Valparaíso Metro Explained

Valparaíso Metro
Native Name:Metro Valparaíso
Locale:Gran Valparaíso, Chile
Transit Type:Commuter rail
Lines:1
Stations:20
Annual Ridership:20.2 million (2019)[1]
Operator:Metro Valparaíso
Character:Mostly at-grade, with an underground section
Headway:6–12 minutes
System Length:430NaN0
El:3 kV DC from overhead catenary
Map State:collapsed

The Valparaíso Metro (Spanish; Castilian: Metro Valparaíso, formerly called "Merval") is the commuter rail system serving the urban conglomeration of Gran Valparaíso, Chile. It consists of one line, 43km (27miles) long, serving 20 stations,[2] connecting the cities of Valparaíso, Viña del Mar, Quilpué, Villa Alemana, and Limache (outside the Valparaíso conurbation).

It is administered by Metro Regional de Valparaíso S.A., a subsidiary of the Chilean state-owned train company Empresa de los Ferrocarriles del Estado. The Valparaíso Metro began with the conversion of an interurban service on the Santiago–Valparaíso railway line into more rapid transit-like service in 2005[3] – the renovated line was inaugurated on November 23, 2005 and began service the following day. The Valparaíso Metro carried 20.17 million passengers in 2019.[1]

Together with the much larger Santiago Metro, it is one of the only two underground urban rail systems in Chile (the Valparaíso Metro has a 5km (03miles) underground stretch from Miramar through Chorrillos stations in Viña del Mar). However, it is not a full metro system due to the existence of various level crossings and the long distances between stations.[4] As a result of the presence of at-grade level crossings and regional rail character, the Valparaíso Metro is more analogous to a commuter rail system.

Studies are being done to assess the feasibility of extending the line farther inland along the Valparaíso-Santiago Railway to serve the towns of Quillota, La Cruz, and La Calera which are currently being served by intercity buses (Bus+Metro services) that feed into Limache Station.[5] [6] [7] In addition, passenger and freight service between Valparaíso and Santiago is proposed to use the line.[8]

History

Valparaíso had an interurban passenger train system since the 19th century. In 1999 construction began on the current system, rebuilding the old interurban stations and building new ones with a homologous design. In Viña del Mar, a tunnel over 5km (03miles) long was constructed. New trains arrived in Chile on February 22, 2005 and the old system was decommissioned on June 30 that year, in favour of the new Valparaíso Metro service.

On May 29, 2019, basic engineering studies were awarded to the CDI and Consultrans consortia, with a deadline of 3 years for execution to extend the Valparaiso Metro towards La Calera.[9] In parallel, the project is already being submitted for environmental impact studies, aiming to start construction in 2023 and ultimately begin operations in 2027. Its future stations will be San Pedro, Quillota Sur, Quillota Centro, La Cruz, Guerra, and La Calera. However, new reports indicate that construction would begin in 2025 and be completed in 2028.[10]

Architecture

Between Puerto and Recreo the line runs at street level, bordering the coast, parallel to Errázuriz and España Avenues. It descends into the tunnel below Viana and Álvarez Avenues, with four underground stations. The line leaves the tunnel at the industrial area of El Salto and continues along a winding path to the inner metropolitan area.

Stations

TrazadoStationInauguration DateLocationComuna (Borough)

Tramo 1
Valparaíso
PuertoNovember 23, 2005Errázuriz Avenue and Sotomayor SquareValparaíso
BellavistaErrázuriz Avenue and PudetoValparaíso
FranciaErrázuriz Avenue and FranciaValparaíso
BarónErrázuriz Avenue and ArgentinaValparaíso
PortalesAv. España and PelléValparaíso
35px
Tramo 2
Viña del Mar
RecreoAv. España and CovadongaViña del Mar
MiramarÁlvarez and Von SchroedersViña del Mar
Viña del MarÁlvarez and Eduardo Grove SquareViña del Mar
HospitalÁlvarez and Simón BolívarViña del Mar
ChorrillosÁlvarez and LusitaniaViña del Mar
El Salto3250 Limache AvenueViña del Mar
35px
Tramo 3
Quilpué
Valenciac. 2024Condell Sur Avenue and Pasaje Once
QuilpuéNovember 23, 2005Condell Sur Avenue and Vicuña MackennaQuilpué
El SolBaquedano Avenue and Aviador AcevedoQuilpué
El BellotoAviador Acevedo and Gómez CarreñoQuilpué
35px
Tramo 4
Villa Alemana
Las AméricasBerlín/Ibáñez and Las AméricasVilla Alemana
La ConcepciónBerlín/Ibáñez and PudetoVilla Alemana
Villa AlemanaBerlín and Armando La TorreVilla Alemana
Sargento AldeaDomingo Composto and TogoVilla Alemana
PeñablancaSargento Aldea and Presidente MonttVilla Alemana
35px
Tramo 5
Limache
LimacheArturo Prat and José Tomás Urmeneta Limache
35px
Tramo 6
Future extension
San Pedroc. 2027TBCQuillota
Quillota SurQuillota
Quillota CentroQuillota
La CruzLa Cruz
GuerraLa Calera
La CaleraLa Calera

