Mtwara Port Explained

Port of Mtwara
Country:Tanzania
Location:Mtwara
Pushpin Map:Tanzania#Africa#World
Pushpin Map Caption:Location of Dodoma
Locode:TZMYW[1]
Opened:1950
Operated:Tanzania Ports Authority
Owner:Government of Tanzania
Type:Natural
Berths:2 [2]
Blankdetailstitle1:Channel depth
Blankdetails1:10m
Employees:220 (2012)
Leadershiptitle:Port Manager
Leader:Hebel Mwasenga
Arrivals:99 [3]
Cargotonnage: 273,000
Containervolume: 14,337

The Mtwara Port was built during the British Colonial times in the city of Mtwara in southern Tanzania. The harbor at the Port of Mtwara was deepened during the colonial times by the British in 1948-1954, and a railway line was built connecting the port, as part of the Tanganyika groundnut scheme. Due to the failure of the scheme the port immediately lost value and the railway line was removed. The port was functional but underutilized for many years due to poor transport infrastructure,[4] However, in the years of 2010-2011 the increased activity in oil and gas natural resources energy exploration caused a surge on operations.[5] The Mtwara port is also an integral part of the Mtwara Development Corridor project and has recently seen major upgrades.[6] The port also has a special economic zone attached to it and In December 2015 Alistair Freeports Limited injected $700,000 to upgrade the Export processing zone around the port area.[7]

Operations

The port has historically handled very little cargo due to the lack of large industries in the area. The major export out of the port has always been cashew nuts. The Port has a quay wall of 385m and can handle two ships and one ocean ship at once.[8] Previously the port could only dock ships of length up to 175m however with recent renovations in 2015, the port could dock a 209m ship in February 2015.[9] The port handles 400,000 metric tonnes of cargo annually and constitutes to less than 5% of the total countries cargo movement, however, the government plans to upgrade the port drastically to facilitate trade in the southern part of the country.

The Mtwara Development Corridor

See main article: Mtwara Development Corridor.

The harbour is an integral part of the Mtwara Development Corridor project. The infrastructure around the port is currently being development to help facilitate more cargo to be handled at the port. The port is destined to be an alternative cargo gateway for cargo bound for southern Tanzania, Malawi, Eastern Zambia and Northern Mozambique. Furthermore, for the success and growth of the major coal and iron mining projects such as the Mchucuma Iron Mine and the Liganga mine they need to be able to handle high capacity bulk loads to facilitate exports through the port.[10]

See also

Notes and References

  1. Web site: UNLOCODE (TZ) - TANZANIA, UNITED REPUBLIC OF . service.unece.org . 28 April 2020.
  2. Web site: TPA - Annual Statistics 2012/2013. tanzaniaports.com. Tanzania Ports Authority. 31 December 2015.
  3. Web site: Annual Report 2016 . www.ports.go.tz . 14 March 2019.
  4. http://www.tanzaniaports.com/port/mtwara.htm TPA, TPA Ports, Mtwara
  5. https://www.economist.com/news/middle-east-and-africa/21576412-gas-bonanza-brings-hopes-wealth-mtwara-rockefellers The Economist - Tanzania's gas boom - The Mtwara Rockefellers
  6. Web site: Mtwara port set for major upgrade. www.theeastafrican.co.ke. 2015-12-31.
  7. News: Kimaro. Haika. Dar Firm Injects Sh1.5 Billion in Mtwara's Free Port Zone. 23 December 2015. The Citizen. AllAfrica. 21 December 2015.
  8. Web site: MTWARA PORT. www.tanzaniaports.com. 2015-12-31.
  9. Web site: Tanzania: Mtwara Port Handles Huge Ships After Renovations. allAfrica.com. Allafrica. 2015-12-31.
  10. News: Mtwara Set to Become Economic Powerhouse. Masato. Masato. 11 September 2012. 30 December 2015. AllAfrica.