Brown Line (Bangkok) Explained

MRT Brown Line
รถไฟฟ้าสายสีน้ำตาล
Type:Monorail
System:MRT
Status:Design phase, planned tender in late 2024
Locale:Bangkok and Nonthaburi, Thailand
Start:Nonthaburi Civic Center
End:Yaek Lam Sali
Stations:20
Daily Ridership:est. 70,000-80,000
Owner:Mass Rapid Transit Authority of Thailand
Character:Elevated
Linelength:22.1km (13.7miles) (est.)
Tracks:2 monorail tracks
Speed:80km/h

The MRT Brown Line is a 22.1 km rapid transit line in Bangkok, Thailand proposed monorail mass transit line from Nonthaburi Civic Centre, Nonthaburi Province to Lam Sali intersection, Bang Kapi District. 20 stations are proposed for the line and the expected cost for the project is 48 billion baht. The line has been integrated for 7.2 km with the N2 expressway project and a feasibility study has been completed. The MRT Brown line will interchange with 7 other mass transit lines.

The MRT Brown line investment plan was approved by the MRTA Board in June 2019 for final detailed design,[1] which was expected to be completed by December 2020. However, the detailed design will take longer and is not expected to be completed until September 2022.[2] In mid May 2022, the MRTA received updated consultants studies and started drafting the TOR for the project.[3] On 18 May 2023, the MRTA Board meet to approve the updated designs & analysis and draft tender documents for the line. The documents will be submitted to the Ministry of Transport in the coming months.[4]

The project will seek final Cabinet approval in early 2024 and is now planned to be tendered as a PPP project in late 2024.

Route Alignment

The MRT Brown Line starts at Nonthaburi Civic Centre where it interchanges with both the MRT Purple Line & MRT Pink Lines. It heads east along Ngam Wong Wan road through Khae Rai intersection and then Vihavadi-Rangsit road to interchange with the SRT Dark Red Line at Bang Khen. The Brown line continues past Kasetsart University to interchange with the BTS Sukhumvit Line at Kasetsart University on Phahon Yothin Road.

The line continues east along Prasote Manukitch Road (AKA Kaset-Nawamin Road) past Chalong Rat Expressway (interchanging with the proposed BMA Grey Line) to Nawamin Road. The line then turns south along Nawamin Road over Lam Phang Phuai lake and past Klong Chan Stadium. The line continues further southeast along Nawamin Road where it then terminates at Ramkhamhaeng rd (soi 129/1), Lam Sali junction to interchange with the MRT Orange Line and MRT Yellow Line.

History

The line was first proposed as the Gold Line by the Pheu Thai party (พรรคเพื่อไทย) for the Bangkok Governors election held in March 2013. This was in response to objections by Kasetsart University and as an alternative to a long-proposed elevated Expressway extension, the N2 expressway project.[5] However, the Pheu Thai candidate did not win the election and the Gold Line proposal was dropped with the then Deputy Minister of Transport stating that land appropriation costs were too high.[6] (The Gold Line name was later used for the BMA Gold Line).

Subsequently, the Office of Transport and Traffic Policy and Planning (OTP) reworked the Gold Line proposal into a new MRT Brown Line monorail proposal and this was endorsed by the MRTA Board in August 2013.[7] The route was under preliminary study by OTP from June 2013, but did not progress much before the May 2014 coup and change of government. Subsequently, the route was finalised by OTP and public hearings into the project were held during 2017 as the government proposed integrating the design with a new expressway. In mid-2017, the MOT announced that a final feasibility study would be completed over 14 months.

Note: This line is not to be confused with the original OTP 2004 13 km MRT Brown Line proposal from Bangkapi to Min Buri which was taken to the 2005 election. In 2009, this plan was subsequently changed and the original 13  km Brown Line was merged into an extended MRT Orange Line, which is currently under construction.

Progress

In August 2013, the MRTA approved the MRT Brown line in principle to complete the design by 2016 with an expected 3-year construction period for a 2021 opening.[8] However, the line was delayed while a long planned expressway along much of the same route was prioritized.[9] Public hearings on the Brown line was held in 2017. The MOT announced that a 14-month feasibility study into the line would be completed by 2018.[10]

The feasibility study was undertaken during the same period where design for the N2 expressway (which runs along Kaset-Namawin rd) was being finalised by EXAT without catering for the MRT Brown Line. Work was expected to commence on the expressway in 2019.[11] OTP and MOT subsequently proposed an integrated design and construction of the Brown Line jointly with the N2 expressway which was approved by Cabinet. However, the Brown Line crossing of Vihavadi-Rangsit rd and the Don Muang elevated expressway might require a diversion of the Brown Line further north for the line to pass at this point depending on the final route design of the N2 expressway.[12] In February 2018, OTP confirmed that the study integrating the MRT Brown Line with the Expressway design would be done by June 2018.[13]

