METRORail Green Line explained

Box Width:275px
Green Line
Type:Light rail/Streetcar
System:METRORail
Status:Operating
Locale:Houston, Texas
Start:Theater District (west)
End:Magnolia Park Transit Center (east)
Stations:9
Daily Ridership:4,188 (September 2023)[1]
Open:May 23, 2015[2]
Operator:METRO
Character:Street running downtown, exclusive right-of-way elsewhere
Linelength:3.31NaN1
Electrification:Overhead cantenary
Elevation:Street level until Altic/Howard Hughes, then returns to street level. Elevated overpass between the streets.

The Green Line[3] is a 3.31NaN1[4] [5] [6] METRORail light rail/streetcar line operated by METRO in Houston, Texas, serving the East End area. The first seven-station segment of this line opened on May 23, 2015. The two-station eastern end of this route was delayed due to issues over crossing Union Pacific Railroad tracks, but eventually opened in January 2017.[7]

Route

Between Theater District and EaDo/Stadium stations, the Green Line shares tracks with the Purple Line. In downtown, the eastbound track runs along Capitol Street, while its westbound counterpart runs along Rusk Street. On both of these streets, trains operate in mixed traffic using the rightmost lane.[8] Transfers to the Red Line will occur at the Fannin Station. Before crossing I-69/US 59, the 2 tracks converge onto a dedicated right-of-way along the south side of Texas Avenue to EaDo/Stadium Station, which will give access to the BBVA Compass Stadium where the MLS soccer team Houston Dynamo & Texas Southern Tigers football play. East of EaDo/Stadium Station, the Green Line and the Purple Line diverge, with the Purple Line turning south and the East End Line continuing east.

The Green line continues in a dedicated right-of-way on the south side of Harrisburg Road, which transitions to the center of Harrisburg Road at Middleton Street. It remains in the median to its former eastern terminus at Altic/Howard Hughes Station.

A six-block-long bridge carries the line over freight rail tracks located on Harrisburg and Hughes, extending the line eastward to the Magnolia Transit Center. Construction of this bridge began in March 2015 and finished in late 2016, with the extension opening on January 11, 2017.[9] [10] [11]

Construction

Phase I of construction was due to be completed by spring 2012, with Phase II scheduled to be complete by summer 2012,[12] and a planned opening in 2013 or 2014. By fall 2010, it became clear that a late 2013 opening was impossible, and the line would not open until late 2014.[13]

Problems with non-MetroRAIL construction projects downtown, as well as with the axle-counters used to regulate light rail traffic, subsequently pushed back the opening of the line to April and then May 2015.[14] [15]

Opposition to east end of line

As early as about a month after construction began for this line, it was reported that there opposition existed to this line, particularly because of the installation of the six-block-long bridge meant to avoid the freight railroad at the east end of the line.[16] Further opposition to this line arose when area resident began to notice a loss in business in areas where construction was taking place.[17] Subsequently, Metro decided to build the western portion of the line in the meantime, while the construction of the portion of the line between Altic/Howard Hughes Station and Magnolia Transit Center Station was deferred.

An overpass segment meant to avoid the freight railroad track and to complete the line between Altic/Howard Hughes Station and Magnolia Transit Center is expected to take up to 18 months to complete and broke ground in March, 2015.[18] [19] [20] [21] The bridge was completed in early 2017, and the first train traveled across it on January 9, with regular service beginning on the 11th, which marked the completion of the Green Line to its Magnolia terminus.[22] [23]

Stations

The following is a list of stations for the Green Line, listed in order from west to east.[24]

METRORail line key

Red Line
Purple Line

StationOpening
year
Connections
METRORailMETRO Bus
2015 20, 30, 44, 85, 151, 160/161/162, Park & Ride routes
Central Station (Capitol/Rusk) 2015 6, 11, 51/52, 137
2015
2015
2015 29
2015 80
2015
2017
2017 20, 28, 38, 50, 76

Expansion

A possible expansion for the line would bring it south from the Magnolia Transit Center to converge with the Purple Line at a station yet to be named, and moving along the same right-of-way to Hobby Airport.[25]

