Santo Domingo Metro Explained

Santo Domingo Metro
Imagesize2:250
Native Name:Metro de Santo Domingo
Area Served:Greater Santo Domingo, Dominican Republic
Transit Type:Rapid transit
Lines:2
Stations:34
Ridership:173,070 (daily avg., Nov. 2014)[1]
Annual Ridership:61,270,054 (2014)[2]
Operator:OPRET
Character:Mostly underground, with an elevated section on Line 1
Vehicles:19 Alstom Metropolis

The Santo Domingo Metro (Spanish; Castilian: Metro de Santo Domingo) is a rapid transit system in Greater Santo Domingo. Serving the capital of the Dominican Republic, it is the most extensive metro system in the insular Caribbean and Central American region by length and number of stations. It began operation on January 30, 2009.

The Metro is a major part of the "National Master Plan" to improve transportation in Greater Santo Domingo and the rest of the nation. The first line was planned to relieve traffic congestion on the Máximo Gómez and Hermanas Mirabal Avenue thoroughfares, which connect Santo Domingo. The second line, which opened in April 2013, is meant to relieve the congestion along the Duarte-Kennedy-Centenario Corridor in the city from west to east. The current length of the Metro, with the sections of the two lines open as of August 2013, is 27.35km (16.99miles). Before the second line's opening, 30,856,515 passengers had ridden the Santo Domingo Metro in 2012.[3] With both lines opened, ridership increased to 61,270,054 passengers in 2014.

Four more lines are planned to be constructed in the near future, for a total of six lines.

Overview

The first line was unofficially inaugurated on February 27, 2008.[4] On December 22, 2008, non-commercial operation of the metro system began and provided free service to the public during the Christmas holiday season. The metro was closed on January 6, 2009, for final touches before it opened for commercial use on January 30, 2009.[5]

Shortly after the inauguration of Line 1, presidential elections took place in the Dominican Republic. President Leonel Fernández stayed in power and promised to continue the expansion of the Metro across the Greater Santo Domingo. By mid-2009, construction of Line 2 had commenced and it opened on April 1, 2013.[6] An approval for an expansion of the second line was issued January 2014,[7] with construction beginning on April 1, 2014.[8]

Approval and construction

Line 1

President Leonel Fernández proposed and started the construction of the first subway system in the Dominican Republic and the second in the Caribbean. The actual first phase of the overall "Master Plan" for the Metro took place once Fernandez had proposed the construction of the Juan Bosch Bridge. The bridge was built with support for two heavy rail lines on the deck that until the third line of the system gets built are being used for regular vehicle traffic. This phase took place under Fernandez's first administration and with very little public knowledge of the Master Plan.

The project was prompted by the need to reduce the continually-rising heavy road traffic congestion; the current disorganized and inefficient public transportation system; and air pollution, which severely affects the residents' productive time and the health. The system will complement other forms of public transportation such as OMSA (Metropolitan Office of Buses Services) buses, with the government estimating that around 100 feeder buses will be in service. The first line of the mass-transit system has sixteen stations: six elevated, ten underground. It has a total route length of 14.5km (09miles) and connects Villa Mella in Santo Domingo Norte with La Feria in Santo Domingo. That is expected to bring relief to the city's current public transport system. Daily ridership is expected to be about 200,000 passengers once other lines or at least the feeder bus system is integrated. The first line opened for commercial service on January 30, 2009.

On September 23, 2007, President Fernández while on a trip to the East Coast of the United States announced that stations on the Santo Domingo Metro were not to be named by the streets that they intercepted but instead named to honor important historical people of the Dominican Republic. On February 25, 2008, during the final testing before the official inauguration of the line by President Fernández, Ing. Diandino Peña announced the official names for the stations.[9]

Line 2

In the presidential elections that took place on May 16, 2008, President Fernández was re-elected for his second consecutive term. However, long before his re-election, companies that specialize in studying land composition had begun drilling holes specifically around the area at which Line 2 (along Avenida John F. Kennedy, a major throughway in the city that turns into Duarte Highway, connecting the city with Santiago) was being built.

