Mudeirej Bridge Explained

Jisr el Mdeirej
Native Name:جسر المديرج
Native Name Lang:Arabic
Status:Complete
Location:Sawfar, Mount Lebanon,
Location Town:Mdeirej
Location Country:Lebanon
Completion Date:1998
Destruction Date:12 July 2006
Cost:44 million USD
Altitude:1320 meters (4331 feet)
Building Type:Bridge
Structural System:Triple T-section girder bridge
Renovation Date:August 2008
Height:70 meters[1] (230 feet)
Structural Engineer:Khatib & Alami
Main Contractor:TOTO Costruzion
Designations:Connects the Beirut-Damascus Highway

The Mudeirej Bridge or Mdairej Bridge is a bridge in Lebanon. It was completed in 1998 as the tallest and highest bridge in Lebanon and the Middle East but this has since been surpassed. The bridge was built as part of Rafik Hariri's vision of rebuilding and developing Lebanon and its infrastructure. The bridge served as a connecting route for the Beirut-Damascus Highway aiming to improve the main road that links Syria's capital city Damascus, to Lebanon and its capital city Beirut.[2]

Destruction

On the 12th of July during the 2006 Lebanon-Israel conflict the Israeli Air force bombed the Mudeirej Bridge causing partial damage to its base and pillars, and critical damage to the road it uplifted. The destruction of the bridge which was a symbol of Lebanese architectural pride was considered by many in Lebanon to be unjustified because of the perceived low strategic value to the bridge in Israeli's conflict with Hezbollah. According to one observer of the bombing, “The bombing of this bridge, which is the pride of the Lebanese people, clearly proves that Israel is committed to destroying the infrastructure of the whole country. This bridge is not used by Hezbollah since it lies in a mountain resort area of Mount Lebanon, far away from the south of Lebanon."

In 2007, USAID announced that it would be involved in an extensive reconstruction of the bridge,[3] due to Lebanon's political victory which put Israel and the United States in an awkward position in regards to the destruction and reconstruction of the bridge. USAID put forward US$30 million for the project.

External links

33.8008°N 35.7271°W

Notes and References

  1. https://totospa.it/en/projects/viadotto-mdeirej/
  2. Web site: Israel destroys the highest bridge in Lebanon . July 22, 2006 . Ya Libnan, Turkish Press . January 30, 2009 . dead . https://web.archive.org/web/20080703234734/http://yalibnan.com/site/archives/2006/07/israel_destroys.php . July 3, 2008 .
  3. Web site: U.S. Government announces award for reconstruction of $30 million bridge project in Lebanon - Lebanon.