Marseille Metro Explained

Marseille Metro
Imagesize2:275px
Native Name:Métro de Marseille
Locale:Marseille, France
Transit Type:Rapid transit
Lines:2
Stations:31
Ridership:210,200 (daily avg., 2012)
Annual Ridership:76.7 million (2012)
Operator:RTM
System Length:22.71NaN1

The Marseille Metro (French: Métro de Marseille) is a rapid transit system serving Marseille, France. The system comprises two lines, partly underground, serving 31 stations, with an overall route length of 22.7km (14.1miles).[1] Line 1 opened in 1977, followed by Line 2 in 1984. Two stations, Saint-Charles and Castellane, each provide interchange between lines.

The system's MPM 76 trains use the rubber-tyred metro technology developed by the RATP for some lines of the Paris Métro. In 2012, the Marseille Metro carried approximately 76.7 million passengers,[2] making it a core part of the transport network in the Marseille urban area, with 49% of journeys using the metro. Since 1986, the Régie des transports métropolitains (Régie des transports de Marseille until 2016) has operated the network, operating it since it changed its name on behalf of the Aix-Marseille-Provence Metropolis.

Timeline

DateLineEvent
26 November 1977 align=center rowspan=2 Line 1First section opened between La Rose and Saint-Charles
11 March 1978 Extended southwards from Saint-Charles to Castellane
3 March 1984 align=center rowspan=3 Line 2 Section opened between Joliette and Castellane
1 February 1986 Extended southwards from Castellane to Sainte-Marguerite Dromel
14 February 1987 Extended northwards from Joliette to Bougainville
5 September 1992 align=center rowspan=2 Line 1Extended eastwards from Castellane to La Timone
5 May 2010 Extended eastwards from La Timone to La Fourragère
16 December 2019 align=center rowspan=2 Line 2 Extended northwards from Bougainville to Gèze
Before 2030 Planned extension eastwards from Sainte-Marguerite Dromel to Saint-Loup Pagnol with 6 new stations, between 4.1km (02.5miles) and 4.6km (02.9miles)[3]
After 2030 align=center Line 3Planned opening between Luminy and Saint-Charles with 15 new stations, between 9.6km (06miles) and 10km (10miles)

History

The first plans for a metro system in Marseille appeared in the early years of the 20th century, following the opening of the Paris Métro. Many plans were put forward, but quickly abandoned due to lack of financing. The most serious proposal emanated in 1918 from the Compagnie d'électricité de Marseille, which proposed to build an underground network similar to the Paris métro. This proposal was met with fierce opposition from the Compagnie générale française de tramways, which owned and operated the city's tramway system. This project ultimately failed, and the idea of building a metro in Marseille was abandoned for many decades.

Several proposals came immediately before and after the Second World War calling for modernizing the existing tramways with a network of lines running underground, but all were scrapped due to material shortages. Instead, the system, so badly damaged by the conflict, was almost completely dismantled during the following decade and replaced by buses (with the exception of line 68). However, by 1960, the city was suffering from severe congestion due to the growth in automobile use. A number of alternative concepts came forward at the time, including light rail or commuter train networks, but found no support among municipal authorities. It was not until 1964, when a project calling for a construction of an underground metro line to replace the busiest bus routes, that interest was aroused among elected officials. After several years of studies, the city council voted unanimously in 1969 for the creation of a metro system.

Construction of the first line started on August 13, 1973 and lasted until early 1977. Revenue operation started on November 26, 1977 on a portion of the line, between La Rose and Saint-Charles. The rest of the line opened on March 11, 1978. The plans for the second line were approved in 1978. Construction began in 1980. The central portion of the line, between Joliette and Castellane, opened on March 3, 1984. Southern and northern portions of the line were opened in February 1986 and February 1987 respectively.

Subsequent extensions took place in the following years. Line 1 was first extended between Castellane and La Timone on September 5, 1992 (2 new stations), and then between La Timone and La Fourragère (4 new stations) in 2010.[4] On 16 December 2019, line 2 was extended northwards from Bougainville to Gèze (1 new station).[5]

Current network

Rolling stock

The rolling stock comprises 36 4-car trains, named MPM 76.[6] Trains have a capacity of 472 passengers (including 182 seats). MPM 76 trains use the rubber tyre metro technology developed by the RATP for the Paris métro.

