Marcy South Explained

Marcy South
Country:United States
State:New York
Start:Marcy Substation
Finish:Fraser Substation / Coopers Corners Substation
Owner:New York Power Authority
Current Type:AC
Ac Voltage:345,000
Circuits No:2

Marcy South is a 2 circuit high voltage power line in the U.S. State of New York. Each circuit is 345,000 volts, the one circuit runs from Fraser Substation in Delaware County to Marcy Substation in Oneida County and the other circuit runs from Coopers Corners Substation to the Marcy Substation. It was constructed amid heavy controversy in the late 1980s by the New York Power Authority.[1]

History

The Power Authority of the State of New York announced plans to deliver hydroelectric power from Canada to the New York City region in 1982.

It became fully operational on June 1, 1988.

Controversy

The power line met with vigorous and sometimes highly contentious and violent opposition from local property owners from its proposition to its planning and surveying, and even its construction.[1]

Power grid improvement

The Marcy South Series Compensation Project began in 2016 and involved the installation of three series capacitor banks. The capacitor banks were installed to raise the voltage and keep it constant, which enhances transmission efficiency. Two capacitor banks were installed by New York Power Authority, the other installed by NYSEG at the Fraser Substation.[2]

Future plans

Since its construction, other projects including a high-voltage DC line have been proposed for the same route.