Milton Keynes Central railway station explained

Milton Keynes Central
Symbol Location:gb
Symbol:rail
Address:302 Elder Gate,
Milton Keynes, MK9 1LA
Country:England
Coordinates:52.035°N -0.773°W
Grid Name:Grid reference
Owned:Network Rail
Manager:London Northwestern Railway
Line:West Coast Main Line
Platforms:7 (numbered 1–2, 2A, 3–6)
Accessible:Lifts to platforms, step up to trains
Code:MKC
Classification:DfT category B
Original:British Rail
Years:17 May 1982
Events:Opened
Years1:29 December 2008
Events1:Platforms 2A and 6 added
Footnotes:Passenger statistics from the Office of Rail and Road
Mapframe:yes
Mapframe-Zoom:13

Milton Keynes Central railway station serves Milton Keynes and surrounding parts of Bedfordshire, Buckinghamshire and Northamptonshire (England). The station is located on the West Coast Main Line about 50miles northwest of London. The station is served by Avanti West Coast intercity services, and by West Midlands Trains regional services.

This is the principal station for the city, one of seven serving the Milton Keynes urban area. Milton Keynes Central, which opened on 17 May 1982,[1] is by far the busiest and most important of these, as well as being the largest in terms of platforms in use, having overtaken when platforms 2A and 6 became operational.

History and development

A new station for Milton Keynes

A new station to delimit the western end of the new central business district of Milton Keynes was a key objective for Milton Keynes Development Corporation (MKDC).[2] In the cash-strapped circumstances of the 1960s and 1970s, British Rail (BR) was unenthusiastic but eventually came round after a deal was done in 1978 on cost sharing.[3] In 1979, MKDC architect Stuart Mosscrop designed the station building and office blocks to either side, framing a new Station Square and the vista uphill along Midsummer Boulevard (and the midsummer sunrise).[4]

Opening

The station opened on 14 May 1982, with an official opening by Charles, then-Prince of Wales conducted three days later.[5] The adjacent office wings were completed three years later. Before Milton Keynes Central opened, Bletchley was the main station for Milton Keynes, served by British Rail InterCity services. These services moved to the new station, downgrading Bletchley.

2006–08 developments

In May 2006, the Department of Transport announced a plan to upgrade the station.[6] The first phase added a down fast line platform 6, so that the existing platform 5 could be used for stopping express trains in either direction. The second phase provided an additional terminating bay platform (2A), nominally to extend the Marston Vale Line service via the West Coast Main Line (WCML) to Milton Keynes Central.[7] This 5-car bay platform is indented into platform 1. The original bay platform 1 line was extended northwards to become a through platform (becoming the up slow line), and platform 2 line is now a terminating and reversing line, avoiding conflicting crossing movements. This work was completed on 29 December 2008.[8], a direct service between Bedford and Milton Keynes Central is not in any published plan, being overtaken by later events (see, below).

Platforms and layout

Milton Keynes Central has a total of seven platforms. Platforms 1 and 3 are the south and northbound slow platforms, while 4 and 6 are the south and northbound fast platforms. Platforms 2 and 5 are reversible, being slow and fast respectively. Platform 2 is used mainly by terminating stopping services from London Euston, whilst platforms 1 and 3 are used by West Midlands Trains services between Euston and Northampton, Birmingham New Street or Crewe. Platforms 4, 5 and 6 are used by Avanti West Coast inter-city express services between London and the West Midlands, north Wales, the north-west or Scotland.

Platform 2A is a five-car south-facing bay platform, originally intended for the extension of Marston Vale Line services from into Milton Keynes Central: this proposal no longer appears in plans for East West Rail, being replaced by a planned service to/from (see below). Meanwhile, platform 2A is used only by exception when additional platform capacity is needed, such as when there is a service delay. To the north of the station the six lines reduce to four (two slow and two fast) and there is a mile of five-track running to the south before this also reduces back to four.

The station is generally accessible: there are no unavoidable steps and there are lifts from the concourse to each platform.[9] As with all mainline railway stations, passengers with mobility limitations may need to pre-book assistance to get from the platform to the train.[10] Ticket gates are in operation.

