Magallanes Renovables Explained

Magallanes Renovables, S.L.
Industry:Tidal turbines
Founded:2009
Founder:Alejandro Marqués de Magallanes
Subsid:Magallanes Tidal Energy Ltd.

Magallanes Renovables, S.L. is a Spanish developer of floating tidal stream energy devices, set up in 2009.[1] The company's head office is in Redondela, Galicia, with a UK subsidiary Magallanes Tidal Energy Ltd. based in Kirkwall.

They have tested their concept at the European Marine Energy Centre (EMEC) in Orkney, Scotland at small scale in 2014, and at full-scale since 2019.

In 2022, they were amongst the first tidal stream developers to be awarded market support for commercial projects in the UK, under the Contracts for Difference (CfD) scheme.

Device concept

ATIR
Rated power1500 kW
Weight350 t
Dimensions (length/breadth/draft)45 m / 6 m / 25 m
Rotors2 (counter-rotating)
Rotor diameter & separation19 m, 1 diameter
Rotor rated speed17 rpm
Pitchvariable (0° to 270°)
Gearbox ratio98
Generators2 × 850 kW @ 690 V
Generators rated speed1600 rpm
Converters2 × 900 kW AC/AC
The Magalanes ATIR is a floating platform, like a ship's hull, which is moored in place by lines at the bow and stern.[2] Under the water, about 15m (49feet) below the hull, two three-bladed counter-rotating turbines are mounted at either end of a common driveshaft. These power the generators, which capture the energy of the tides flowing past.[3] The design of the platform is modular, to make construction easier and cheaper.

The hull is symmetrical fore-aft, and both rotors are variable pitch, allowing the device to capture both the ebb and flood tide directions without being moved. The counter-rotating design improves efficiency, as the aft turbine captures some more energy from the slipstream of the first turbine, it also helps balance the torque reaction.[4]

The novel device has been built using methodologies and experience from other related sectors, including naval architecture, offshore wind power, oil & gas. The design of the platform allows for access to the machinery during operation, without the need to disconnect the turbine.

The ATIR 2.0 device design has been certified with a "Basic Design Assessment" by Bureau Veritas.[5] [6]

History

The company was founded in 2009 by Alejandro Marques de Magallanes.

In 2013–2014, a small-scale version of the ATIR device was tested at the EMEC nursery test site in Shapinsay Sound, although this was not grid-connected.[7] The sea trials commences on 28 November 2013. The device was 1:10 scale, 6m (20feet) long and 2.3m (07.5feet) wide, with a three-hull Trimaran design,[8] however subsequent versions only have a single hull. The project reportedly cost 1.2m$US (about £0.73m, €0.89), funded through the European Marine Renewables Infrastructure Network (Marinet) project, government agencies in Spain, and private investors.

ATIR testing at EMEC

In 2019, the 1.5 MW ATIR device was deployed at the EMEC Fall of Warness site, near the island of Eday.[9] It was deployed in February and connected to the electricity grid in March 2019, generating power shortly after.[10] [11]

This device has two 19m (62feet) diameter rotors mounted below a 45m (148feet) long hull.[12]

The device was constructed in Spain in the Ria de Vigo and launched in 2017 followed by a period of tow testing in Vigo bay. More than 20 tests were carried out in seven towing operations. The device generated up to 450 kW, limited by the power of the tug. It was then towed to Orkney in September 2018, after which it was installed and tested at EMEC. In 2020, the device was towed to Edinburgh for maintenance in the Imperial Dry Dock at the Port of Leith, before returning to site in April 2021. To enter the dock, the device had to be tipped onto its side using buoys.[13]

The testing at EMEC was initially funded through the European OCEAN_2G project (Second Generation technologies in ocean Energy) coordinated by SAGRES SL, the parent company of Magallanes Renovables.[14] Further funding through the Interreg OceanDEMO and the MaRINET2 projects allowed the testing to be extended beyond the initial two years.

