Mequinenza Dam Explained

Mequinenza Dam
Name Official:Presa de Mequinenza
Location Map:Spain
Coordinates:41.369°N 0.2734°W
Location:Province of Zaragoza, Spain
Purpose:Power
Status:O
Construction Began:1957
Opening:1964
Owner:Endesa
Operator:Endesa
Dam Type:Concrete gravity dam
Dam Crosses:Ebro
Dam Height Foundation:79m (259feet)
Dam Length:461m (1,512feet)
Dam Elevation Crest:124m (407feet)
Dam Volume:1100000m2
Spillway Type:Over the dam
Spillway Capacity:11000m3/s
Res Capacity Total:1530000000m2
Res Surface:75.4km2
Res Max Length:110km (70miles)
Res Max Width:600m (2,000feet)
Res Max Depth:62m (203feet)
Res Elevation:121m (397feet)
Plant Commission:1966
Plant Turbines:4 x 96 MW Francis-type
Plant Capacity:384 MW

Mequinenza Dam (Spanish; Castilian: Presa de Mequinenza|links=no) is a concrete gravity dam in the province of Zaragoza, Spain. It impounds the Ebro creating a large reservoir, which is called Mar de Aragón. About 35 km downstream of Mequinenza dam is Ribarroja dam.

Empresa Nacional Hidroeléctrica del Ribagorzana S.A. (ENHER) was mandated in 1955 by Instituto Nacional de Industria (INI) to build two dams on the Ebro near Mequinenza and Ribarroja. Work on Mequinenza dam started in 1957. The filling of the reservoir began in December 1965. The power plant was operational in 1964 (1966). ENHER was acquired by Endesa in 1999.

Dam

Mequinenza Dam is a 79 m tall (height above foundation) and 461 m long gravity dam with a crest altitude of 124 m. The volume of the dam is 1,100,000 m3. The dam features a spillway with 6 gates over the dam (maximum discharge 11,000 m3/s) and one bottom outlet (maximum discharge 160 m3/s).

Reservoir

At full reservoir level of 121 m.a.s.l. the reservoir has a surface area of 75.4 km2, a total capacity of 1.53 billion m3 and a length of almost 110 km. The average width of the reservoir is about 600 m, its maximum (average) depth is 62 (20) m.

Power plant

The power plant contains 4 Francis turbine-generators. The initial nameplate capacity was 81 MW each. The turbines, generators and transformers were refurbished from 2007 until 2010 raising the capacity of the new machines to 96 MW each. Maximum flow is 150 m3/s per turbine.