Fleet and operations

Valparaiso Metro has a fleet of 35 trains; 27 single-deck multiple-car X'Trapolis 100 train sets manufactured by Alstom, France operate the service, in a blue and white livery and 8 single-deck multiple-car X'Trapolis Modular train sets manufactured by Alstom, in Barcelona.

Services operate 06:30-22:30 on weekdays; 07:30-22.30 on Saturday, and 08:00-22:15 on Sunday and public holidays. Services between Puerto and Sargento Aldea are most frequent, at 6-minute frequencies, with 12-minute frequencies elsewhere, 12 minutes on weekends and public holidays.[11]

Ticketing and fares

To access the services of Metro Valparaiso the only means of payment is the Metroval card, a smart contactless card, costing CLP$1,350 (US$2.05) in May 2016 and sold at all stations. The card can be loaded in all ticket offices with cash or Redcompra; the minimum charge for general users is $300 and $1,000 to use Redcompra, all loads must be multiples of $100. It is scanned both entering and leaving stations since fares depend on the length of the journey and the time of day. There are five Zones and three time-of-day fares. Tickets cost from CLP$410 (US$0.62) in low-usage hours within Zone 1 (T1) to CLP$864 (US$1.31) in rush-hour travelling through five zones, for example from Valparaíso to Limache. The service "Bus + Metro" in the Limache Station to the cities of Limache Viejo, Olmué, Quillota and La Calera cost between CLP$787(US$1.19) and CLP$1460 (US$2.22).

There are concession cards for students, senior citizens, disabled or handicapped people and tourists (This card allows unlimited travel on the day of acquisition and cost CLP$2.360 or US$3.58), Children below one metre in height travel for free.

Customer services and information offices are in 3 stations; Viña del Mar, Puerto and Limache.

See also

External links

Notes and References

  1. Memoria Anual Metro Valparaiso S.A. 2020 . 2021-04-15 . 42 . es . EFE Trenes de Chile – Menor tiempo de viaje con más y mejor calidad de vida .
  2. Web site: XIX Memoria Anual 2013 . Metro Valparaíso S.A. . es . 2013 Annual Report . 16 . 2014-07-26.
  3. Web site: Conócenos - Historia - El Servicio Ferroviario del siglo XXI . Metro Valparaíso . es . About Us - History - The Railway Service of the 21st century . 2014-07-25.
  4. Web site: Schwandl. Robert . Valparaíso . UrbanRail.net . 2014-07-25.
  5. Web site: LOGIN Noticias - Proyecto de extensión de Metro Valparaíso a Quillota-La Calera es rentable socialmente. LOGIN Noticias. www.login.cl. es-es. 2018-01-27. 2018-01-28. https://web.archive.org/web/20180128021046/http://www.login.cl/noticias/4400-proyecto-de-extension-de-metro-valparaiso-a-quillota-la-calera-es-rentable-socialmente. dead.
  6. News: Studies underway to extend Valparaíso rail system - BNamericas. 2015-11-02. BNamericas. 2018-01-27. en.
  7. News: Barría . Audénico . 13 May 2019 . Reactivan proyecto para extender Metro Valparaíso hasta La Calera . . es . 8 . 0718-6037 . Consejo de Políticas de Infraestructura (CPI) .
  8. Web site: Chile's Santiago-Valparaíso high-speed rail viable - study.
  9. Web site: Extensión Tren Limache – Puerto a Quillota y La Calera – EFE Trenes de Chile . 2023-10-12 . www.efe.cl.
  10. Web site: Valencia . Jean . 2023-04-18 . Proyecto ferroviario de Limache a La Calera: sondeos arqueológicos podrían retrasar obras hasta 2 años . 2023-10-12 . BioBio Chile . es.
  11. Web site: Viaje en Metro - Frecuencia . Metro Valparaíso . es . Metro Travel - Frequency . 2016-07-03.