Mass Rapid Transit Line 5 | |
Type: | Rapid transit |
System: | Dhaka Metro Rail |
Status: | Approved |
Locale: | Greater Dhaka, Bangladesh |
Stations: | 29 |
Daily Ridership: | (estimated) |
Owner: | Road Transport and Highways Division |
Operator: | Dhaka Mass Transit Company Limited |
Character: | Elevated and underground |
Depot: |
|
Linelength: | Northern Route: 20km (10miles) Southern route: 17.3km (10.7miles) |
Tracks: | 2 |
Map State: | show |
The MRT Line 5 (romanised: Em-Ar-Ti Lain Pachh) is an approved mass rapid transit line of Dhaka Metro Rail. It will be the third line of the Dhaka Metro Rail system. This line comprises Northern Route and Southern Route. The construction of the MRT Line 5's Northern Route began in 5 November 2023 and is scheduled to commence operation by 2028.[1]
In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[2] The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka.[3] The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6.[4]
The construction of the Northern Route of the MRT Line 5 will start in July 2023 and will end by 2028.[5]
Code | Name | Connections | Location | Opened | |
---|---|---|---|---|---|
English | Bengali | ||||
1 | হেমায়েতপুর | Savar Upazila | Planned | ||
2 | বালিয়ারপুর | ||||
3 | বিলামালিয়া | ||||
4 | আমিনবাজার | ||||
5 | গাবতলী | Mirpur Model Thana | |||
6 | দারুস সালাম | Darus Salam Thana | |||
7 | মিরপুর ১ | Mirpur Model Thana | |||
8 | মিরপুর ১০ | ||||
9 | মিরপুর ১৪ | ||||
10 | কচুক্ষেত | Cantonment Thana | |||
11 | বনানী | Banani Thana | |||
12 | গুলশান ২ | Gulshan Thana | |||
13 | নতুন বাজার | Vatara Thana | |||
14 | ভাটারা |
The Southern Route of MRT Line 5 is still in the planning stages. There may be changes to the list of stations, including adding new stations, assigning different names to the stations or some stations getting eliminated from the line. Hence, the list of stations is not final and may be updated in the future.
Code | Name | Connections | Location | Opened | |
---|---|---|---|---|---|
English | Bengali | ||||
1 | গাবতলী | Mirpur Model Thana | Planned | ||
2 | টেকনিক্যাল | Darus Salam Thana | |||
3 | কল্যাণপুর | Kallyanpur | |||
4 | শ্যামলী | Adabar Thana | |||
5 | কলেজ গেট | Tejgaon Thana | |||
6 | আসাদ গেট | Mohammadpur Thana | |||
7 | রাসেল স্কয়ার | Dhanmondi Thana | |||
8 | কাওরান বাজার | Karwan Bazar | |||
9 | হাতিরঝিল | ||||
10 | তেজগাঁও | Tejgaon Thana | |||
11 | আফতাবনগর | Gulshan Thana | |||
12 | আফতাবনগর সেন্টার | ||||
13 | আফতাবনগর পশ্চিম | ||||
11 | নাসিরাবাদ | Badda Thana | |||
15 | দাশেরকান্দি |