cost of constructing the three stations, expected to total 777 crore, because of the potential increase in passenger convenience. However, CSIA placed conditions before MMRDA for the corridor;

MIAL specified that the commercial rights of the three stations it constructs will fully rest with the authority, and that revenue earned from any commercial activity on the premises would go to MIAL. It would undertake the design and civil construction of the stations, costing 600 crore, on its own, and would pay the estimated cost of electromechanical equipment (around 177 crore) to MMRDA in three equal instalments over three years.[102]

See main article: Line 7 (Mumbai Metro).

Line 7A is an extension of the [105] long 'Red Line' that will connect to T2.[106] The line will have an underground station at CSMIA.[107] Civil work on this line began in early 2020.[108] Tunnelling work is expected to be completed by December 2024.[109]

The MMRDA has also planned Line 8 between CSMIA and the under-construction Navi Mumbai International Airport.[107]

Awards

Along with Delhi Airport, the airport was adjudged the "World's Best Airport" at Airport Service Quality Awards 2017 in the highest category of airports handling more than 40 million passengers annually by Airports Council International.[110] It has also won the "Best Airport in India and Central Asia" award at the Skytrax 2016 World Airport Awards.[111] It is one of the three airports in India to have implemented Airport Collaborative Decision Making (A-CDM) to ensure timely takeoffs and landings.[112] The airport was awarded as the Best Airport In the Asia-Pacific in 2020 (over 40 million passengers per annum) by Airports Council International.[113] In March 2023, the airport was awarded again as the Best Airport in the Asia-Pacific in the category of over 40 million passengers per annum by Airports Council International.[114] In July 2023, the airport was ranked the fourth position out of the list of top 10 favourite airports in the world by Travel + Leisure.[115]

