Luhansk power station | |
Name Official: | Луганська ТЕС |
Coordinates: | 48.7478°N 39.2624°W |
Country: | Ukraine |
Location: | Shchastia |
Status: | Destroyed due to shelling, not operating |
Commissioned: | 1956 |
Owner: | DTEK Skhidenergo |
Th Fuel Primary: | Coal |
Ps Units Operational: | 1 x 100 MW 3 x 175 MW 4 x 200 MW |
Ps Units Manu Model: | TAGMET LMZ Electrotyazhmash |
Ps Electrical Capacity: | 1,425 MW |
Luhansk power station (Ukrainian: Луганська ТЕС|translit=Luhanska TES, formerly Luhanskaya GRES) is a thermal power station north of Shchastia, near Luhansk, Ukraine. It was built between 1950 and 1956 and its first generator was connected to the grid on 30 September 1956. In 1957, 4 turbines and 7 boilers went in service. In 1958, it was completed.
Between 1979 and 2004, Luhansk power station was modernized. It consists today of 4 units with 200 MW, 3 units of 175 MW, and 1 unit of 100 MW. The generator building of Luhansk power station, which has 3 tall chimneys, is long.
On 3 September 2014, Ukrainian Aidar Battalion commander Serhiy Melnychuk announced that they had mined the plant (which gives electricity to 98% of Luhansk Oblast), and that they will blow it up if the separatist forces advanced.[1] On 17 September, part of the plant exploded due to combat in the zone, while firefighters couldn't act due to the fire and the mines planted.[2]
The plant suspended work on 21 February 2022, head of the Luhansk Regional Administration Serhiy Haidai stated this was due to shelling by the Russian separatist forces in Donbas.[3] The next day the plant was shelled again.[4]
The plant completely shut down due to shelling and was permanently damaged beyond repair.[5]