Country: | HUN |
Type: | M |
Route: | 70 |
Map: | M70 Autóút Hungary.png |
Map Notes: | in use other highways |
Image Notes: | Korongi Bridge in M70 |
Length Km: | 21 |
Terminus A: | near Letenye |
Terminus B: | border with Slovenia → |
Counties: | Zala |
The M70 motorway (hu|M70-es autópálya) is a motorway in Hungary, connecting the M7 motorway to the A5 motorway in Slovenia.[1] [2] The road is 21 km long and has a speed limit of 130 km/h. The last section was completed in 2006. After the opening of the last missing sections of the M7 on August 19, 2008, there is a direct motorway link from Budapest to Slovenia. The expressway originally consisted of two lanes between Letenye and Tornyiszentmiklós interchanges. As a four-lane, full profile motorway, it opened on December 13, 2019 (see the Hungarian article for references in Hungarian). It was built by the Colas Group.[3]
Section | Length | Opened | Notes | |
---|---|---|---|---|
Letenye (M1) – Tornyiszentmiklós | 18.62NaN2 | Single carriageway: November 2004 Second carriageway: 13 December 2019 | ||
Tornyiszentmiklós to the border | 22NaN2 | Autumn of 2005 | Fully motorway |
County | km | Type | Destination | Notes | ||||||
---|---|---|---|---|---|---|---|---|---|---|
Zala | 0 | – Budapest, Nagykanizsa---- – Letenye → Zagreb (HR) | The southern terminus of the motorway, and E653 route.----Kilometrage starting point----trumpet interchange | |||||||
align=center | 1 | align=center | Korongi híd | Length: 115.6 m----híd means Bridge | ||||||
align=center | 2 | align=center | Main road 7 – Letenye, Zagreb (HR) / Budapest | |||||||
align=center | 11 | align=center | Csörnyeföld, Murarátka / Muraszemenye | Connecting to M70 Autohof | ||||||
align=center | 15 | align=center | Csörnyeföldi pihenőhely | parking, WC, and water----pihenőhely means Rest area | ||||||
align=center | align=center | Kerka híd | ||||||||
align=center | 18 | align=center | Lenti, Tornyiszentmiklós | |||||||
align=center | 20 | align=center | Tornyiszentmiklósi pihenőhely | |||||||
21 | Tornyiszentmiklós (H) – Pince (SLO) border crossing – Maribor towards to Ljubljana | Tornyiszentmiklós border crossing to Slovenia → A5 motorway.----The northern terminus of the motorway, and E653 concurrency.MaintenanceThe operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc. This activity is provided by this highway engineer.
PaymentSince 2015, the M70 motorway is fully tolled road. Hungarian system has 2 main type in terms of salary: 1, time-based fee vignettes (E-matrica);
2, county vignettes (vármegyei matrica); the highway can be used instead of the national sticker with the following county stickers: European route(s)
Significant structures
See alsoExternal links
|