Menderes–Konak Line | |
Native Name: | Menderes–Konak Hattı |
Native Name Lang: | Turkish |
Color: | 000000 |
Type: | Rapid transit |
System: | İzmir Metro |
Status: | Planned |
Locale: | İzmir, Turkey |
Start: | Konak, Konak (North) |
End: | Menderes, Menderes (South) |
Stations: | 18 |
Owner: | İzmir Metropolitan Municipality |
Operator: | İzmir Metro A.Ş. |
Linelength Km: | 22.3 |
Tracks: | 2 |
Linenumber: | 3 |
Electrification: | 750V DC Third rail, bottom contact |
Speed Km/H: | 100 |
Signalling: | Unattended operation with CBTC |
Map Name: | map_name |
Map State: | uncollapsed |
The M3 line, also referred as Menderes–Konak Line (tr|Menderes–Konak Hattı) is a planned ATO rapid transit line in İzmir, Turkey. The line has a total length of 22.3km (13.9miles) and would begin at Konak and run south into Menderes.[1] When completed, the line will become the second driverless metro line in İzmir, after the M2 line.
A tender was awarded in December 2019 for the implementation of the project of the line.[2] [3] The introductory meeting of the line, which will cost 2.105 billion euros, was held on 31 January 2023.[4]
The line will consist of eighteen stations, of which seventeen are new and one (Konak) will connect to the existing line. The list of stations are as follows: