Madavara metro station explained

Madavara
Style:Namma Metro
Address:Madavara, Bengaluru, Karnataka, 560073
Coordinates:13.0574°N 77.4714°W
Structure:Elevated, Double track
Platform:Side platform
Platform-1 → Train Terminates Here
Platform-2 → Silk Institute
Levels:2
Tracks:2
Parking:(TBC)
Electrified:750 V DC third rail
Accessible:(TBC)
Status:Final Stages before Operations
Code:(TBC)
Owned:Bangalore Metro Rail Corporation Ltd (BMRCL)
Operator:Namma Metro
Former:BIEC
Map State:collapsed
Mapframe:yes
Mapframe-Marker:rail
Mapframe-Zoom:14

Madavara is an upcoming elevated northern terminal metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru International Exhibition Centre, an important Exhibition Centre for conducting different exhibition events, conferences from all over the world.

As per latest updates, the Madavara - Nagasandra stretch trial run was conducted on August 6 2024 and with successful trial run, this metro station is slated to be operational around end of September 2024 or beginning of October 2024.[1] [2]

Station layout

Station Layout (TBC)

GStreet levelExit/Entrance
valign=topL1valign=topMezzaninevalign=topFare control, station agent, Metro Card vending machines, crossover
L2Side platform Doors will open on the left
Platform 2
Southbound
Towards → Silk Institute
Next Station: Chikkabidarakallu
Platform 1
Northbound
Towards ← Train Terminates Here
Side platform Doors will open on the left
L2

See also

External links

Notes and References

  1. News: August 5, 2024 . Sridhar Vivan . Green line trial runs kick off in August . 2024-08-07 . Bangalore Mirror . en.
  2. News: Ghoshal . Sudeshna . August 6, 2024 . Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today . August 7, 2024 . Mint . en.