Local facilities and interchange

The station building has a shop and café. There are other shops and restaurants on the south side of the station square. There are a number of hotels on Midsummer Boulevard (which begins opposite the station and leads up into the central business district).

The station forecourt is the terminus or key intermediate destination for many bus services; almost all local and district bus services stop there.[11] [12] These services are operated mostly by Arriva Shires & Essex as well as some routes by Stagecoach East and a number of independent operators.[13] Numerous bus services each hour traverse Midsummer Boulevard, connecting the station to the shopping centre, the theatre and Xscape.

Stagecoach East operate four major long-distance coach routes from here. Their route MK1 express service runs to Luton Airport via Luton railway station, providing a direct link between the West Coast Main Line and the Midland Main Line.[14] Route X5 route between Oxford and Bedford stops here, as does their X6 service to Northampton, with connections to Leicester and Peterborough. Arriva Shires & Essex also operate route X6 (formerly the X60) to Aylesbury via Buckingham and route X4 (formerly the 150) to Aylesbury via Leighton Buzzard via The Open University, which terminates at the station. (National Express services run from the Milton Keynes Coachway, about away, served from this station by the 3 or the X5.)

The Milton Keynes redway system, a comprehensive network of cycle/pedestrian shared use paths, connects to the station and its cycle parking facilities.[15]

Also in the station forecourt, there is a taxi rank (to the left on exit) and a pick-up space for private hire cars (to the right), plus limited (very) short term parking. There are multi-storey car-parks to the north and south of the station. Parking in the surrounding streets is heavily restricted to discourage commuter parking.[16]

The station square itself is a favourite site for skateboarding and freestyle BMX and as a result the granite facings of the planting surrounds have suffered from the continuous bumping and grinding. This has lessened somewhat since the opening of a dedicated skateboarding park (Sk8 MK) close to the former central bus station.[17] [18]

Services

Current services

London Northwestern Railway

Milton Keynes Central is a principal start and terminus for London Northwestern Railway (LNR) services to/from London Euston, and a major stop on others terminating/initiating at, or . The typical off-peak service provided by London Northwestern Railway is:[19]

Avanti West Coast

Many Avanti West Coast inter-city services call here, with three calls an hour in each direction off-peak on weekdays:[22]

Future services

East West Rail

See main article: East West Rail. From 2025, services are planned to operate (over a rebuilt Varsity line) to via Bletchley, calling at and .[23] [24] A desire to extend services to and beyond remains unfulfilled because it depends on building a new alignment eastwards between Bedford and Cambridge: a preferred route has been chosen but awaits approval.[25] In October 2019, the Department for Transport ruled out an early proposal to establish a service to via Claydon Junction, and .[26]

Former services

Connex South Central

In June 1997, Connex South Central began operating services between Gatwick Airport and Rugby via the Brighton Main Line and West London Line, calling at Milton Keynes Central.[27] [28] It was cut back to terminate at Milton Keynes in December 2000 before being withdrawn in May 2002 due to capacity constraints on the West Coast Main Line while the latter was being upgraded.

Southern

Southern reintroduced the London orbital route service in February 2009, with Class 377s initially operating to and from Brighton to Milton Keynes Central, before being curtailed at its southern end at South Croydon and later Clapham Junction.[29] [30] In May 2022, Southern cut its service back to terminate at Watford Junction,[31] where passengers may transfer to Avanti West Coast or London Northwestern services to stations north of Watford.

Location

The station is at the western end of Central Milton Keynes, near the junction of the A5 with the A509. The station post-code is MK9 1LA. In the chainage notation traditionally used on the railway, its location on the line is 49miles from Euston.[32]

In film

The station and its plaza were used in the 1987 movie as a substitute for the United Nations building. Other scenes were shot in the Central Milton Keynes area.[33] [34]

