Lufeng Nuclear Power Plant | |
Country: | China |
Status: | u |
Construction Began: | 8 September 2022 |
Owner: | CGN Lufeng Nuclear Power Co., Ltd |
Np Reactor Type: | PWR |
Ps Units Planned: | 4 × 1160 MW |
Ps Units Uc: | 2 × 1116 MW |
The Lufeng Nuclear Power Plant (Chinese: Chinese: 陆丰核电站) is a nuclear reactor under construction in the Guangdong province of eastern China. It is planned to house 6 pressurized water reactors (PWRs).[1]
CGN Lufeng Nuclear Power Corporation has been working on developing a nuclear plant in Lufeng, Shanwei since 2013.[2] The National Development and Reform Commission (NDRC) approved the plant in 2014, starting with two AP1000 reactors. The National Nuclear Safety Administration (NNSA) gave its approval in 2015. Site work began but, construction of these units has not. In April 2022, the government approved the construction of two Hualong One reactors, which were designated Units 5 and 6.[1]
Construction of the first unit began on 8 September 2022[3] and construction of the second unit on 26 August 2023.[4] The first unit is expected to begin operation in 2028, and the second unit in 2029.[1]
Unit | Type | Net Capacity | Gross Capacity | Construction start | Operation start (planned) | Notes | |
---|---|---|---|---|---|---|---|
Phase I | |||||||
Lufeng 5 | Hualong One | 1116 MW | 1200 MW | 8 Sept 2022 | 2028 | [5] | |
Lufeng 6 | Hualong One | 1116 MW | 1200 MW | 26 Aug 2023 | 2029 | [6] | |
Phase II | |||||||
Lufeng 1 | CAP1000 | 1160 MW | |||||
Lufeng 2 | CAP1000 | 1160 MW | |||||
Lufeng 3 | CAP1000 | 1160 MW | |||||
Lufeng 4 | CAP1000 | 1160 MW |