Accidents and incidents

1940s

1950s

1960s

1970s

1980s

1990s

2000s

2010s and 2020s

See also

Notes and References

  1. Web site: LIST OF INDIAN AIRPORTS .
  2. Web site: Annexure III – Passenger Data. aai.aero. 20 April 2024.
  3. Web site: Annexure II – Aircraft Movement Data. aai.aero. 20 April 2024.
  4. Web site: Annexure IV – Freight Movement Data. aai.aero. 20 April 2024.
  5. Book: 2019 Annual Airport Traffic Report. Port Authority of New York and New Jersey.. 2020. United States.
  6. News: 13 July 2021 . Adani Group takes over Mumbai airport . The Times of India . 14 October 2023 . 0971-8257.
  7. Web site: GVK CSIA Project . 21 September 2012 . GVK Industries Ltd..
  8. News: 13 February 2014 . Sahar elevated corridor: Five minute 'short-cut' to airport from Western Express High now open to public . . 13 February 2014.
  9. Web site: Mumbai airport renamed as Chhatrapati Shivaji 'Maharaj' International Airport. The Indian Express. 12 January 2019. 30 August 2018.
  10. Web site: Maharashtra State Gazetteers – Greater Bombay District . Cultural.maharashtra.gov.in . 28 December 2017.
  11. Web site: RAF Santacruz . rafweb.org . 9 January 2011. 17 September 2011.
  12. Web site: Transport by Air . Maharashtra State Gazetteers . 1987 . 5 March 2012.
  13. Web site: Airfield, Santacruz . . 30 October 1946 . 17 September 2011 . 27 September 2020 . https://web.archive.org/web/20200927215630/http://hansard.millbanksystems.com/written_answers/1946/oct/30/airfield-santa-cruz . live .
  14. Web site: Santacruz to be developed. . 19 May 1949. 17 September 2011.
  15. News: Travellers can breathe freely with brand new and improved terminal at Sahar in Bombay . India Today. 31 December 1980. 14 August 2019.
  16. News: Bombay airport: A costly inferno . 15 October 1979. 20 January 2016.
  17. Web site: Airport Privatization in India: Lessons from the Bidding Process in Delhi and Mumbai . Rekha Jain . G. Raghuram . Rachna Gangwar . 1 May 2007 . 7 January 2014 . dead . https://web.archive.org/web/20151017231430/http://115.111.81.83:8080/xmlui/bitstream/handle/123456789/233/2007-05-01_RekhaJain.pdf . 17 October 2015 .
  18. News: . Delta, JFK exploit Mumbai's star status . Crain's New York Business . 18 September 2006 . Potkewitz, Hilary.
  19. News: Delta plans non-stop Mumbai-NY flight . The Times of India . 4 September 2006 . 21 January 2023 . Manju . S. Ahmed . V. . Ali.
  20. News: Manju, V. . 13 May 2017 . Now, Mumbai world's busiest airport with only one runway . The Times of India . TNN . Mumbai . 13 May 2017.
  21. News: 20 September 2014 . Mumbai ATC handles a about 50 flights an hour . The Times of India . 29 September 2014.
  22. Web site: Leading airports across India in financial year 2020, by number of passengers handled(in millions) . 27 January 2021 . statista.
  23. Web site: Bidvest.co.za . 24 August 2010 . Bidvest.co.za.
  24. Web site: GVK website, CSIA . gvk.com . 19 January 2012.
  25. Web site: 24 June 2012 . Mumbai International Airport Limited – MIAL . 4 May 2016 . Association of Private Airport Operators.
  26. Web site: CSIA.in . CSIA.in . 8 February 2008 . 24 August 2010 . dead . https://web.archive.org/web/20090622054352/http://www.csia.in/Sita-Mial.asp . 22 June 2009 .
  27. News: Thomas. Tanya. 1 September 2020. Adani to acquire Mumbai airport. 1 September 2020. Livemint. en.
  28. News: Gandhi. Forum. Adani takes over MIAL, Navi Mumbai airports after a 2-year tussle with GVK. 1 September 2020. @businessline. en.
  29. Web site: CSMIA all set to welcome passengers with the re-carpeted Primary runway 09/27 . Mumbai International Airport Ltd. . 8 April 2020 . 17 May 2020 . 28 July 2020 . https://web.archive.org/web/20200728061926/https://www.csmia.aero/pressnotes/fcbf2e3f12584b31b4b197085662f137.pdf . dead .
  30. "Common Agreement Document of the A380 Airport Compatibility Group Version 2.1 " page 8, European Civil Aviation Conference, December 2002. Retrieved 4 December 2012.