Line 2 runs east–west under Avenida John F. Kennedy from the westernmost metropolitan stretch of the city to the eastern part of the city. The line would be underground in its entire course and intersect Line 1 in the heart of the city. Line 2 will cost about twice as Line 1 to complete because of its length. The economic burden that it would place on the national budget caused the decision, which was officially announced in September 2009, to construct it in two phases.

The first phase will be from Los Alcarrizos to Puente de la 17,[10] where it will cross the first line. A second phase will complete the line from Puente de la 17 to San Isidro, in the eastern portion of Santo Domingo Este. Images gathered in news sites and forums show that construction is more advanced than what the government initially wanted to inform the press. Ultimately, the project has been reduced to ensure the conclusion and operation of a second line by the end of the 2008-2012 presidential term. Line 2 will operate from a station at Avenida Gregorio Luperón to a station before Puente de la 17, at Avenida Francisco del Rosario Sánchez.

Line 2 opened on April 1, 2013. An approval for an expansion of the second line was issued January 2014, and construction began on April 1, 2014. The extension was completed and was officially opened on August 8, 2018.[11]

Rolling stock

The French firm Alstom supplied a total of 19 Alstom Metropolis 9000 three-car trainsets (57 cars) from its factories in Belgium, France and Spain in a contract worth 92.5 million euros. The cars are almost identical to the 9000 series on the Barcelona Metro except for the livery.[12] In January 2011, an order was announced for a further 15 Alstom trainsets for Line 2.[13] In January 2023, an order was announced for the supply of a further 10 three-car Alstom Metropolis trainsets. Once delivered, the total number of trainsets in the fleet will be brought to 64.[14]

The first train was shipped from Barcelona in December 2007 and arrived on January 3, 2008. The standard gauge units have air-conditioning, CCTV, and passenger information and can accommodate 617 passengers per trainset.[15] The trains initially consist of three cars, but all stations are being built to accommodate six-car trains in anticipation of expected future ridership demand. Seventeen trainsets will normally be in service, with two sets as spares.[16]

Unlike many rapid transit systems, Santo Domingo Metro trains do not collect power from a third rail, as trainsets collect their power from an overhead line system.

Station locations

See main article: List of Santo Domingo Metro stations.

valign=top width=50%
Line 1[17]
14.5km (09miles)
Villa Mella to Centro de los Héroes
16 stations
valign=top width=50%
Line 2[18]
16.5km (10.3miles)
Ave. Luperón to Carretera Mella
18 stations
valign=top valign=top

Boleto Viajero

Boleto Viajero
Location:Greater Santo Domingo
Launched:2009
Service 1:Santo Domingo Metro
Sales Location 1:Santo Domingo Metro stations
Currency:DOP
Stored Value:Viajes
Credit Expiry:None
Technology 1:MIFARE Classic / MIFARE Ultralight
Operator:Thales
Manager:OPRET

The Boleto Viajero is a reloadable contactless smart card used for electronic transit fare payment by riders of the Santo Domingo Metro.

The card can be acquired in a Santo Domingo Metro station for DOP$60 with a minimum reload of 5 rides (DOP$100). It is offered as an alternative to the single-use cardboard cards. Even though the cardboard cards have a lower initial cost (DOP$15), they cannot be reloaded and must be discarded after their use.

Although OPRET lists price amounts against number of rides (viajes), the card records its balance in DOP. A bonus is also provided for 10 or 20 ride reloads.

Rides Cost Card balance
1 DOP$20 DOP$20
10 DOP$185 DOP$200
20 DOP$360 DOP$400

As identification is not required to purchase the card, and Boleto Viajero cards cannot be registered. OPRET does not refund users in the event of loss or damage. The card must be reloaded in person at a ticket vending booth, as OPRET does not offer Internet or phone-based top-up services. Automatic top-ups are also not available.

