Młynów metro station explained

Młynów
Style:Warsaw Metro
Coordinates:52.2377°N 20.9599°W
Operator:ZTM Warszawa
Other: Warszawa Młynów
171, 186, 190, 414, 523
N42, N43
Structure:Underground
Platforms:1 island platform
Levels:1
Tracks:2
Accessible:Yes
Code:C-7
Owned:ZTM Warszawa
Zone:1
Former:Moczydło (During planning phase)
Map Type:Poland Warsaw
Alternativemap:Masovian Voivodeship Relief location map.svg

Młynów is a M2 metro line Warsaw Metro station in Wola district, by the intersection of Górczewska and Syreny streets.

It is part of the extension of Line M2 from Rondo Daszyńskiego to Wola, with construction started in 2016. All three stations opened on April 4, 2020.[1]

The station is 168.2 m in length, and the cubic capacity at 56 636 m³. The blue colour scheme of the station refers to the nearby swimming pool in Moczydło estate.[2]

Description

The station is located 300 m west of the Institute of Tuberculosis and Lung Diseases (Polish: Instytut Gruźlicy i Chorób Płuc) of the Ministry of Health, and 300 m east of the Park Moczydło and Park Edwarda Szymańskiego.

The contractor for the station was Gülermak, which won the tender completed on 29 October 2015. The construction works began on 26 November 2016. Along with Księcia Janusza and Płocka, the station is part of the extension of the M2 metro line from Rondo Daszyńskiego to Wola. All three stations opened on April 4, 2020.[3]

External links

References

  1. Web site: Uruchamiamy wolskie stacje metra. 3 April 2020. 2020-04-03.
  2. Web site: Linia M2 - Metro . www.metro.waw.pl . 27 September 2021.
  3. Web site: Uruchamiamy wolskie stacje metra. 3 April 2020. 2020-04-03.