Marine Drive Tunnel Explained

Marine Drive Tunnel
Location:Kollupitiya
Status:Proposed
Start:Marine Drive, Kollupitiya
End:CIFC, near Sambodhi Chaithya
Owner:RDA

The Marine Drive Tunnel is tunnel, currently under construction, which will connect Marine Drive in Kollupitiya to the Colombo International Financial City (CIFC). The Cabinet of Sri Lanka has approved the signing of the MOU in January 2018.[1] [2]

Route

The tunnel would begin at the northern-end of Marine Drive, before connecting to the CIFC after passing under Galle Face Green. Preliminary assessments were completed to further extend the road connection to the Colombo Harbour and the New Kelani Bridge, where the existing E03 expressway begins, before terminating at the Bandaranaike International Airport. The extension may be built as a continuation of the tunnel or as an elevated highway. The construction of the tunnel will also further expand the Galle Face Green towards the ocean.

See also

External links

Notes and References

  1. News: Two MOUs with China to build complex in Port City, underground Marine Drive. 18 February 2018. Daily News. 27 January 2018. DailyNews Jan27.
  2. News: Dissanayake. Chathuri. Govt. green-lights PPP for Port City tunnel link. 18 February 2018. Daily FT. 14 December 2017.