External links

Notes and References

  1. Book: Butt, R.V.J. . The Directory of Railway Stations . 1995 . Patrick Stephens Ltd . Yeovil . 1-85260-508-1 . R508 . 160 .
  2. Book: Bendixson . Terence . Platt . John . Milton Keynes: Image and reality . Granta Editions . 1992 . Cambridge . 0906782724 ., page 133136
  3. No station for Milton Keynes . . February 1969. 121.
  4. Book: Kitchen, Roger . 'The story of the original CMK' ... told by the people who shaped the original Central Milton Keynes (interviews) . Hill, Marion . 2007 . Living Archive . Milton Keynes . 978-0-904847-34-5 . 103 . 4 December 2019.
  5. Milton Keynes Central Opened. The Railway Magazine. June 1982. 128. 974. 258. 0033-8923.
  6. http://www.dft.gov.uk/pgr/rail/pi/wcml/westcoastmainlineprogressrep3458 West Coast Main Line: Progress Report – May 2006
  7. Oxford-Cambridge Varsity Line reopening proposals gather steam . 12 December 2013 . 30 July 2020. Rail Technology Magazine .
  8. Special Investigation: RAIB review of the railway industry's investigation of an irregular signal sequence at Milton Keynes, 29 December 2008 . Rail Accident Investigation Branch . 2010 . 30 July 2020.
  9. Web site: Milton Keynes Central (MKC): Accessibility and mobility access . nationalrail.co.uk . 31 July 2020.
  10. Web site: Information for disabled passengers . National Rail . 31 July 2020.
  11. Web site: Milton Keynes Central Station: Onward Travel Information . Network Rail . London Northwestern Railway . July 2018 . 31 July 2020.
  12. Web site: MK bus routes map . Milton Keynes Council . August 2019 . 31 July 2020.
  13. Web site: Timetables and routes . Milton Keynes Council . November 2019 . 31 July 2020.
  14. Web site: 99 Bus Route & Timetable: Luton Airport - Milton Keynes . Stagecoach . 25 September 2017.
  15. Web site: New redway map pinpoints pedallable culture . Helen Thakrar . June 2018 . 30 July 2020 . pedallingculture.com.
  16. Web site: Milton Keynes parking map . Milton Keynes Council . July 2017 . 31 July 2020.
  17. Web site: sk8m8 : Sk8MK Skate Plaza – Milton Keynes . sk8m8.com.
  18. News: Best practice don't repel the borders . 19 April 2006 . 16 February 2019. Local Government Chronicle .
  19. GB National Rail Timetable December 2022 – May 2023, Tables 66 & 67
  20. Web site: Timetable Crewe to London via Nuneaton 21 May to 9 December 2023. London Northwestern Railway. 21 May 2023.
  21. Web site: Timetable London Euston-Milton Keynes Central-Northampton-Birmingham New Street 21 May to 9 December 2023. London Northwestern Railway. 21 May 2023.
  22. GB National Rail Timetable December 2022 – May 2023, Table 65
  23. Web site: Chancellor accepts East West Rail targets and strengthens plans with extra cash . 22 November 2017 . www.railtechnologymagazine.com.
  24. Transport Secretary officially launches East West Railway Company at Bletchley Park . East West Rail Co. . 22 November 2017.
  25. 'A landmark moment': Consortium delight as 'central section' route is announced . 30 January 2020 . East West Rail Co.. 30 January 2020.
  26. Network Rail (East West Rail Bicester to Bedford improvements) order 201[]
    application for deemed planning permission; applications for listed building consent ]
    . Whitehead . Martin . 1 October 2019 . Department for Transport . 3 February 2020 . 19 February 2020. (Inspector's report) page 26
  27. South Central to launch Rugby-Gatwick service . . 305. 21 May 1997. 10.
  28. Connex Makes a Rugby Connection . . 15. August 1997. 7.
  29. https://www.networkrailmediacentre.co.uk/news/new-timetable-means-more-services-to-and-from-euston New Timetable means more services to and from Euston
  30. Southern extends to Milton Keynes . . 1296 . April 2009. 10.
  31. https://web.archive.org/web/20220528034813/https://www.nationalrail.co.uk/service_disruptions/48.aspx Changes to National Rail Timetable
  32. Web site: Engineer's Line References: London Euston to Crewe Line London Euston to Rugby Trent Valley Junction . RailwayCodes.org . 18 October 2019.
  33. Web site: Superman IV: The Quest For Peace (1987) . movie-locations.com.
  34. Web site: Superman IV (1987) . british-film-locations.com.