  31. News: Capacity enhancement at Mumbai Airport . . 17 May 2020 . 6 August 2020 . https://web.archive.org/web/20200806132257/https://www.nats.aero/apac/case-studies/capacity-enhancement-mumbai-airport/ . dead .
  32. News: Mumbai airport aims high; sets eyes on 48 flights per hour by next year . . 11 March 2011. 7 September 2012.
  33. News: Mumbai shifts to single runway to boost flight capacity . . 22 August 2013. 22 August 2013.
  34. News: 19 more flight slots for city airport this winter . . 20 October 2012 . 24 October 2012 . dead . https://web.archive.org/web/20131010123150/http://www.hindustantimes.com/News-Feed/SectorsAviation/19-more-flight-slots-for-city-airport-this-winter/Article1-947419.aspx . 10 October 2013 .
  35. News: Airfield redevelopment central to Mumbai Airport upgrade . . 19 January 2011 . 17 May 2020.
  36. Web site: AIRAC AIP Supplement . https://web.archive.org/web/20140318185102/http://www.aai.aero/misc/AIPS_2013_04.pdf . dead . 18 March 2014 . . 19 March 2013 .
  37. News: Mumbai airport to get satellite-based navigation system . Chinmayi . Shalya . 11 September 2012 . 21 March 2015 . Mumbai . The Times of India.
  38. News: Ban flight of civilian planes over BARC: Experts . Chinmayi . Shalya . 4 December 2008 . 21 March 2015 . Mumbai . The Times of India.
  39. Web site: Chhatrapati Shivaji Maharaj International Airport, Mumbai, Maharashtra . Airport Technology . 27 July 2010.
  40. Web site: MIAL ATC Tower. JSW Severfield Structures Limited . 7 June 2012.
  41. News: Tallest in India, new ATC tower to boost Mumbai air traffic . Business Standard. 18 October 2013. 19 October 2013.
  42. News: Air Traffic Control shifts to new tower . Mumbai Mirror. 1 January 2014. 1 January 2014.
  43. Web site: Air Traffic Control Tower, Chhatrapati Shivaji Maharaj International Airport. Arup . 7 July 2013.
  44. News: Mumbai's new ATC Tower scales futuristic heights . The Economic Times. 11 May 2011.
  45. News: New ATC tower to be inaugurated by October . https://web.archive.org/web/20140102200648/http://articles.timesofindia.indiatimes.com/2013-03-25/mumbai/38008917_1_new-atc-tower-atc-officials-secondary-runway . dead . 2 January 2014 . . 25 March 2013. 25 March 2013.
  46. News: Work on new ATC tower to begin soon . . 31 March 2009. 7 June 2012.
  47. Web site: IATA Warns of dangers of temporary runway closures in Mumbai. IFALPA. 9 September 2005. 1 January 2014. dead. https://web.archive.org/web/20150318231805/http://www.ifalpa.org/downloads/Level1/Safety%20Bulletins/Airport%20Issues/06SAB005%20-%20Mumbai%20Runway%20Closures.pdf. 18 March 2015.
  48. News: Mumbai airport to get new traffic control tower . . 4 April 2011. 7 June 2012.
  49. News: MIAL begins work to pull down old ATC . https://web.archive.org/web/20150705051259/http://epaperbeta.timesofindia.com/Article.aspx?eid=31821&articlexml=MIAL-begins-work-to-pull-down-old-ATC-16102014014003 . dead . 5 July 2015 . . 16 October 2014. 17 October 2014.
  50. Web site: Domestic Airlines. CSIA website. 13 September 2015. 10 September 2015. https://web.archive.org/web/20150910152707/http://www.csia.in/flightinformation/domestic-airlines.aspx. dead.
  51. News: Mumbai's domestic air terminal renamed from 1B to T1 . 3 January 2017. . 3 January 2017.
  52. News: Terminal 1 to be razed, rebuilt after Navi Mumbai airport opens next year . 11 March 2024. . Mumbai . 7 May 2024.
  53. News: Grounded for years, Mumbai airport's T1-T2 underground tunnel work set to begin after rains . 11 June 2024. . Mumbai . 11 June 2024.
  54. Web site: CSIA press release. CSIA. 19 December 2012. 26 June 2013. https://web.archive.org/web/20130626030353/http://www.csia.in/pressrelease/18b74602d8024d4bb45aacc40d0f7894.pdf. dead.
  55. Web site: CSIA Master plan. CSIA. 14 September 2012. 9 September 2012. https://web.archive.org/web/20120909023953/http://www.csia.in/knowyourairport/masterplan.aspx. dead.
  56. Web site: Geodesic Techniques. 4 June 2015. 4 March 2016. https://web.archive.org/web/20160304065654/http://www.geodesictechniques.com/projects/Mumbai_Airport_Terminal_2B. dead.
