Bugoye Hydroelectric Power Station Explained

Bugoye Power Station
Location Map:Uganda
Location Map Caption:Map of Uganda showing the location of Bugoye Station.
Coordinates:0.3056°N 30.0981°W
Country:Uganda
Location:Bugoye, Kasese District
Purpose:P
Status:O
Dam Crosses:Mubuku River
Plant Name:Bugoye Power Station
Plant Operator:TronderEnergi
Plant Commission:7 October 2009
Plant Type:R
Plant Hydraulic Head:159m (522feet)
Plant Turbines:2 Francis turbines
Plant Capacity:13 MW
Plant Annual Gen:82 Gwh

Bugoye Power Station is a 13MW mini hydroelectric power station in Uganda. In the literature, Bugoye Power Station is sometimes referred to as Mubuku II Power Station.

Location

The power station is located across the Mubuku River, in Bugoye, Kasese District, in Western Uganda. This location lies in the foothills of the Rwenzori Mountains, close to the border with the Democratic Republic of the Congo. Bugoye lies approximately, by road, north of Kasese, the location of the district headquarters, and the nearest large city.[1]

Overview

The Bugoye Hydropower Project, is a run of the river mini-hydropower installation, with installed capacity of 13 MW. The energy generated is fed into the national electric grid at Nkenda Substation, located 6km (04miles) from Bugoye, via a 33kV transmission line.

The power station is owned and operated by TronderEnergi, a Norwegian power company. Construction began in March 2008 and the plant was commissioned 19 months later in October 2009.[2] Bugoye Power Station is the third mini-hydropower station on River Mubuku. The other two are Mubuku I Power Station, owned by Kilembe Mines Limited (KML), with installed capacity of 5 MW and Mubuku III Power Station, owned by Kasese Cobalt Company Limited (KCCL), with installed capacity of 10 MW.[3]

Construction costs

The estimated costs for the dam and power plant is approximately US$35 million. The funding was facilitated by a loan from the Emerging Africa Infrastructure Fund, (EAIF). This does not include the construction of a 33kV transmission power line linking the power station to the substation where the power is integrated into the national grid. The power line was funded by a grant from the Government of Norway to the Government of Uganda. By mutual consent between the two governments, Tronder Power Limited, assumed the responsibility of developing, constructing, maintaining and servicing the power line.[4] Tronder Power Limited is a Ugandan company co-owned by TronderEnergi and Norfund.[5]

See also

External links

Notes and References

  1. Web site: Globefeed.com . 4 May 2014. Map Showing Kasese And Bugoye With Distance Marker.
  2. Web site: Bugoye Plant Operating In Uganda. 11 February 2010 . Water Power Magazine . 4 May 2014.
  3. Web site: River Nyamwamba Spills Wrath . Masereka . B . 4 May 2014 . . dead . https://web.archive.org/web/20140505055843/http://www.newvision.co.ug/mobile/Detail.aspx?NewsID=642322&CatID=442 . 5 May 2014 .
  4. Web site: SEAMS And Bugoye Projects. 4 May 2014. Emerging Africa Fund.
  5. Web site: 4 May 2014. About Tronder Power Limited. Tronder Power Limited. dead. https://web.archive.org/web/20140208091117/http://www.tronderpower.com/. 8 February 2014.