Trains were built in Valenciennes, France, by a group of French companies which are now part of Alstom group. A first batch of 21 3-car trains was delivered in 1976, for line 1. A second batch of 15 was delivered in 1983, for line 2. In 1985, a fourth car was added on every train, in order to increase capacity.

Commercial operation

The metro system is operated by the Régie des Transports Métropolitains, on behalf of the Urban Community of Marseille Provence Métropole, which owns the infrastructure as well as the rolling stock.

Service is open every day, from 5 am to 1 am the next day. Trains run every 3 minutes during rush hour, and every 10 minutes during evenings.

The metro system transported 76.7 million passengers in 2012, leading to an average daily ridership of over 210,000.

Planned developments

A 900m (3,000feet) long extension of line 2 to Capitaine Gèze was opened in December 2019, North of the current terminus station Bougainville.[7] [8] [9] The new Capitaine Gèze station will feature a bus station and a park and ride facility. This short extension will reuse existing service tracks that currently lead to the Zoccola depot. The cost is estimated to be 80 million euros.

A 5 km extension of line 2 to La Pomme railway station is planned for 2030. This extension will include 6 new stations.

Several other long-term extensions, including a northern extension of line 2 and a third line, are being considered.

In 2012, it was projected that the MPM76 rolling stock would be replaced starting in 2020.[10]

The new rolling stock built by Alstom will be gradually rolled out at the end of 2024 and will be operated first with a driver and then fully automatic when all the old trains are replaced. The new rolling stock will have open gangways and will have a frequency of 90 seconds. The stations will all be equipped with platform screen doors and retrofitted with accessibility.

See also

References

Bibliography

External links

Notes and References

  1. Web site: Fiche d’identité de l’Entreprise - LE METRO . rtm.fr . fr . ID card of the company - THE METRO . September 28, 2013.
  2. Web site: Fiche d’identité de l’Entreprise - LE TRANSPORT AU COEUR DE NOTRE MISSION : Un Réseau Intégré . rtm.fr . fr . ID card of the company - TRANSPORT AT THE HEART OF OUR MISSION: An Integrated Network . 28 September 2013.
  3. Web site: Marseille: Le prolongement de la ligne 2 du métro vers le sud sur de bons rails. 20 Minutes. 13 December 2016.
  4. News: Jean-Jacques Fiorito . Marseille : le métro s'offre quatre nouvelles stations . La Provence . May 5, 2010 . fr .
  5. News: RTM. Prolongement de la ligne de métro M2 à Gèze. December 16, 2019 . fr .
  6. Henri. Bochet. Le métro de Marseille. Revue générale des chemins de fer. Dunod. March 1980. 139–146. 0035-3183. fr.
  7. News: Annoncée en 2015, la station Gèze déraille jusqu'à septembre 2019 Marsactu. 2018-05-23. Marsactu. 2018-06-12. fr-FR.
  8. Web site: Julien. Vinzent. Bus, cars, voitures et vélos auront rendez-vous au futur métro capitaine Gèze. www.marsactu.fr. June 6, 2011. dead. https://web.archive.org/web/20111231025317/http://www.marsactu.fr/2011/06/06/bus-cars-voitures-et-velos-auront-rendez-vous-au-futur-metro-capitaine-geze/. December 31, 2011. mdy-all.
  9. News: Jean-Jacques . Fiorito . Marseille : et voici le futur terminus de la ligne 2 du métro . fr . La Provence . September 27, 2011.
  10. Web site: Julien . Vinzent . Le renouvellement du métro coûtera "plusieurs centaines de millions d'euros" . www.marsactu.fr . fr . May 25, 2012 . dead . https://web.archive.org/web/20120602051351/http://www.marsactu.fr/archi-et-urbanisme/le-renouvellement-du-metro-coutera-plusieurs-centaines-de-millions-deuros-27974.html . June 2, 2012 . mdy-all.