  57. Web site: CSIA airport apron Case Study. dead. https://web.archive.org/web/20130527005021/http://www.airporttech.tc.faa.gov/ATT2010/Pavements/Session4a/McCullagh-A%20Case%20Study%20Upgrade%20of%20the%20Terminal%20Apron.pdf. 27 May 2013.
  58. Web site: Mumbai airport's big face-lift: The story so far. CNN Travel. 4 June 2015. https://web.archive.org/web/20121027075524/http://www.cnngo.com/mumbai/life/mumbai-airport-face-lift-story-so-far-625030. 27 October 2012. dead.
  59. News: New terminal, network of taxiways for Mumbai by 2013 . https://archive.today/20130126040638/http://articles.timesofindia.indiatimes.com/2011-11-21/mumbai/30425581_1_rapid-exit-runway-mial . dead . 26 January 2013 . . 21 November 2011.
  60. Web site: HINDITRON – High Performance Computing – Boston. 4 June 2015. dead. https://web.archive.org/web/20150620032947/http://www.hinditron.com/revenue-control-solutions/default.html. 20 June 2015.
  61. News: Now, luxury lounge at CSIA for first, business class travellers. . 26 November 2014. 1 January 2016.
  62. News: GVK Lounge at CSIA selected as 'World's Best First Class Lounge'. . 24 December 2015. 1 January 2016.
  63. News: With transit hotel at Mumbai airport, now fliers won't lose sleep . . 24 July 2015. 1 October 2015.
  64. Web site: Niranta Hotel . CSIA website . 1 October 2015 . 4 October 2015 . https://web.archive.org/web/20151004103519/http://www.csia.in/passenger/niranta.aspx . dead .
  65. News: Verma . Prachi . Regus to open facility at Mumbai airport . 26 August 2019 . The Economic Times . 8 April 2016.
  66. News: 10 December 2013 . Mumbai airport T2 to open for passengers on Feb 12 . . 11 December 2013.
  67. News: Mishra . Lalatendu . Swanky terminal inaugurated at Mumbai international airport . 27 January 2020 . The Hindu . 10 January 2014 . en-IN.
  68. News: Vistara to operate out of Mumbai International Airport's new T2 terminal . The Economic Times. 1 January 2015 . 2 January 2015.
  69. News: Test drive at T2 to check readiness for domestic flights . . 25 July 2015. 13 September 2015.
  70. News: Air India to make Mumbai its secondary hub . . 1 October 2015. 1 October 2015.
  71. News: Air India shifts all operations to Mumbai airport's T2. The Times of India. 2 October 2015 . 18 January 2016.
  72. Web site: Domestic flights to operate from Terminal −2. airindia.in. 18 January 2016.
  73. News: Air India to move to Mumbai airport T2 from 1 Oct. 18 January 2016. Business Standard India. 16 September 2015.
  74. Web site: Mumbai:Jet Airways shifts domestic operations to Terminal 2 from today . The Indian Express. 15 March 2016. 17 March 2016.
  75. News: SpiceJet launches 12 flights from T2 in slots left vacant by Jet. 15 May 2020 . The Hindu. 7 May 2019.
  76. News: Mumbai airport to change terminals for SpiceJet, IndiGo, GoAir domestic and international flights . 15 May 2020 . Daily News & Analysis. 28 August 2019.
  77. Web site: Free Wi-Fi still out of reach for many international flyers. . 20 February 2018.
  78. Web site: Why Don't Indian Airports Offer Free WiFi To Passengers?. 22 May 2013.
  79. Web site: CSIA.in . CSIA.in . 18 October 2011 . dead . https://web.archive.org/web/20111008160801/http://csia.in/knowyourairport/masterplan.aspx . 8 October 2011 .
  80. Web site: Parking Facility . csia.in . 26 November 2019 . 20 March 2018 . https://web.archive.org/web/20180320194233/http://www.csia.in/passenger/parking-facility.aspx . dead .
  81. Web site: General Aviation . Mumbai International Airport Limited . 18 September 2020 .
  82. News: Mumbai international airport opens VIP terminal for international operations too . . 18 April 2011. 18 September 2020.
  83. Web site: General Aviation – Unfolding horizons . . 18 September 2020.
  84. Web site: MIAL General Aviation Terminal – Press release . 27 March 2017 . 25 April 2012 . https://web.archive.org/web/20120425164053/http://csia.in/pressrelease/b57f93ed1d9747d0a3b2189940371a8f.pdf . dead .