The Boleto Viajero cards are based on NXP MIFARE Classic chips and can be read by any ISO/IEC 14443 Type A reader. The single-use cardboard cards as of 2022 use NXP MIFARE Ultralight. However, only the card's manufacturer information (sector 0) is readable by the general public, as all of the remaining blocks are encrypted by using an unknown key.

Network map

See also

External links

Notes and References

  1. Web site: Informe de Evolución de la Demanda Diciembre 2014 . Dirección de Operaciones Metro de Santo Domingo [Directorate of Operations Santo Domingo Metro] . es . Report on Changes in Demand December 2014 . 11 . January 7, 2015 . 2015-04-01.
  2. Web site: Informe de Evolución de la Demanda Diciembre 2014 . Dirección de Operaciones Metro de Santo Domingo [Directorate of Operations Santo Domingo Metro] . es . Report on Changes in Demand December 2014 . 7 . January 7, 2015 . 2015-04-01.
  3. Web site: Estadísticas de peaje y tiempo de recorrido al 2013 . Oficina para el Reordenamiento de Transporte (OPRET) . opret.gob.do . es . Statistics of tolls and times of route 2013 . 2 . 2013-09-17.
  4. Web site: El Metro redefinirá la dominicanidad, según Diandino Peña . La Verdad . es . The Metro redefines the Dominicans, according to Diandino Peña . January 30, 2009.
  5. Santo Domingo metro enters service . . January 30, 2009 . 2015-04-01 . dead . https://web.archive.org/web/20140302142303/http://www.railwaygazette.com/news/single-view/view/santo-domingo-metro-enters-service.html . March 2, 2014.
  6. Web site: Robert. Schwandl . Santo Domingo . UrbanRail.net . 2015-04-01.
  7. News: Anabel. Rosario . Gobierno reiniciará la II Línea del Metro . El Nuevo Diario . es . Government restarts Metro Line 2 . February 10, 2013 . 2015-04-01.
  8. News: Diario. Libre . Comienzan excavaciones para extensión de la segunda línea del Metro . Metro de Santo Domingo (Blog) . es . Excavations begin for extension of the second line of the Metro . April 1, 2014 . 2015-04-01.
  9. News: NOMBRES POLÍTICOS ESTACIONES - Ministro de Madrid dice el Metro de Santo Domingo está a nivel del que funciona en España . La República . February 25, 2008 . 2008-02-25 . dead . https://web.archive.org/web/20080306114712/http://www.listindiario.com/app/article.aspx?id=49414 . March 6, 2008.
  10. Web site: Puente Francisco del Rosario Sánchez.
  11. Web site: Commuters flock to new Metro Line by the thousands . August 9, 2018. DominicanToday.com . August 13, 2018.
  12. City News July 2006 . . July 1, 2006 . 2015-04-01.
  13. Web site: World rolling stock market January 2011 . January 7, 2011 . 2015-04-01.
  14. Web site: Alstom signs a new contract to supply Metropolis trains to the Santo Domingo Metro . Alstom . January 11, 2023 . 2023-01-18.
  15. Santo Domingo metro delivery . . December 18, 2007 . 2015-04-01.
  16. Web site: ALSTOM to deliver Santo Domingo's first metro . Alstom . June 2006 . 2015-04-01.
  17. Web site: Línea 1 . Oficina para el Reordenamiento de Transporte (OPRET) . es . Line 1 . 2013-09-17 . dead . https://web.archive.org/web/20131021163517/http://www.opret.gob.do/Linea1.aspx . 2013-10-21 .
  18. Web site: Línea 2 - 1ra Etapa . Oficina para el Reordenamiento de Transporte (OPRET) . es . Line 2 - 1st Stage . 2013-09-17 . dead . https://web.archive.org/web/20130930083213/http://www.opret.gob.do/Linea2.aspx . 2013-09-30 .