First commercial projects

Magallanes Tidal Energy has been awarded Contracts for Difference (CfD) in Allocation Rounds AR4–AR6 to supply subsidised electricity to the GB National Grid for several projects. These include a farm of six turbines at Morlais, North Wales, and three more at EMEC in Orkney, Scotland, as shown in the table below.[15] [16]

These will use the second-generation ATIR 2.0 device, which Magallanes completed the engineering design of in 2023.[17]

!CfD Allocation Round!Location!Total Capacity (MW)!Delivery Year!Strike Price (£/MWh)!Ref.
AR4, July 2022Morlais5.622025/26 178.54[18]
AR5, September 2023Morlais3.02027/28198.00[19]
EMEC1.5
AR6, September 2024EMEC3.02028/29172.00[20]

Future plans

Magallanes hope to install their devices in other locations, including Spain, noting that the Strait of Gibraltar has significant potential.

References

  1. Web site: Magallanes Renovables: Unlocking energy from tidal power . 21 December 2023 . Magallanes Renovables . en-US .
  2. Web site: 10 September 2018 . Magallanes' floating tidal turbine on its way to Orkney . 13 October 2024 . Offshore Energy . en-US .
  3. Web site: 25 March 2019 . Tidal energy pioneers see vast potential in ocean currents' ebb and flow . 13 October 2024 . NBC News . en .
  4. Díaz-Dorado . Eloy . Carrillo . Camilo . Cidras . Jose . Román . David . Grande . Javier . 21 January 2021 . Performance evaluation and modelling of the Atir marine current turbine . IET Renewable Power Generation . en . 15 . 4 . 821–838 . 10.1049/rpg2.12071 . 1752-1416 . free . 2021IRPG...15..821D .
  5. Web site: Passover . Alejandra . 4 March 2024 . La gallega Magallanes Renovables levantará en la costa de Gales el primer parque mareomotriz del mundo . Galician Magallanes Renovables will build the first tidal park in the world on the coast of Wales . 12 October 2024 . La Voz de Galicia . es .
  6. Web site: 18 March 2024 . Magallanes Renovables obtiene la certificación del diseño de su plataforma de energía mareomotriz . Magallanes Renovables gets certification of design for its tidal energy platform . 13 October 2024 . Forbes España . es .
  7. Web site: Marthinsen . Stig . Magallanes reinstall ATIR tidal turbine at EMEC, Interreg VB North Sea Region Programme . 21 December 2023 . northsearegion.eu .
  8. Web site: 1 December 2014 . Spain enters commercialization of tidal energy with US$1.2 million ATIR prototype . 13 October 2024 . Hydro Review . en-US .
  9. News: Davidson . John . 27 February 2020 . Bright future on Horizon for ocean pioneers . 13 October 2024 . Inverness Courier . en .
  10. Web site: 5 March 2019 . Magallanes tidal power project sends first electricity to UK power grid . 13 October 2024 . Power Engineering . en-US .
  11. Annual Report. An overview of ocean energy activities in 2019 . IEA-OES . March 2020 . The Executive Committee of Ocean Energy Systems . 126 .
  12. Web site: Magallanes Renovables ATIR at EMEC Tethys . 21 December 2023 . tethys.pnnl.gov .
  13. Web site: 23 April 2021 . Magallanes tidal unit reinstalled at EMEC . 21 December 2023 . ReNEWS.biz .
  14. Web site: Second Generation technologies in ocean Energy OCEAN_2G Project Fact Sheet H2020 . 13 October 2024 . CORDIS . European Commission . en .
  15. Web site: Beatriz . Miranda . 27 June 2024 . Entrevista a Magallanes Renovables . Interview with Magallanes Renovables . 13 October 2024 . Interempresas . es .
  16. Web site: Perry . Mathew . 4 September 2024 . AR6 delivers six tidal stream projects with UK pipeline 'confidently growing' . 13 October 2024 . Energy Voice . en-US .
  17. Annual Report. An overview of ocean energy activities in 2023 . IEA-OES . February 2024 . The Executive Committee of IEA Ocean Energy Systems . 23, 200 .
