General Pierce Bridge Explained

General Pierce Bridge
Image Upright:1.3
Carries:vehicular and pedestrian traffic
Crosses:Connecticut River
Locale:Greenfield and Montague, Massachusetts
Maint:MassHighway
Id:G-12-020
Design:steel truss bridge
Length:229.5m (753feet)
Width:7.9m (25.9feet)
Traffic:19,400
Complete:1947
Coordinates:42.5803°N -72.5797°W

The General Pierce Bridge is a steel truss road bridge over the Connecticut River between Greenfield, Massachusetts and Montague, Massachusetts carrying Montague City Road.

In summer 2021, the bridge was closed to vehicle traffic while undergoing major repairs but remained open for foot traffic. Originally expected to fully reopen in summer 2024,[1] repairs had been completed ahead of schedule and the bridge completely reopened by the end of February 2023.[2]

Previous structures

The current bridge was preceded at that location by two bridges destroyed in the Flood of 1936. Upstream was the wooden double-decked covered bridge known as the Montague City Bridge, and carried rail traffic on top, with other traffic below. It was built in 1866, and was over long, with 5 spans. Next was the trolley bridge, which was a metal through-truss.[3]

When the Flood of 1936 came, the trolley bridge was knocked off its piers and sunk into the river, where it remains. The covered rail bridge floated down the river, where it knocked two spans off the New York, New Haven and Hartford Railroad Bridge (now known as the Canalside Rail Trail Bridge), then proceeded down the river to destroy the Sunderland Bridge.

See also

External links and references

5.

https://www.constructionequipmentguide.com/northern-construction-service-to-preserve-renovate-restore-general-pierce-bridge/53398 By Joe R. Parzych AN FREELANCE PHOTOJOURNALIST of Joe R. Parzych Photography etc./ https://www.linkedin.com/in/joseph-parzych-04362515b

Notes and References

  1. News: General Pierce Bridge to be Restored by 2024. Marcus. Max. The Greenfield Recorder. February 5, 2020. August 13, 2021.
  2. News: Mendoza . Julian . February 27, 2023 . General Pierce Bridge fully reopens after 2 years of construction . The Greenfield Recorder . April 13, 2023.
  3. Ed . Klekowski . Elizabeth . Wilda . Libby . Klekowski . 2003 . The Great Flood of 1936: The Connecticut River Story . DVD . WGBY . . https://web.archive.org/web/20110930222247/http://wgby.org/localprograms/flood/ . 2011-09-30 . 16 November 2011 . 10:35 . 58055715 . dead .