Malta–Sicily interconnector explained

Malta–Sicily interconnector
Country:Malta
Italy
Direction:north-south-north
Start:Magħtab, Naxxar in Malta
Through:Malta Channel
Finish:Ragusa in Sicily, Italy
Owner:Enemalta
Cable Manufacturer:Nexans
Cable Layer:C/S Nexans Skagerrak
Est:2015
Construction Cost:€182 million
Type:Submarine cable
underground cable
Current Type:HVAC
Length:120
Capacity:200 MW
Ac Voltage:220 kV

The Malta–Sicily interconnector is the submarine power cable which connects the power grid of Malta with the Italian Transmission Network managed by Terna, which is part of the European grid. It was constructed in 2014-2015, and supplies roughly of Malta's electrical power.

Technical characteristics

The 95km (59miles) long subsea cable starts at Magħtab, Qalet Marku in Malta and it runs to Marina di Ragusa in Sicily, Italy.[1] From there it is connected to the Ragusa substation, which is of the Italian TSO Terna, via a underground cable.

The cable and 132/220 kV substation in Malta is provided by Nexans. The cable has capacity of 200 MW and it uses 220 kV high voltage alternating current. The interconnector is operated by Enemalta, the Maltese power company.[2] [3] In the 2014 the cable was laid in the sea by the ship C/S Nexans Skagerrak of the Company Nexans.[4] The interconnector became operational in March 2015. The project cost €182 million.[5]

Economic impact

The cable allows Malta to exchange electricity with the Italian power market, i.e. the island can both import and export electricity from Italy through the interconnector. The creation of this subsea cable ended Malta's previous electricity's isolation and diversified its mix of energy sources. In February 2015, European Commission underlined that Malta's interconnection level would go from 0% to approximately 35% with the new interconnector.[6]

Problems

In December 2019 power outages in Malta were being caused by a failure of the interconnector cable having been damaged by a ship's anchor. In 2019 the interconnector supplied 23.1% of generated power.[7]

Sites

SiteCoordinates
36.8797°N 14.6814°W
36.78°N 14.5694°W
Maltese submarinecable terminal, Qalet Marku 35.9433°N 14.4497°W
Substation in Magħtab (in project)35.9386°N 14.4381°W

See also

External links

Notes and References

  1. News: Malta signs €182 million interconnector contract . Kurt . Sansone . Times of Malta . 2010-12-15 . 2012-02-12.
  2. News: Power setback as energy link to Sicily is delayed . Mark . Micallef . Times of Malta . 2011-11-20 . 2012-02-12.
  3. News: Sicily cable 'essential' to close down Marsa power station . James . Debono . Malta Today . 2009-11-22 . 2012-02-12.
  4. Nexans wins contract for the Malta to Sicily power-interconnector project . Nexans . 2010-12-15 . 2012-02-12.
  5. News: Nexans Norway to lay Malta-Sicily undersea power cable . Reuters . 2010-12-14 . 2012-02-12.
  6. https://eur-lex.europa.eu/resource.html?uri=cellar:a5bfdc21-bdd7-11e4-bbe1-01aa75ed71a1.0003.01/DOC_1&format=PDF COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL - Achieving the 10% electricity interconnection target - Making Europe's electricity grid fit for 2020
  7. How could a ship's anchor take out a key source of Malta’s power? . Times of Malta . 2020-01-01 . 2020-01-01.