Maha Chesadabodindranusorn Bridge Explained

Bridge Name:Maha Chesadabodindranusorn Bridge
Carries:6-lane extradosed concrete bridge
Crosses:Chao Phraya River
Locale:Nonthaburi, Thailand
Design:Extradosed bridge
Mainspan:200 m
Length:460 m
Begin:May 2012
Complete:December 2014
Coordinates:13.8543°N 100.4798°W

Maha Chesadabodindranusorn Bridge (Thai: สะพานมหาเจษฎาบดินทรานุสรณ์,[1] [2], in Thai pronounced as /sa.pʰāːn ma.hǎː.t͡ɕèːt.sa.dāː.bɔ̄(ː).dīn.tʰrāː.nú.sɔ̌ːn/) is an extradosed bridge[3] in area of Mueang Nonthaburi District in Nonthaburi Province, Thailand, over the Chao Phraya River. The bridge is the first extradosed bridge in Thailand. It is located between Phra Nangklao Bridge (upstream) and Rama V Bridge (downstream), connects Nonthaburi 1 Road, on the east side of the river, and Bang Si Mueang - Wat Bot Don Phrom Road and Ratchaphruek Road, on the west side of the river.[4] The bridge was named after King Nangklao, one of whose titles before his accession to the throne was "Prince Chesadabodin".[5]

The project has a total length of approximately 4.3km (02.7miles), consisting of an interchange at Nonthaburi 1 Road, a 6-lane extradosed concrete bridge with 200m (700feet) long main span and the total length of 460m (1,510feet), an intersection at Bang Si Mueang - Wat Bot Don Phrom Road, and a 6-lane at-grade road to an interchange at Ratchaphruek Road. Construction began in May 2012, after having been delayed for two years, and took around thirty months. It is a part of the completed main road linking network developed by the Department of Rural Roads (DRR) in the area on the west side of the river, to ease the traffic on Rama V Bridge, Phra Nangklao Bridge and Rama IV Bridge.

Notes and References

  1. Web site: Summary of Accomplishments of the Ministry of Transport for the Period of 6 Months. th:รายงานผลการดำเนินงานตามนโยบาลรัฐบาลรอบ 6 เดือน. 2015 . 2015-04-28 . [n.p.] . Ministry of Transport. Thai .
  2. News: พระราชทานชื่อสะพานนนท์ฯ1"สะพานมหาเจษฎาบดินทรานุสรณ์". 4 May 2015. ASTV Manager Online. 3 May 2015.
  3. Web site: สะพานมหาเจษฎาบดินทร์ฯ. May 2015.
  4. Web site: ประกวดราคาจ้างก่อสร้างโครงการก่อสร้างสะพานข้ามแม่น้ำเจ้าพระยาบริเวณถนนนนทบุรี 1 . usurped. https://web.archive.org/web/20110714192140/http://www.nonthaburi1bridge.com/. th. 14 Jul 2011. 2010-07-07 .
  5. Web site: สะพานมหาเจษฎาบดินทร์ หรือสะพานนนทบุรี 1 จ.นนทบุรี. July 2018.