  18. Web site: 7 July 2022 . Contracts for Difference (CfD) Allocation Round 4: results . 26 November 2023 . GOV.UK . en .
  19. Web site: 8 September 2023 . Contracts for Difference (CfD) Allocation Round 5: results . 26 November 2023 . GOV.UK . en .
  20. Web site: 3 September 2024 . Contracts for Difference (CfD) Allocation Round 6: results . 12 October 2024 . GOV.UK . en .
  1. Web site: Magallanes Renovables: Unlocking energy from tidal power . 21 December 2023 . Magallanes Renovables . en-US .
  2. Web site: 10 September 2018 . Magallanes' floating tidal turbine on its way to Orkney . 13 October 2024 . Offshore Energy . en-US .
  3. Web site: 25 March 2019 . Tidal energy pioneers see vast potential in ocean currents' ebb and flow . 13 October 2024 . NBC News . en .
  4. Díaz-Dorado . Eloy . Carrillo . Camilo . Cidras . Jose . Román . David . Grande . Javier . 21 January 2021 . Performance evaluation and modelling of the Atir marine current turbine . IET Renewable Power Generation . en . 15 . 4 . 821–838 . 10.1049/rpg2.12071 . 1752-1416 . free . 2021IRPG...15..821D .
  5. Web site: Passover . Alejandra . 4 March 2024 . La gallega Magallanes Renovables levantará en la costa de Gales el primer parque mareomotriz del mundo . Galician Magallanes Renovables will build the first tidal park in the world on the coast of Wales . 12 October 2024 . La Voz de Galicia . es .
  6. Web site: 18 March 2024 . Magallanes Renovables obtiene la certificación del diseño de su plataforma de energía mareomotriz . Magallanes Renovables gets certification of design for its tidal energy platform . 13 October 2024 . Forbes España . es .
  7. Web site: Marthinsen . Stig . Magallanes reinstall ATIR tidal turbine at EMEC, Interreg VB North Sea Region Programme . 21 December 2023 . northsearegion.eu .
  8. Web site: 1 December 2014 . Spain enters commercialization of tidal energy with US$1.2 million ATIR prototype . 13 October 2024 . Hydro Review . en-US .
  9. News: Davidson . John . 27 February 2020 . Bright future on Horizon for ocean pioneers . 13 October 2024 . Inverness Courier . en .
  10. Web site: 5 March 2019 . Magallanes tidal power project sends first electricity to UK power grid . 13 October 2024 . Power Engineering . en-US .
  11. Annual Report. An overview of ocean energy activities in 2019 . IEA-OES . March 2020 . The Executive Committee of Ocean Energy Systems . 126 .
  12. Web site: Magallanes Renovables ATIR at EMEC Tethys . 21 December 2023 . tethys.pnnl.gov .
  13. Web site: 23 April 2021 . Magallanes tidal unit reinstalled at EMEC . 21 December 2023 . ReNEWS.biz .
  14. Web site: Second Generation technologies in ocean Energy OCEAN_2G Project Fact Sheet H2020 . 13 October 2024 . CORDIS . European Commission . en .
  15. Web site: Beatriz . Miranda . 27 June 2024 . Entrevista a Magallanes Renovables . Interview with Magallanes Renovables . 13 October 2024 . Interempresas . es .
  16. Web site: Perry . Mathew . 4 September 2024 . AR6 delivers six tidal stream projects with UK pipeline 'confidently growing' . 13 October 2024 . Energy Voice . en-US .
  17. Annual Report. An overview of ocean energy activities in 2023 . IEA-OES . February 2024 . The Executive Committee of IEA Ocean Energy Systems . 23, 200 .
  18. Web site: 7 July 2022 . Contracts for Difference (CfD) Allocation Round 4: results . 26 November 2023 . GOV.UK . en .
  19. Web site: 8 September 2023 . Contracts for Difference (CfD) Allocation Round 5: results . 26 November 2023 . GOV.UK . en .
  20. Web site: 3 September 2024 . Contracts for Difference (CfD) Allocation Round 6: results . 12 October 2024 . GOV.UK . en .