Country: | HUN |
Type: | Mb |
Route: | 85 |
Map: | M85 Autóút Hungary.png |
Map Notes: | in use planned other highways |
Image Notes: | M85 near Enese |
Length Km: | 83 |
Length Notes: | 95km (59miles) planned |
Established: | 2008 |
Terminus A: | near Győr |
Junction: |
|
Terminus B: | Sopron border with |
Counties: | Győr-Moson-Sopron |
Cities: | Győr, Csorna, Sopron |
The M85 expressway (Hungarian: M85-ös autóút) is a Hungarian expressway connecting Győr to Sopron. It will eventually connect M1 motorway to the Austrian border.
Section | Length | Opened | Notes | |
---|---|---|---|---|
Győr nyugat (M1) – Enese | 82NaN2 | 16 June 2015[1] | Built between 2013 – 2015. | |
Enese bypass | 72NaN2 | 21 December 2011 | Built between 2009 – 2011. | |
Enese – Kóny | 32NaN2 | 16 June 2015 | Built between 2013 – 2015. | |
Kóny – Csorna | 62NaN2 | 9 September 2015[2] | Built between 2013 – 2015. | |
Csorna bypass I. | 52NaN2 | 9 September 2015 | Segment I. (East), built between 2013 – 2015. Common route with M86 expressway. This section was extended 2x3 lane. | |
Csorna bypass II. (M86 junction - Csorny nyugat) | 4.52NaN2 | 15 December 2017[3] | Segment II. (West), built between 2015 – 2017. | |
Csorna nyugat – Sopron kelet | 512NaN2 | 16 December 2020 | Built between 2017 – 2020. | |
Sopron kelet – Balf | 2.52NaN2 | 9 June 2021 | Built between 2017 – 2021. | |
Balf – Sopron észak | 6.42NaN2 | 10 December 2021 | Built between 2018 – 2021. | |
Sopron észak to the border | 4.62NaN2 | Planned in 2024 | Under construction, with Sopron Tunnel |
County | km | Type | Destination | Notes | |
---|---|---|---|---|---|
Győr-Moson-Sopron | 0 | Main road 1 – Győr / – Mosonmagyaróvár, towards to Vienna (A), Bratislava (SK) /---- Main road 85 – Ikrény /----- – Budapest and Vámosszabadi | The eastern terminus of the expressway.----Kilometrage starting point----Roundabout and interchange junction | ||
align=center | 8 | align=center | Rábapatona | ||
align=center | 10 | align=center | Lébény, Bezi / Enese, Tét | ||
align=center | 16 | align=center | Kóny / Rábcakapi | Connecting to petrol station and Truck parking. | |
align=center | 21 | align=center | |||
align=center | 23 | align=center | – Mosonmagyaróvár---- – Sopron / Szombathely, towards to Marbor (SLO) | The northern terminus of the common road with M85-M86 expressways, and E65 route.----The eastern part of Csorna bypass.----The northern terminus of 2x3 lane road. | |
align=center | align=center | over the Győr–Sopron railway line | |||
align=center | 25 | align=center | over the Pápa–Csorna railway line | ||
align=center | 27 | align=center | – Sopron, Kapuvár---- Szombathely, towards to Marbor (SLO) | The southern terminus of the common road with M85-M86 expressways, and E65 route.----The southern part of Csorna bypass.----The southern terminus of 2x3 lane road. | |
align=center | align=center | over the Hegyeshalom–Szombathely railway line | |||
align=center | 32 | align=center | Jobaháza, Farád / Csorna nyugat | nyugat means West | |
40 | Babóti pihenőhely | parking, WC, and water (petrol station in the future)----pihenőhely means Rest area | |||
align=center | 44 | align=center | Beled, Hövej / Kapuvár | ||
align=center | 53 | align=center | Fertőd, Fertőendréd | Connecting to Main road 85. | |
align=center | 55 | align=center | Széchenyi pihenőhely | parking, WC, and water | |
align=center | 60 | align=center | Kőszeg, Lövő / Fertőszentmiklós | ||
align=center | 68 | align=center | under the Győr–Sopron railway line | ||
align=center | 72 | align=center | Main road 84 – Nagycenk / Sárvár | Connection to Sopron, and the Lake Balaton. | |
align=center | 78 | align=center | Hutbájd pihenőhely | parking, WC, and water----Tengelysúlymérő állomás means weigh in motion (traffic control) | |
align=center | 79 | align=center | over the Győr–Sopron railway line | ||
align=center | align=center | Ikva híd | híd means Bridge | ||
align=center | 82 | align=center | Main road 84 – Kópháza (border) / Sopron Centrum----Harka | ||
align=center | 85 | align=center | Sopron-Balf / Sopron-Pihenőkereszt | ||
align=center | 89 | align=center | Sopron észak / Fertőrákos | észak means North | |
90 | Soproni alagút | Length: 780 m----alagút means Tunnel | |||
93 | Main road 84 – Sopron nyugat / Ágfalva | nyugat means West----Western under construction section | |||
94 | Scarbantia pihenőhely | Planned | |||
95 | Soporn (H) – Klingenbach (AT) border crossing – Eisenstadt towards to Vienna | PlannedMaintenanceThe operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc.. This activity is provided by these highway engineers. PaymentHungarian system has 2 main type in terms of salary: 1, time-based fee vignettes (E-matrica);
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers: See alsoExternal links
|