Mirpur 11 | |
Native Name: | মিরপুর ১১ |
Type: | Dhaka Metro Rail station |
Native Name Lang: | bn |
Other Name: | Station 5 |
Style: | Dhaka Metro |
Address: | Section 11, Mirpur, Dhaka |
Country: | Bangladesh |
Coordinates: | 23.8191°N 90.3653°W |
Structure: | Elevated |
Platform: | Side platform |
Levels: | 3 |
Tracks: | 2 |
Electrified: | 1,500 V DC overhead catenary |
Accessible: | Yes |
Parking: | No |
Bicycle: | No |
Owned: | Dhaka Mass Transit Company Limited |
Mapframe: | yes |
Mapframe-Area Km2: | 5 |
Map State: | collapsed |
Mirpur 11 (romanised: Mirpur egaro) is an elevated metro station of the Dhaka Metro's MRT Line 6. This station is located in Mirpur, a neighbourhood of Dhaka, Bangladesh. The station commenced operation from 15 March 2023.[1]
G | Path level | Exit / Entry | |||
valign=top | L1 | valign=top | Between | valign=top | Rent control, station agent, metro card vending machine, crossover |
L2 | Side platform | Doors will open on the left |-|style="border-bottom:solid 1px gray;" width=100|Platform 1 Southbound|style="border-bottom:solid 1px gray;" width=500|Towards → Agargaon next station is Mirpur 10|-|Platform 2 Northbound|Towards ← Uttara North next station is Pallabi|-|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" colspan=2|Side platform | Doors will open on the left |-|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|L2|style="border-bottom:solid 1px gray;" width=100||style="border-bottom:solid 1px gray;" width=500||-|} References |