Mount Kongo Ropeway | |
Status: | Operation Suspended[1] |
Location: | Mount Kongō, Chihayaakasaka, Ōsaka, Japan |
No Stations: | 2 |
Open: | 1966 |
Character: | Aerial tramway |
Line Length: | 1.31NaN1 |
Speed: | 5 m/s |
Vertical: | 267m (876feet) |
Trip Duration: | 6 min |
Carrier Cap: | 46 Passengers per cabin, 2 cabins |
The is Japanese aerial lift line in Chihayaakasaka, Ōsaka. The line is unique as it is owned by the village government. The line operation is entrusted to, a private company that mainly operates restaurants. Opened in 1966, the line climbs Mount Kongō, the highest point of Ōsaka.
As of November 1, 2019, operation is suspended at Mt. Kongo Ropeway.