Kent Downs line explained

Kent Downs line
Type:Suburban rail, Heavy rail
System:National Rail
Status:Operational
Locale:Kent
South East England
Start:Otford
End:Ashford international
Owner:Network Rail
Operator:Southeastern
Thameslink
Stock:Class 375 "Electrostar"
Class 465 "Networker"
Class 466 "Networker"
Class 700 "Desiro City"
Linelength:[1]
Electrification:750 V DC third rail
Map State:uncollapsed

The Kent Downs line is a railway line between Otford and Ashford International in Kent, England. It adopted its current name in 2020, by the Kent Rail Partnership.

It covers a large part of what was known as the Maidstone line which extended further from Otford to Swanley.[2] [3] This line diverged from the Chatham Main Line at Swanley Junction, and proceeds down the Darent Valley line[4] to Otford junction,[5] where the Darent Valley line, also known as the Bat & Ball line, divides towards . Whereas the line now known as Kent Downs, continues via Borough Green & Wrotham and Maidstone East to Ashford, where it joins the South Eastern Main Line.[6]

History

The line was built by the London, Chatham and Dover Railway from their first line (the Chatham Main Line). The final section to Ashford opened on 1 July 1884 and terminated at . There was initially no direct connection to the rival South Eastern Railway's existing station.Upon the creation of the South Eastern and Chatham Railway in 1899, Ashford West was closed and services diverted to the former South Eastern Railway station. The line was electrified in 1939 (750 V DC third rail) to Maidstone East by the Southern Railway prior to World War Two. Electrification between Maidstone East and Ashford was completed in 1961 under the BR 1955 Modernisation Plan.

In 2020 the line from Ashford International to was adopted by the Kent Rail Partnership and this section was renamed the Kent Downs line.[7]

Infrastructure

Traction current is supplied at 750 volts DC via the Third Rail. The supply for this is overseen by Paddock Wood Electrical Control Room. Signalling is Track Circuit Block with multiple aspect colour light signals throughout, controlled by Maidstone East Signal Box. The line is double track throughout.

Services

Services on the line are run by Southeastern.Services run to London Victoria, London Charing Cross and Ashford, with some peak services to London Blackfriars.

In the off-peak, there are one train per hour from Ashford International to London Victoria via Bromley South and Swanley stopping at all stations between Ashford and Otford and one train per hour from Maidstone East to London Charing Cross running semi-fast via Swanley and London Bridge. These services are operated by Class 375 and Class 377 EMUs.

Thameslink utilises the route between Swanley and Otford on their London Blackfriars to Sevenoaks metro services via the Catford Loop and Elephant and Castle with two trains per hour running. Additional services through London will be introduced as part of the Thameslink Programme between Cambridge and Maidstone East. As of June 2024, these services have not yet been introduced with no news about their future.[8]

References

Notes and References

  1. Web site: SBJ mileages .
  2. Book: Network Rail . Network Rail . Southern Appendix. Module SO . Apr 2001 . A0260A03 . 1/12. Retrieved 12 January 2012
  3. Quail Map 5 – England South & London Underground [pages 6,7 & 11A ] February 1998 (Retrieved 12 January 2012)
  4. Web site: Darent Valley CRP . Thameslink.
  5. Book: Network Rail . Network Rail . Southern Appendix. Module SO . Apr 2001 . A0260A03 . 1/64. Retrieved 12 January 2012
  6. Book: Network Rail . Network Rail . Southern Appendix. Module SO . Apr 2001 . A0260A03 . 1/54. Retrieved 12 January 2012
  7. Web site: KDL. 15 February 2022. en-GB.
  8. News: 20 September 2019. Further delay for 'long-suffering' rail users. en-GB. BBC News. 30 July 2020.