  85. News: Kingfisher Airlines to take wings on May 9. DanceWithShadows.com. 8 May 2005. 1 January 2016. dead. https://web.archive.org/web/20101112172115/http://www.dancewithshadows.com/business/kingfisher-airlines-first-flight.asp. 12 November 2010. dmy-all.
  86. Web site: GoAir to use Terminal 1A in Mumbai airport from July 1. Business Line. 4 June 2015.
  87. News: Air India to move to Mumbai airport T2 from Oct 1 . . 16 September 2015. 1 January 2016.
  88. News: Terminal 1B in Mumbai to handle GoAir arrivals from March 15 . . 14 March 2016. 17 March 2016.
  89. News: Mumbai airport unveils new domestic terminal . . 18 April 2010. 17 February 2013.
  90. News: Razing of terminal 2A begins at airport . The Indian Express. 7 January 2009. 26 December 2011.
  91. News: Swanky terminal inaugurated at Mumbai international airport . Lalatendu . Mishra . 10 January 2014 . . Mumbai . 4 February 2015.
  92. Web site: MIAL Air Cargo Complex. https://web.archive.org/web/20120531014220/http://www.csia.in/airportdevelopment/information/Air_20Cargo_20Complex_201.pdf. dead. 31 May 2012. 10 December 2019.
  93. Web site: MIAL Air Cargo Performances. https://web.archive.org/web/20120531014244/http://www.csia.in/airportdevelopment/information/Air_20Cargo_20Performances_201.pdf. dead. 31 May 2012. 10 December 2019.
  94. Web site: MIAL Cargo Facilities. https://web.archive.org/web/20120531014315/http://www.csia.in/airportdevelopment/information/CargoFacilities.pdf. dead. 31 May 2012. 10 December 2019.
  95. News: MIAL sees cargo volumes flying on e-comm business. Daily News & Analysis. 7 June 2016. 12 June 2016.
  96. News: Blue Dart launches a new state-of-the-art facility at Mumbai International Airport . India Infoline. 8 February 2019. 14 August 2019.
  97. News: BEST starts 12 services to Mumbai's T2 international airport from Thane . Maonj . Badgeri . . Mumbai . 3 July 2014 . 4 February 2015 .
  98. News: Sen . Somit . Mumbai: Now, AC bus ride on Andheri station-T2 shuttle route for Rs 6 Mumbai News . 2 June 2020 . The Times of India . 11 March 2020 . en.
  99. Web site: Mumbai Luxury AC Bus Service Connecting City To Airport: Comfortable, Convenient, And Cost-Effective . 25 January 2024 . Free Press Journal . en.
  100. News: 13 October 2023 . Now, book a ride on BEST's Chalo app for T2-Borivli route . 25 January 2024 . The Times of India . 0971-8257.
  101. News: NMMT will run 2 routes from city to airports . Sanjay . Bannerjee . . Navi Mumbai . 4 February 2015.
  102. Web site: MIAL to build three stations near airport . The Indian Express. 5 March 2012 . 28 March 2012.
  103. News: Mumbai airport plans Rs 1,600-crore upgrade . Business Standard. 10 March 2014 . 10 September 2014. Phadnis . Aneesh .
  104. Web site: Development body in talks with CSIA. The Indian Express. 14 January 2012. 10 September 2014.
  105. Web site: Mumbai Metro Line 7 (ANDHERI EAST – DAHISAR EAST). 15 May 2020.
  106. News: State clears extension of Metro 7 up to Terminal 2. 15 May 2020.
  107. News: Metro 7A in Mumbai to get twin tunnels. Hindustan Times. 24 January 2019. 15 May 2020.
  108. News: Mumbai: Work on second underground Metro line 7A begins . The Indian Express. 5 March 2020. 15 May 2020.
  109. News: Metro 7A's second tunnel work begins, 2024 Deadline. The Times of India. 7 November 2023. 11 June 2024.
  110. Web site: Delhi's IGI, Mumbai's Chhatrapati Shivaji Maharaj airports beat Singapore Changi, Seoul Incheon to become world's best. The Financial Express. 7 March 2018. 2 May 2018. Devanjana Nag.
  111. Web site: CSIA voted Best Airport in India and Central Asia. Business Line. 21 March 2016. 22 March 2016.
  112. News: Only 2 AAI airports are making profits . 17 March 2015 . . 21 March 2015 . New Delhi.
  113. Web site: 2020 – Best Airport by Size and Region . ACI World . 10 March 2021 . 1 March 2021 . https://web.archive.org/web/20210301172701/https://aci.aero/customer-experience-asq/asq-awards-and-recognition/asq-awards/current-winner-2020/best-airport-by-size-and-region/ . dead .