By August 2018, OTP had completed the feasibility study and conducted public hearings. Although, there was much public support for building the MRT Brown line, public opposition to the N2 expressway remained high. OTP intended to submit the project for Cabinet approval by the end of October 2018.[14] In early June 2019, the MRTA Board approved the investment plan for the Brown Line and integrated design with the N2 Expressway conducted by EXAT.[15] The design process was expected to be completed by late 2020 after further discussions regarding land access around Kasetsart University were conducted between EXAT, the MRTA, the Rural Highways Department and Kasetsart University in June 2020.[16] In early November 2020, the MRTA Governor stated that the OTP had submitted the preliminary Environment (EIA) to the National Environment Board for review and that land expropriation surveys in some areas along the route were still being finalised.[17] Final design was expected to be completed by December 2020.[18] However, the detailed design will take longer and is not expected to be completed until September 2022.[19]

The line will require the 435 plots of land along the route to be appropriated in order for the line to be built.[20]

In May 2023, the MRTA approved another feasibility study to be completed by December 2023 with construction tentatively starting from 2025.[21]

Stations

The 22.1 km Brown line is proposed to have 20 stations:

Note: Station names are provisional.

CodeStation NameTransfersProvince
B1Nonthaburi Civic CenterNonthaburi
B2Khae Rai
B3Khlong Yat Lao (Ngam Wong Wan 12)Bangkok
B4Pracha Chuen intersection
B5Chinnakhet
B6Bang Khen
B7Kasetsart University (Gate 2)
B8Kasetsart University Kasetsart University
B9Bang Bua
B10Lat Pla Khao
B11Prasoet Manu Kit 18
B12Sukhonthasawat
B13Chalong Rat Kaset Nawamin (proposed)
B14Khlong Lamchiak
B15Nuan Chan 11
B16Yaek Nawamin
B17Inthrarak
B18Nawamin Phirom
B19Seri Thai/Khlong Chan Stadium
B20Yaek Lam Sali (under construction)

See also

External links

Notes and References

  1. Web site: บอร์ดรฟม.ไฟเขียวควักเอง 1.4 พันล้านสร้างฐานรากรถไฟฟ้าสายสีน้ำตาล คาดสร้าง. 6 June 2019.
  2. News: รฟม.จ้างทบทวนออกแบบโมโนเรลสายใหม่"สีน้ำตาล" . Daily News . 29 November 2021.
  3. News: ได้เวลาลุย! รถไฟฟ้าสายใหม่ "สีน้ำตาล" 4.8หมื่นล้าน . Daily News . 15 May 2022.
  4. News: รถไฟฟ้าสายใหม่ "สีน้ำตาล" วัดใจรัฐบาลได้ไปต่อหรือล้ม . Daily News . 23 May 2023.
  5. News: Changing MRT line near Kasetsart will cost B10bn . Bangkok Post . 7 December 2019.
  6. News: City expressway plan redrawn to go north. Bangkok Post.
  7. News: MRTA endorses Brown Line (Khae Rai-Lam Salee) . The Nation . 21 August 2013.
  8. News: MRTA endorses Brown Line (Khae Rai-Lam Salee) . The Nation . Bangkok . 21 August 2013 . 6 November 2013 .
  9. Web site: ผู้จัดการออนไลน์ รวดเร็ว สด ทุกเหตุการณ์.
  10. News: Govt mulls Brown Line feeder route to connect rail network . Bangkok Post . 27 July 2017.
  11. Web site: กทพ.ลุ้น สผ.เคาะ EIA ทางด่วน N2 จ่อชง ครม.ปลายปีนี้ เริ่มก่อสร้างปี 61. 18 September 2017.
  12. News: เคาะรถไฟสายสีน้ำตาล เสนอ'บิ๊กตู่'พิจารณามี.ค.นี้.... อ่านต่อได้ที่ . Post Today . 24 January 2018.
  13. News: Brown Line monorail, expressway take shape . Bangkok Post . 20 February 2018.
  14. News: Monorail plan heads to cabinet . Bangkok Post . 24 August 2018.
  15. Web site: บอร์ดรฟม.ไฟเขียวควักเอง 1.4 พันล้านสร้างฐานรากรถไฟฟ้าสายสีน้ำตาล คาดสร้าง. 6 June 2019.
  16. News: โมเดล "โดมครอบทางด่วน" ลุ้น "ม.เกษตร" เปิดทางปักตอม่อ . Prachachat.net . 23 June 2020.
  17. News: รฟม.เดินหน้าออกแบบฐานรากตอม่อสายสีน้ำตาล พร้อมลุยเปิดประมูลปี 66 . Matichon Online . 4 November 2020.
  18. Web site: บอร์ดรฟม.ไฟเขียวควักเอง 1.4 พันล้านสร้างฐานรากรถไฟฟ้าสายสีน้ำตาล คาดสร้าง. 6 June 2019.
  19. News: รฟม.เดินหน้าออกแบบฐานรากตอม่อสายสีน้ำตาล พร้อมลุยเปิดประมูลปี 66 . Daily News . 29 November 2021.
  20. News: รถไฟฟ้าสายใหม่ "สีน้ำตาล" วัดใจรัฐบาลได้ไปต่อหรือล้ม . Daily News . 23 May 2023.
  21. Web site: 2023-05-23 . Brown Line work could start in 2025 . 2024-02-28 . inkl . en.