See also

References

External links

Notes and References

  1. Web site: Executive Summary - September 2023 . Houston METRO. October 21, 2023.
  2. Web site: Railfest Celebrates New Rail Lines. Metropolitan Transit Authority of Harris County. 23 May 2015.
  3. Web site: East End Line . . 2015-01-15 . https://web.archive.org/web/20130121123909/http://www.gometrorail.org/go/doc/2491/406635/ . 2013-01-21 . dead .
  4. Web site: East End Line (landing page) . . 2015-01-15.
  5. Web site: METRORail . Metropolitan Transit Authority of Harris County, Texas . 2015-08-11.
  6. News: Abrahams. Tom . East End light rail reaches milestone . KTRK-TV ABC13 . April 16, 2010 . 2015-01-15.
  7. Web site: Rivas. Elissa. 2017-01-11. METRORail Green Line opens Wednesday morning. 2020-08-31. ABC13 Houston. en.
  8. Web site: Station Guide Downtown . . 3–4 . March 7, 2014 . 2014-07-24.
  9. East End Harrisburg Overpass Project Celebrates with Groundbreaking. Metropolitan Transit Authority of Harris County. March 11, 2015. May 23, 2015.
  10. Web site: Metro completes light rail line with new overpass just before Super Bowl. Houston Business Journal. January 11, 2017. January 20, 2024.
  11. https://upload.wikimedia.org/wikipedia/commons/e/ed/Houston_MetroRail_Harrisburg_%40_Wayside_Dr_2017-02-08.jpg
  12. Web site: Construction Schedule . . 2015-01-15.
  13. News: Rail Lines Will Not Meet Oct. 2013 Deadline . KRIV (FOX 26 Houston) . September 9, 2010 . 2015-01-15 . dead . https://archive.today/20150118164252/http://www.myfoxhouston.com/story/18203302/rail-lines-will-not-meet-oct-2013-deadline . January 18, 2015 .
  14. Construction Issues Prompt New April 2015 Rail Opening Date . Metropolitan Transit Authority of Harris County (Metro) . September 25, 2014 . 2015-01-15.
  15. News: Begley . Dug . More trouble for rail lines as opening pushed to next year . . . September 17, 2014 . 2015-01-14.
  16. News: East End residents angered over Metro's plans to build bridge . KHOU 11CBS . October 22, 2009 . 2015-01-15.
  17. News: Cisneros. Cynthia . East-end light rail construction faces opposition . KTRK-TV ABC13 . August 23, 2010 . 2015-01-15.
  18. News: Delaughter . Gail . Major Decision Expected On East End Light Rail Project . Houston Public Media . May 21, 2014 . 2014-07-24 . https://web.archive.org/web/20140812174233/http://www.houstonpublicmedia.org/news/major-decision-expected-on-east-end-light-rail-project/ . August 12, 2014 . dead .
  19. News: Begley. Dug . Metro rejects pleas for delay, proceeds with East End overpass plan . . . May 22, 2014 . 2014-07-24.
  20. News: Delaughter . Gail . Metro Unveils Preliminary Designs For East End Overpass . Houston Public Media . July 2, 2014 . 2014-07-24 . https://web.archive.org/web/20140812174240/http://www.houstonpublicmedia.org/news/metro-unveils-preliminary-designs-for-east-end-overpass/ . August 12, 2014 . dead .
  21. News: Hennes. Rebecca . Groundbreaking of Metro overpass unites community . . . March 14, 2015 . 2015-03-23.
  22. Web site: Metro completes light rail line with new overpass just before Super Bowl. Houston Business Journal. January 11, 2017. January 13, 2017.
  23. https://upload.wikimedia.org/wikipedia/commons/e/ed/Houston_MetroRail_Harrisburg_%40_Wayside_Dr_2017-02-08.jpg
  24. Web site: East End Line [map] ]. . March 27, 2012 . 2015-01-15 . https://web.archive.org/web/20130320182504/http://www.gometrorail.org/clients/2491/455975.pdf . March 20, 2013 . dead .
  25. Web site: Metro Light Rail (Houston, Sugar Land, Galveston: 2015, university, tax) - Texas (TX) - City-Data Forum.