  114. News: Raj, Amulya. Mumbai International Airport Declared Asia-Pacific's Best Airport In 'Over 40 Million Passengers' Category. Zee News. 6 March 2023. 7 March 2023. en.
  115. News: Mumbai airport ranked 4th favorite international airport of 2023 by Travel + Leisure. CNBC TV18. 12 July 2023. 15 July 2023. en.
  116. News: Doctor . Vikram . Anatomy of a crash: Lessons for Indian aviation from a 69-year-old tragedy . 3 April 2020 . The Economic Times . 30 June 2018.
  117. Web site: Sunday 19 July 1959 at Aviation Safety Network . Aviation-safety.net . 19 July 1959 . 18 February 2018.
  118. Web site: Ranter . Harro . ASN Aircraft accident Convair CV-990-30A-5 Coronado PK-GJA Mumbai Airport (BOM) . aviation-safety.net . 18 May 2022.
  119. Web site: ASN Aircraft accident Boeing 747-128 N28888 Mumbai (Bombay). Harro Ranter. 12 June 1975. aviation-safety.net. 8 July 2015.
  120. Web site: Fire guts Bombay's Santa Cruz airport, family of three dies. India Today.
  121. Web site: Accident Database: Accident Synopsis 06221982 . Airdisaster.com . 22 June 1982 . 30 August 2010. usurped . https://web.archive.org/web/20100811193649/http://www.airdisaster.com/cgi-bin/view_details.cgi?date=06221982&reg=VT-DJJ&airline=Air+India. 11 August 2010 .
  122. Web site: Fatal Events Since 1970 for Air India . Airsafe.com . 30 August 2010 . live . https://web.archive.org/web/20100223015026/http://www.airsafe.com/events/airlines/ain.htm . 23 February 2010 .
  123. News: 1993 blasts: first attack where max RDX used after WW-II: SC . 16 November 2019 . The Economic Times . 21 March 2013.
  124. News: IANS . The 1993 blasts: A recap of the day that shook India . 16 February 2022 . India Today . 22 March 2013 . en.
  125. News: Mumbai airport becomes operational after two days . Rediff.com . PTI. 28 July 2005 . 23 March 2012.
  126. News: AI plane skids off runway . Hindustan Times . PTI . 30 July 2005 . 23 January 2024.
  127. News: A-I pilot did not brake hard: Patel . Rediff.com . PTI . 30 July 2005 . 23 January 2024.
  128. Web site: VT-AIK at BOM . asn.flightsafety.org . Aug 11, 2024.
  129. Web site: Final Investigation Report on Engine Fire Serious Incident to M/s Nacil(a), B747-400 Aircraft, Vt-esm at Mumbai Airport on 4th Sep' 2009. 14 October 2020. aviation-safety.
  130. News: Kakodkar . Priyanka . Bhatt . Miloni . Pandey . Sunchika . AI plane catches fire; probe ordered . 13 October 2020 . NDTV.com . 5 September 2009.
  131. News: Inamdar . Siddhesh . Air India plane catches fire; passengers safe . 13 October 2020 . The Hindu . 5 September 2009 . en-IN.
  132. Web site: ASN Aircraft accident Boeing 777 VT-ALH Mumbai International Airport . Aviation Safety Network . 28 April 2024.
  133. Web site: Exclusive photos: Air India strips its newest Boeing 777-200LR . bangaloreaviation.com . 28 April 2024.
  134. News: Chowdhury . Anirban . 17 December 2015 . Air India technician dies in freak accident . The Economic Times . 7 December 2019.
  135. News: Tripathi . Neha . 6 May 2021 . Plane with Covid-19 patient onboard makes belly landing at Mumbai airport . Hindustan Times . 6 May 2021.
  136. News: Naik . Yogesh . 8 May 2021 . Emergency landing at Mumbai airport: In my career, never heard of aircraft wheel falling off, says pilot . The Indian Express . 16 February 2022.
  137. News: Yadav . Anu . Sharma . Krishna . 14 September 2023 . Charter aircraft skids off runway at Mumbai airport, delays 40 flights . en . Mint . 17 September 2023.
  138. News: 15 September 2023 . Aircraft from Vizag breaks into 2 while landing at Mumbai airport . The Times of India . 14 October 2023 . 0971-8257.
  139. Web site: Mumbai Airport Crash: Chartered Plane Skids Off Runway; 8 Hospitalised, Pilots Critical . 14 October 2023 . Free Press Journal . en.
  140. Web site: A6-ENT at BOM.
  141. News: Nath . Sanstuti . 21 May 2024 . Emirates Flight Suffers Damage After Hitting Flock Of Flamingos, Lands Safely At Mumbai Airport . News18 . 10 August 2024.