Commissioned:2003
Owner:Leeward Renewable Energy
Wind Farm Type:Onshore
Ps Units Operational:29 x 2.625 MW
Ps Units Manu Model:SiemensGamesa G126
Ps Storage Capacity:76 MW

The Mendota Hills Wind Farm is a wind farm in Lee County, Illinois near the village of Paw Paw. It operates 29 wind turbines. Each wind turbine stands 214 ft (65.23 m) tall and has three 85 ft (35.91 m) long blades. The wind farm was constructed from June 2003 to November 24, 2003. Mendota Hills was the first utility-scale wind farm in the state of Illinois.

Description

The Mendota Hills Wind Farm originally consisted of 63 Gamesa G52-800 kW wind turbines, each costing around US$1 million. Each turbine stands tall and has a diameter of across the rotor, the two ton rotors spin at 25 rpm. Each of the three blades measure 83 ft (25.91 m) long.

In 2019, the wind farm reduced the number of turbines to 29, but increased the nameplate capacity to 76 MW.[1]

The turbine towers are spread out over of Lee County, Illinois, near the village of Paw Paw and adjacent to Interstate 39. The wind farm was developed by Navitas Energy, and is now owned and operated by Leeward .[2] Energy produced at Mendota Hills is sold to Commonwealth Edison. Each tower has a 2.5 megawatt capacity giving a total capacity at Mendota Hills Wind Farm of 72.6 megawatts. The site produces enough power (approximately 110 million kilowatt hours annually) to power about 13,000 homes.29 SG126-2.5's were put up on their place in 2019[3]

History

The Mendota Hills Wind Farm's beginnings are rooted in the spring of 2002 when land owners were first approached about the wind towers. For the two years previous to that wind metering had been taking place in the area where the wind farm is located today. Construction could only begin, in June 2003, after a series of environmental and archaeological tests and approval from the Lee County Zoning Board. Construction on the wind farm was complete by November 2003 and the Mendota Hills Wind Farm officially went online on November 24, 2003.[4] Landowners and farmers are compensated by the developer, Navitas Energy of Minneapolis, Minnesota, on a contractual basis. Most landowners are paid US$1,200 to $1,500 per megawatt of electricity produced on each tower.[5]

See also

Notes and References

  1. Web site: Mendota Hills Wind - Leeward Energy . 2023-09-24 . www.leewardenergy.com . en-US.
  2. Web site: U.S. Portfolios. Infigen Energy. 29 October 2013. dead. https://web.archive.org/web/20140204105719/http://www.infigenenergy.com/our-business/us-portfolios.html. 4 February 2014.
  3. Web site: Leeward partners with Siemens Gamesa to repower Illinois' Mendota Hills Wind Farm.
  4. Web site: Mendota Hills Wind Farm. Navitas Energy. 29 October 2013. https://web.archive.org/web/20050208051913/http://www.windpower.com/projects_detail.cfm?ProjectID=19. 8 February 2005.
  5. Clark, Carol, "Local residents take a whirlwind tour," Galesburg Register Mail, via Western Illinois Economic Development Commission. Retrieved 1 July 2007.