Mississippi Highway 76 Explained

State:MS
Type:MS
Route:76
Alternate Name:Corridor V
Map Custom:yes
Map Notes:MS 76 highlighted in red
Established:2013
History:Completed on April 11, 2023[1] [2]
Length Mi:10.7
Length Ref:[3] [4]
Direction A:West
Terminus A: near Fulton
Junction: near Belmont
Direction B:East
Terminus B: at the Alabama state line near Red Bay, Alabama
Counties:Itawamba
Previous Type:US
Previous Route:72
Next Type:US
Next Route:78

Mississippi Highway 76 (MS 76) is an east-west state highway in Itawamba County, Mississippi. It is a section of Mississippi's portion of Corridor V of the Appalachian Development Highway System. It branches off northeast from MS 25 northeast of Fulton and passes through the northeast quadrant of rural Itawamba County before connecting with Alabama's SR 24 section at the state line, just barely outside the city limits of Red Bay, Alabama.

MS 76 was proposed as a four-lane connection for SR 24 (and all of northeast Alabama) to Fulton, Tupelo, and I-22. Before April 11, 2023, it only extended 2.4miles from the state line to MS 23. The remaining 8.3miles stretch from MS 23 to MS 25 opened on that day, and was the final segment on Corridor V to open, making the trip between I-55 in Batesville to I-24 west of Chattanooga, Tennessee entirely a four-lane divided highway.[1] [2]

Route description

MS 76 begins at a T-intersection with MS 25 approximately 7miles from that highway's interchange with I-22/US 78 (Exit 108), and 9miles northeast of Fulton, in rural northeastern Itawamba County. It heads east as a four-lane divided highway with a grassy median without outside shoulders and follows an entirely new right-of-way. However, it roughly follows the path of Fairview Banner Road. After heading northeast for 8.3miles, it then has a T-intersection with MS 23 7miles southeast of Belmont. The highway travels through wooded, hilly terrain, passing by some farms and crossing some small creeks before continuing into Franklin County, Alabama as SR 24.

History

State:MS
Type:MS
Route:76
Length Mi:9.1
Established:1996
Decommissioned:2014
Location:Pontotoc

The MS 76 designation originated as a temporary designation for the 9.1adj=midNaNadj=mid western portion of the MS 6/US 278 Pontotoc bypass (also known as the Pontotoc Parkway) in Pontotoc, more specifically the section between MS 6/US 278 and the interchange at MS 9. It existed from 1996, until the designation was dropped when the rest of the highway was finished to Tupelo at US 45 in 2014. It, too, was a four-lane divided highway and is also a section of Corridor V. The 5.8adj=midNaNadj=mid section between MS 6/US 278 on the west side of town to MS 15 was the first to open, with a 3.3adj=midNaNadj=mid extension to MS 9 opening in 1998. This MS 76 designation remained unsigned until the year 2000. The current MS 76 was opened in 2013 alongside the opening of SR 24's Red Bay, Alabama bypass.[5]

Construction on the 8.3miles segment between MS 23 and MS 25 was originally scheduled to start in 2011 but was delayed due to funding concerns.[6] The project was expected to be completed by the end of 2023,[4] and it ultimately opened to traffic on April 11, 2023.[1] [2]

Notes and References

  1. News: Carlisle . Zac . Highway 76 extension opens Tuesday morning in Itawamba County . April 14, 2023 . . April 10, 2023 .
  2. News: Reed . Winston . New stretch of highway opens in Itawamba County . April 11, 2023 . . April 11, 2023 .
  3. Book: Mississippi Department of Transportation

    . Report . Mississippi Department of Transportation Planning Division . Mississippi Department of Transportation . December 31, 2010 . Mississippi Public Roads Selected Statistics Extent, Travel, and Designation . Mississippi Department of Transportation . October 2, 2022 .

  4. MDOT projects continue in northeast Mississippi . Mississippi Department of Transportation . November 23, 2021 . Mississippi Department of Transportation . October 2, 2022 .
  5. News: Jonathan . Willis . New Stretch of Alabama 24 Opens . Franklin County Times . May 11, 2013 . October 2, 2022 .
  6. News: Grant issued to finish four-laning of Hwy. 76 in Itawamba County . The Red Bay News . July 23, 2019 . October 2, 2022 .