Burj Azizi | |
Former Names: | Entisar Tower |
Status: | Under construction[1] |
Building Type: | Residential, hotel, retail, observation, restaurant |
Location: | Sheikh Zayed Road, Dubai, United Arab Emirates |
Architectural: | 725m (2,379feet) |
Roof: | 665m (2,182feet) |
Observatory: | 649m (2,129feet) |
Top Floor: | 570m (1,870feet) |
Floor Count: | 133 |
Start Date: | 18 January 2024 |
Est Completion: | 2028 |
Owner: | Azizi Developments |
Architect: | AE7 Associates[2] |
Developer: | Azizi Developments |
Main Contractor: | Gardinia Contracting El Seif Engineering Contracting Company[3] |
Burj Azizi is a skyscraper to be built as a centrepiece of Sheikh Zayed Road, in Dubai, United Arab Emirates. It will have 133 floors for various purposes.[4]
In 2012, Meydan Group announced the Entisar Tower as a 5700NaN0 tower and 122-story. Groundbreaking occurred in 2016. Construction was halted in 2017 due to Dubai's civic building proposals department issuing a stop-work order due to a payment dispute with the developers, with the ensuing property bust making the projects abandoned.In 2018, Azizi Developments acquired the long-stalled Entisar Tower. In January 2024, the tower was rebranded and renamed as Burj Azizi, and construction restarted on 18 January 2024.